Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000333/20210038 November 2021Integrated Inspection Report 05000333/2021003
IR 05000333/202000411 February 2021Integrated Inspection Report 05000333/2020004
IR 05000333/201700118 June 2018Errata for James A. Fitzpatrick Nuclear Power Plant - Integrated Inspection Report 05000333/2017001
IR 05000333/201300224 April 2013IR 05000333-13-002; 01/01/2013 - 03/31/2013; James A. FitzPatrick Nuclear Power Plant (Fitzpatrick); Maintenance Effectiveness, Problem Identification and Resolution, and Other Activities
IR 05000333/199800528 September 1998Insp Rept 50-333/98-05 on 980727-0814.Violations Noted. Major Areas Inspected:Engineering
IR 05000333/199700717 November 1997Insp Rept 50-333/97-07 on 970831-1026.Violation Noted.Major Areas Inspected:Operations,Maint,Engineering & Plant Support
IR 05000333/19930205 November 1993Insp Rept 50-333/93-20 on 930905-1009.No Violations Noted. Major Areas Inspected:Plant Operations,Maintenance, Engineering & Plant Support
JAFP-91-0359, Responds to NRC Re Violations Noted in Insp Rept 50-333/90-09.Corrective Actions:Surveillance Procedures Revised to Clearly State Required Configuration Criteria to Ensure 3 H Rated Fire Barrier Penetration Design14 June 1991Responds to NRC Re Violations Noted in Insp Rept 50-333/90-09.Corrective Actions:Surveillance Procedures Revised to Clearly State Required Configuration Criteria to Ensure 3 H Rated Fire Barrier Penetration Design