Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
Information Notice 1999-14, Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick | 5 May 1999 | Unanticipated Reactor Water Draindown at Quad Cities Unit 2, Arkansas Nuclear One Unit 2, & FitzPatrick |
ML20248L546 | 5 June 1998 | Forwards Draft Proposed TS & Bases Rev,Incorporating Changes Responsive to 980416 RAI |
NRC Generic Letter 1998-02 | 28 May 1998 | NRC Generic Letter 1998-002: Loss of Reactor Coolant Inventory and Associated Potential for Loss of Emergency Mitigation Functions While in a Shutdown Condition |
Information Notice 1997-83, Recent Events Involving Reactor Coolant System Inventory Control During Shutdown | 5 December 1997 | Recent Events Involving Reactor Coolant System Inventory Control During Shutdown |
Information Notice 1996-65, Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown | 11 December 1996 | Undetected Accumulation of Gas in Reactor Coolant System and Inaccurate Reactor Water Level Indication During Shutdown |
Information Notice 1996-56, Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power | 22 October 1996 | Problems Associated with Testing, Tuning, or Resetting of Digital Control Systems While at Power |
Information Notice 1996-42, Unexpected Opening of Multiple Safety Relief Valves | 5 August 1996 | Unexpected Opening of Multiple Safety Relief Valves |
Information Notice 1996-37, Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown | 18 June 1996 | Inaccurate Reactor Water Level Indication and Inadvertent Draindown During Shutdown |
Information Notice 1996-05, Partial Bypass of Shutdown Cooling Flow from Reactor Vessel | 18 January 1996 | Partial Bypass of Shutdown Cooling Flow from Reactor Vessel |
Information Notice 1994-52, Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 | 15 July 1994 | Inadvertent Containment Spray and Reactor Vessel Draindown at Millstone Unit 1 |
Information Notice 1994-36, Undetected Accumulation of Gas in Reactor Coolant System | 24 May 1994 | Undetected Accumulation of Gas in Reactor Coolant System |
Information Notice 1993-89, Potential Problems with BWR Level Instrumentation Backfill Modifications | 26 November 1993 | Potential Problems with BWR Level Instrumentation Backfill Modifications |
Information Notice 1993-62, Thermal Stratification of Water in BWR Reactor Vessels | 10 August 1993 | Thermal Stratification of Water in BWR Reactor Vessels |
Information Notice 1993-27, Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization | 8 April 1993 | Level Instrumentation Inaccuracies Observed During Normal Plant Depressurization |
NRC Generic Letter 1992-04 | 19 August 1992 | NRC Generic Letter 1992-004 - Resolution of Issues Related to Reactor Vessel Water Level Instrumentation in BWRs Pursuant to 10 CFR 50.54(F) |
Information Notice 1992-16, Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown | 25 February 1992 | Loss of Flow from the Residual Heat Removal Pump During Refueling Cavity Draindown |
Information Notice 1990-22, Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units | 23 March 1990 | Unanticipated Equipment Actuations Following Restoration of Power to Rosemount Transmitter Trip Units |
IR 05000155/1988016 | 3 August 1988 | Insp Rept 50-155/88-16 on 880718-21.No Violations Noted. Major Areas Inspected:Emergency Preparedness Exercise of Key Functions & Locations During Exercise,Licensee Action on Previously Identified Items & Emergency Plan Activation |
ML20195D056 | 14 July 1988 | Annual Emergency Exercise Scenerio for 1988 |
ML20206F861 | 10 April 1987 | Responds to NRC Re Violations Noted in Insp Rept 50-155/86-13.Corrective actions:VOP-7068 Replaced,Per Plant Mod Sc 86-019 & Valve Actuator Removed from Eeq List |
ML20212P689 | 6 March 1987 | Forwards Justifications for Continued Operation for butyl- Rubber & Polyethylene Insulated Cables,In Response to Concerns Resulting from Environ Equipment Qualification Insp During Wk of 860915 |
IR 05000155/1985021 | 4 February 1986 | Insp Rept 50-155/85-21 on 851101-860123.No Violations or Deviations Noted.Major Areas Inspected:Operational Safety, Maint & Surveillance Observations & Generic Ltrs.Safety Items Identified |
NRC Generic Letter 1985-08 | 23 May 1985 | NRC Generic Letter 1985-008: 10 CFR 20.408 Termination Reports - Format |
NRC Generic Letter 1985-07 | 2 May 1985 | NRC Generic Letter 1985-007: Implementation of Integrated Schedules for Plant Modifications |
ML031150585 | 29 January 1985 | Withdrawn NRC Generic Letter 1985-004: Operator Licensing Examinations |