Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23303A13627 October 2023Enclosure C - Pnpp Technical Specification Bases, Revision 18
ML21361A21720 December 2021Supplemental Information for Revision 22 to Updated Safety Analysis Report, Revision 13 to Technical Specification Bases TS Bases
ML21307A20728 October 20212 to Updated Safety Analysis Report, Revision 13 Technical Specifications Bases TS Bases
L-20-166, Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements24 September 2020Application to Revise Technical Specifications to Adopt TSTF-582, Reactor Pressure Vessel Water Inventory Control (RPV WIC) Enhancements
L-12-359, Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System.23 October 2012Response to NRC Bulletin 2012-01, Design Vulnerability in Electric Power System.
L-12-318, License Amendment Request for Adoption of TSTF-275-A, Revision 0, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-up, and TSTF-300-A, Revision 05 September 2012License Amendment Request for Adoption of TSTF-275-A, Revision 0, Clarify Requirement for EDG Start Signal on RPV Level - Low, Low, Low During RPV Cavity Flood-up, and TSTF-300-A, Revision 0
IR 05000440/201200224 April 2012IR 05000440-12-002, on 01/01/2012 - 03/31/2012, Perry Nuclear Power Plant, Outage Activities, Integrated Inspection Report
IR 05000440/20110056 February 2012IR 05000440-11-005 and IR 07200069-10-001; Firstenergy Nuclear Operating Company: 10/01/2011 & 12/31/2011: Operability Determinations and Functionality Assessments, Surveillance Testing; Other Activities. Inspection Report
L-11-335, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12. 201116 October 2011Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12. 2011
L-11-333, Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 201113 October 2011Supplemental Information for License Amendment Request Regarding Offsite Electric Power System Acceptability Until December 12, 2011
L-11-331, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.11 October 2011License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.
L-11-322, License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.3 October 2011License Amendment Request Regarding Use of a Delayed Access Circuit as a Required Offsite Circuit in Technical Specification 3.8.1, AC Sources - Operating.
L-09-074, License Amendment Request to Provide Consistency in Division 3 Emergency Diesel Generator Start Time Technical Specification Surveillance Requirements30 June 2009License Amendment Request to Provide Consistency in Division 3 Emergency Diesel Generator Start Time Technical Specification Surveillance Requirements
ML0325300383 September 2003Submittal of Technical Specification Bases, Revision 4
ML20212J32023 June 1999Forwards Proposed Change to STSs for Review & Comment.Change Would Remove TS Requirements for ESF Features to Be Operable After Sufficient Radioactive Decay Has Occurred to Ensure Off Site Doses Remain Below SRP Limits
ML20216H93614 April 1998Rev 1 to Proposed TS Bases,Reflecting Changes Made Since Original Implementation of TS in Improved Format in June 1996
ML20083A6845 May 1995Proposed Tech Specs Re Changes to App a TSs