Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23303A136 | 27 October 2023 | Enclosure C - Pnpp Technical Specification Bases, Revision 18 |
ML21361A217 | 20 December 2021 | Supplemental Information for Revision 22 to Updated Safety Analysis Report, Revision 13 to Technical Specification Bases TS Bases |
ML21307A207 | 28 October 2021 | 2 to Updated Safety Analysis Report, Revision 13 Technical Specifications Bases TS Bases |
L-20-166, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements | 24 September 2020 | Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements |
L-12-359, Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System. | 23 October 2012 | Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System. |
L-12-318, License Amendment Request for Adoption of TSTF-275-A, Revision 0, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-up, and TSTF-300-A, Revision 0 | 5 September 2012 | License Amendment Request for Adoption of TSTF-275-A, Revision 0, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-up, and TSTF-300-A, Revision 0 |
IR 05000440/2012002 | 24 April 2012 | IR 05000440-12-002, on 01/01/2012 - 03/31/2012, Perry Nuclear Power Plant, Outage Activities, Integrated Inspection Report |
IR 05000440/2011005 | 6 February 2012 | IR 05000440-11-005 and IR 07200069-10-001; Firstenergy Nuclear Operating Company: 10/01/2011 & 12/31/2011: Operability Determinations and Functionality Assessments, Surveillance Testing; Other Activities. Inspection Report |
L-11-335, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12. 2011 | 16 October 2011 | Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12. 2011 |
L-11-333, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011 | 13 October 2011 | Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011 |
L-11-331, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. | 11 October 2011 | License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. |
L-11-322, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. | 3 October 2011 | License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating. |
L-09-074, License Amendment Request to Provide Consistency in Division 3 Emergency Diesel Generator Start Time Technical Specification Surveillance Requirements | 30 June 2009 | License Amendment Request to Provide Consistency in Division 3 Emergency Diesel Generator Start Time Technical Specification Surveillance Requirements |
ML032530038 | 3 September 2003 | Submittal of Technical Specification Bases, Revision 4 |
ML20212J320 | 23 June 1999 | Forwards Proposed Change to STSs for Review & Comment.Change Would Remove TS Requirements for ESF Features to Be Operable After Sufficient Radioactive Decay Has Occurred to Ensure Off Site Doses Remain Below SRP Limits |
ML20216H936 | 14 April 1998 | Rev 1 to Proposed TS Bases,Reflecting Changes Made Since Original Implementation of TS in Improved Format in June 1996 |
ML20083A684 | 5 May 1995 | Proposed Tech Specs Re Changes to App a TSs |