Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML21160A264 | 9 June 2021 | 301 ADAMS 2A-2 |
IR 05000250/2020050 | 9 December 2020 | Special Inspection Report 05000250/2020050 and 05000251/2020050 |
IR 05000250/2019002 | 7 August 2019 | Integrated Inspection Report 05000250/2019002 and 05000251/2019002 |
IR 05000250/2017004 | 8 February 2018 | Nuclear Regulatory Commission Integrated Inspection Report 05000250/2017004 and 05000251/2017004 |
IR 05000250/2017008 | 12 May 2017 | NRC Reactive Inspection Report 05000250/2017008 and 05000251/2017008 |
IR 05000250/2014003 | 31 July 2014 | IR 05000250-14-003, 05000251-14-003; on 01/01/2014 - 03/31/2014; Turkey Point Nuclear Plant, Units 3 & 4; Surveillance Testing |
IR 05000250/2011004 | 27 October 2011 | IR 05000250-11-004, 05000251-11-004, on 7/1/2011 - 9/30/2011, Turkey Point Nuclear Power Plant, Units 3 and 4, Maintenance Effectiveness |
IR 05000250/2011003 | 27 July 2011 | IR 05000250-11-003 & 05000251-11-003; Florida Power & Light Company; on 04/01/2011 - 06/30/2011; Turkey Point Nuclear Plant, Unit 3 & 4, Equipment Alignment, NRC Integrated Inspection Report |
IR 05000250/2008003 | 30 July 2008 | IR 05000250-08-003, 05000251-08-003, on 4/1/2008 - 6/30/2008, Turkey Point Nuclear Power Plant, Units 3 and 4, Fire Protection, Refueling and Other Outage Activities, Problem Identification and Resolution |
IR 05000250/2008002 | 30 April 2008 | IR 05000250-08-002, 05000251-08-002; 01/01/2008 - 03/31/2008; Turkey Point Nuclear Power Plant, Units 3 and 4; Problem Identification and Resolution |
IR 05000250/2007005 | 29 January 2008 | IR 05000250-07-005 on 10/01/2007 - 12/31/2007 for Turkey Point, Units 3 and 4, Fire Protection, Operability Evaluations, Permanent Plant Modifications |
IR 05000250/2007003 | 17 July 2007 | IR 05000250-07-003 and 05000251-07-003, on 06/30/2007, Turkey Point, Unit 3 & 4 |
IR 05000250/2007002 | 19 April 2007 | IR 05000250-07-002 and IR 05000251-07-002 on 04/19/2007 Turkey Point Nuclear Plant |
IR 05000250/2004011 | 2 November 2004 | IR 05000250-04-011, 05000251-04-011, on 10/04-08/2004, for Turkey Point Nuclear Plant, Units 3 and 4, Identification and Resolution of Problems-Selected Issue Followup Inspection |
IR 05000250/2004008 | 23 July 2004 | IR 05000250-04-008, IR 05000251-04-008 on 06/07/2004 - 06/10/2004 and 06/21/2004 - 06/24/2004 for Turkey Point, Units 3 and 4; Safety System Design and Performance Capability Inspection |
ML17354A411 | 12 February 1997 | Provides Response to RAI to 10CFR50.54(f) Re Adequacy & Availability of Design Basis Info |
ML17354A284 | 7 April 1996 | Changes,Tests & Experiments Made as Allowed by 10CFR50.59 for Period Covering 941114-960407. |
ML17349A682 | 16 February 1993 | LER 93-001-00:on 930114,Westinghouse Notified Util That Wet Annular Burnable Absorber Assemblies Not Mfg Per Design Specs.Caused by Failure to Translate Design Requirement to Drawing.Absorber Design modified.W/930216 Ltr |
ML17348B093 | 30 June 1991 | Rept on Changes,Tests & Experiments Made W/O Prior Commission Approval for Period 900701-910630.W/910830 Ltr |
IR 05000250/1986045 | 13 January 1987 | Insp Repts 50-250/86-45 & 50-251/86-45 on 861103-1215. Violations Noted:Failure to Meet Requirements of Tech Spec 6.8.1 Re Written Procedures & Administrative Policies & 10CFR50,App B,Criterion Xvi Re Corrective Actions |