3F0616-02, Nrg Commitment Change Report - June 201614 June 2016Nrg Commitment Change Report - June 2016
ML09327014118 November 2009Initial Exam 2009-301 Draft RO Written Exam
IR 05000302/200800316 July 2008IR 05000302-08-003 on 04/01/2008 - 06/30/2008 for Crystal River, Unit 3
IR 05000302/200700313 July 2007IR 05000302-07-003, on 04/01/2007 - 06/30/2007, Crystal River Unit 3; Flood Protection Measures
IR 05000302/200600325 July 2006IR 05000302-06-003, on April 1, 2006 - June 30, 2006, for Crystal River Unit 3
IR 05000302/200500527 January 2006IR 05000302-05-005; on 10/01/2005 - 12/31/2005; Crystal River Unit 3; Event Followup
IR 05000302/200500413 October 2005IR 05000302-05-004, on 07/01/2005 - 09/30/2005, Crystal River Unit 3; Flood Protection Measures
ML05053016817 February 2005Background Discussion Material for February 24-25, 2005 NRC Meeting Relating to Replacement for BAW-2374, Revision 1, Evaluation of OTSG Thermal Loads During Hot Leg Loca.
3F0105-02, License Amendment Request 289, Revision 0 Revised Improved Technical Specifications 3.5.2, Emergency Core Cooling Systems - Operating, 3.6.6, Reactor Building Spray & Containment Cooling Systems, 3.7.8, Decay Heat Closed Cycle.13 January 2005License Amendment Request #289, Revision 0 Revised Improved Technical Specifications 3.5.2, Emergency Core Cooling Systems - Operating, 3.6.6, Reactor Building Spray & Containment Cooling Systems, 3.7.8, Decay Heat Closed Cycle.
IR 05000302/200400522 October 2004IR 05000302-04-005, on 06/27/2004 - 09/25/2004; Crystal River Unit 3; Equipment Alignment, Fire Protection, Event Followup
IR 05000302/200400315 April 2004IR 05000302-04-003 on 12/28/03 - 03/27/04, for Crystal River Unit 3, Crystal River, Fl; Event Followup
IR 05000302/199800731 August 1998Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support
IR 05000302/19980048 June 1998Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support
ML20216G80910 April 1998Safety Evaluation Accepting Resolution of Crystal River Restart Issues Related to USI A-46 Program
3F0298-20, Forwards Suppl to Annual 10CFR50.59 Rept That Was Provided in .Attachment a Provides Descriptions of Changes to Facility as Described in FSAR That Were Implemented Between Dec 1996 & Nov 1997.No Tests or Experiments Done13 February 1998Forwards Suppl to Annual 10CFR50.59 Rept That Was Provided in .Attachment a Provides Descriptions of Changes to Facility as Described in FSAR That Were Implemented Between Dec 1996 & Nov 1997.No Tests or Experiments Done
ML20198J72910 January 1998Overall Restart Readiness
ML20198H02118 December 1997Summarizes 971211-12 Meetings W/Util.Purpose of Meeting to Discuss Status of Actions to Resolve Technical Issues & Progress Toward Readiness for Restart.List of Attendees & Util Handouts Encl
3F1297-24, Provides Supplemental Info to Support Util Response to NRC Request for Addl Info,Dtd 970128.Clarification to Util RAI Responses,Discussed During NRC Audit USI A-46 & Calculations Encl also.W/10 Oversize Drawings16 December 1997Provides Supplemental Info to Support Util Response to NRC Request for Addl Info,Dtd 970128.Clarification to Util RAI Responses,Discussed During NRC Audit USI A-46 & Calculations Encl also.W/10 Oversize Drawings
ML20140F10518 April 1997Rev 2 to Crystal River Unit 3 Mgt Corrective Action Plan (Mcap)
ML20141J69115 November 1996Summary of 961113 Meeting W/Crystal River Restart Panel in Atlanta,Ga.Purpose of Meeting to Develop Restart Plan, Develop Restart Task Checklist,Develop Restart Issues Checklist & to Schedule Future Meetings
ML20134K96231 October 1996Mgt Corrective Action Plan Phase II (Mcap II)
ML20134G21019 August 1996Discusses Results of Facility Investigation of 940904-05, make-up Tank Evolutions & Unauthorized Tests Conducted While Being Licensed SRO at Plant.Facility Be Advised That Violations Noted May Change as Result of Further NRC Review
3F0495-05, Updates NRC Re Related Actions That FPC Performed Since Svc Water Sys Operational Performance Assessment Conducted from 941003-1110.Summary of Major Actions Taken or Planned in Stated Broad Categories Encl25 April 1995Updates NRC Re Related Actions That FPC Performed Since Svc Water Sys Operational Performance Assessment Conducted from 941003-1110.Summary of Major Actions Taken or Planned in Stated Broad Categories Encl
ML20079A59821 February 1995SWS Operational Performance Insp Self Assessment
ML20078A3976 December 1994Allowable Swhe Tube Blockage Vs Vhs Temp
3F0792-03, Responds to NRC Re Violations Noted in Insp Rept 50-302/92-11.Corrective Actions:Valve EFV-14 & Associated Motor Operator Replaced W/Different Design.Similar Valves EFV-11,32 & 33 Also Modified9 July 1992Responds to NRC Re Violations Noted in Insp Rept 50-302/92-11.Corrective Actions:Valve EFV-14 & Associated Motor Operator Replaced W/Different Design.Similar Valves EFV-11,32 & 33 Also Modified
3F0492-06, Responds to NRC Ltr Re Concerns Noted in MOV Insp Rept 50-302/92-01 on 920106-10.Corrective Actions:Mechanical Engineer Assigned to Support MOV Program.Update for Implementation & Scheduling of MOV Program to Be Submitted13 April 1992Responds to NRC Ltr Re Concerns Noted in MOV Insp Rept 50-302/92-01 on 920106-10.Corrective Actions:Mechanical Engineer Assigned to Support MOV Program.Update for Implementation & Scheduling of MOV Program to Be Submitted
ML20245J05114 August 1989Forwards Insp Rept 50-302/89-200 on 890424-0505.Results of Insp Indicate That Deficiencies Exist in Areas of Procurement & Dedication of Commercial Grade Items Procured for Used in safety-related Applications
ML20248J62831 March 1989Pipe Rupture Analysis Criteria Outside Reactor Bldg Crystal River Unit 3