Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
3F0616-02, Nrg Commitment Change Report - June 2016 | 14 June 2016 | Nrg Commitment Change Report - June 2016 |
ML093270141 | 18 November 2009 | Initial Exam 2009-301 Draft RO Written Exam |
IR 05000302/2008003 | 16 July 2008 | IR 05000302-08-003 on 04/01/2008 - 06/30/2008 for Crystal River, Unit 3 |
IR 05000302/2007003 | 13 July 2007 | IR 05000302-07-003, on 04/01/2007 - 06/30/2007, Crystal River Unit 3; Flood Protection Measures |
IR 05000302/2006003 | 25 July 2006 | IR 05000302-06-003, on April 1, 2006 - June 30, 2006, for Crystal River Unit 3 |
IR 05000302/2005005 | 27 January 2006 | IR 05000302-05-005; on 10/01/2005 - 12/31/2005; Crystal River Unit 3; Event Followup |
IR 05000302/2005004 | 13 October 2005 | IR 05000302-05-004, on 07/01/2005 - 09/30/2005, Crystal River Unit 3; Flood Protection Measures |
ML050530168 | 17 February 2005 | Background Discussion Material for February 24-25, 2005 NRC Meeting Relating to Replacement for BAW-2374, Revision 1, Evaluation of OTSG Thermal Loads During Hot Leg Loca. |
3F0105-02, License Amendment Request 289, Revision 0 Revised Improved Technical Specifications 3.5.2, Emergency Core Cooling Systems - Operating, 3.6.6, Reactor Building Spray & Containment Cooling Systems, 3.7.8, Decay Heat Closed Cycle. | 13 January 2005 | License Amendment Request #289, Revision 0 Revised Improved Technical Specifications 3.5.2, Emergency Core Cooling Systems - Operating, 3.6.6, Reactor Building Spray & Containment Cooling Systems, 3.7.8, Decay Heat Closed Cycle. |
IR 05000302/2004005 | 22 October 2004 | IR 05000302-04-005, on 06/27/2004 - 09/25/2004; Crystal River Unit 3; Equipment Alignment, Fire Protection, Event Followup |
IR 05000302/2004003 | 15 April 2004 | IR 05000302-04-003 on 12/28/03 - 03/27/04, for Crystal River Unit 3, Crystal River, Fl; Event Followup |
IR 05000302/1998007 | 31 August 1998 | Insp Rept 50-302/98-07 on 980621-0801.No Violations Noted. Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support |
IR 05000302/1998004 | 8 June 1998 | Insp Rept 50-302/98-04 on 980322-0509.Violations Noted.Major Areas Inspected:Licensee Operations,Engineering,Maint & Plant Support |
ML20216G809 | 10 April 1998 | Safety Evaluation Accepting Resolution of Crystal River Restart Issues Related to USI A-46 Program |
3F0298-20, Forwards Suppl to Annual 10CFR50.59 Rept That Was Provided in .Attachment a Provides Descriptions of Changes to Facility as Described in FSAR That Were Implemented Between Dec 1996 & Nov 1997.No Tests or Experiments Done | 13 February 1998 | Forwards Suppl to Annual 10CFR50.59 Rept That Was Provided in .Attachment a Provides Descriptions of Changes to Facility as Described in FSAR That Were Implemented Between Dec 1996 & Nov 1997.No Tests or Experiments Done |
ML20198J729 | 10 January 1998 | Overall Restart Readiness |
ML20198H021 | 18 December 1997 | Summarizes 971211-12 Meetings W/Util.Purpose of Meeting to Discuss Status of Actions to Resolve Technical Issues & Progress Toward Readiness for Restart.List of Attendees & Util Handouts Encl |
3F1297-24, Provides Supplemental Info to Support Util Response to NRC Request for Addl Info,Dtd 970128.Clarification to Util RAI Responses,Discussed During NRC Audit USI A-46 & Calculations Encl also.W/10 Oversize Drawings | 16 December 1997 | Provides Supplemental Info to Support Util Response to NRC Request for Addl Info,Dtd 970128.Clarification to Util RAI Responses,Discussed During NRC Audit USI A-46 & Calculations Encl also.W/10 Oversize Drawings |
ML20140F105 | 18 April 1997 | Rev 2 to Crystal River Unit 3 Mgt Corrective Action Plan (Mcap) |
ML20141J691 | 15 November 1996 | Summary of 961113 Meeting W/Crystal River Restart Panel in Atlanta,Ga.Purpose of Meeting to Develop Restart Plan, Develop Restart Task Checklist,Develop Restart Issues Checklist & to Schedule Future Meetings |
ML20134K962 | 31 October 1996 | Mgt Corrective Action Plan Phase II (Mcap II) |
ML20134G210 | 19 August 1996 | Discusses Results of Facility Investigation of 940904-05, make-up Tank Evolutions & Unauthorized Tests Conducted While Being Licensed SRO at Plant.Facility Be Advised That Violations Noted May Change as Result of Further NRC Review |
3F0495-05, Updates NRC Re Related Actions That FPC Performed Since Svc Water Sys Operational Performance Assessment Conducted from 941003-1110.Summary of Major Actions Taken or Planned in Stated Broad Categories Encl | 25 April 1995 | Updates NRC Re Related Actions That FPC Performed Since Svc Water Sys Operational Performance Assessment Conducted from 941003-1110.Summary of Major Actions Taken or Planned in Stated Broad Categories Encl |
ML20079A598 | 21 February 1995 | SWS Operational Performance Insp Self Assessment |
ML20078A397 | 6 December 1994 | Allowable Swhe Tube Blockage Vs Vhs Temp |
3F0792-03, Responds to NRC Re Violations Noted in Insp Rept 50-302/92-11.Corrective Actions:Valve EFV-14 & Associated Motor Operator Replaced W/Different Design.Similar Valves EFV-11,32 & 33 Also Modified | 9 July 1992 | Responds to NRC Re Violations Noted in Insp Rept 50-302/92-11.Corrective Actions:Valve EFV-14 & Associated Motor Operator Replaced W/Different Design.Similar Valves EFV-11,32 & 33 Also Modified |
3F0492-06, Responds to NRC Ltr Re Concerns Noted in MOV Insp Rept 50-302/92-01 on 920106-10.Corrective Actions:Mechanical Engineer Assigned to Support MOV Program.Update for Implementation & Scheduling of MOV Program to Be Submitted | 13 April 1992 | Responds to NRC Ltr Re Concerns Noted in MOV Insp Rept 50-302/92-01 on 920106-10.Corrective Actions:Mechanical Engineer Assigned to Support MOV Program.Update for Implementation & Scheduling of MOV Program to Be Submitted |
ML20245J051 | 14 August 1989 | Forwards Insp Rept 50-302/89-200 on 890424-0505.Results of Insp Indicate That Deficiencies Exist in Areas of Procurement & Dedication of Commercial Grade Items Procured for Used in safety-related Applications |
ML20248J628 | 31 March 1989 | Pipe Rupture Analysis Criteria Outside Reactor Bldg Crystal River Unit 3 |