Issue date | Title | |
---|---|---|
RS-20-139, Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 | 24 November 2020 | Response to Request for Additional Information Regarding License Amendment Requests to Adopt TSTF-505, Revision 2, and 10 CFR 50.69 |
RS-20-069, Additional Information Supporting Request for License Amendment Regarding Automatic Operation of Transformer Load Tap Changer | 29 June 2020 | Additional Information Supporting Request for License Amendment Regarding Automatic Operation of Transformer Load Tap Changer |
ML20134H861 | 30 April 2020 | NRC-2019-000253 - Resp 3 - Interim, Agency Records Subject to the Request Are Enclosed. Part 2 of 2 |
ML19224C086 | 8 August 2019 | NRC-2019-000253 - Resp 1 - Interim, Agency Records Subject to the Request Are Enclosed |
ML19092A159 | 3 April 2019 | Transmittal of Final Clinton Power Station Accident Sequence Precursor Report (Licensee Event Report 461 2017 010) |
IR 05000461/2018092 | 1 April 2019 | EA-18-104 Clinton Power Station - Final Significance Determination of a White Finding with Assessment Follow-Up and Notice of Violation; NRC Inspection Report No. 05000461/2018092 |
ML19050A510 | 21 March 2019 | Final Accident Sequence Precursor Analysis - Clinton Power Station, Division 1 Transformer Failure Leads to Instrument Air Isolation to Containment Requiring a Manual Reactor Scram (LER 461-2017-010) - Precursor |
ML18360A470 | 14 December 2018 | Attachment 2: Response to NRC Questions and Documentation Requests |
ML18311A151 | 6 November 2018 | Errata-Clinton Power Station-NRC Inspection Report 05000461/2018051 and Preliminary White Finding (Public) |
ML18289A556 | 15 October 2018 | NRC Inspection Report 05000461/2018051 and Preliminary White Finding (Public) |
U-604391, Appeal of Final Significance Determination of a White Finding; EA-17-098 | 21 December 2017 | Appeal of Final Significance Determination of a White Finding; EA-17-098 |
IR 05000461/2017010 | 27 November 2017 | Final Significance Determination of a White Finding with Assessment Followup and Notice of Violation; NRC Inspection Report 05000461/2017010 |
IR 05000461/2017009 | 14 August 2017 | NRC Inspection Report 05000461/2017009 and Preliminary White Finding |
RS-17-020, Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies | 2 March 2017 | Response to RAI Concerning License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies |
RS-16-075, Supplemental Information Regarding License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test. | 31 March 2016 | Supplemental Information Regarding License Amendment Request to Revise Technical Specification Section 5.5.13, Primary Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test. |
RS-15-320, Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-049 | 14 December 2015 | Revised Final Integrated Plan Document - Mitigating Strategies NRC Order, EA-12-049 |
RS-15-138, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) | 15 July 2015 | Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049) |
ML13291A029 | 27 August 2013 | 2013 Clinton Power Station Initial License Examination As-Administered Simulator Scenarios |
IR 05000461/2012004 | 5 November 2012 | IR 05000461-12-004; 09/30/2012; Clinton Power Station; Maintenance Effectiveness |
IR 05000461/2011004 | 3 November 2011 | IR 05000461-11-004, on 07/01/11 - 09/30/11, Clinton Power Station, Unit 1, Integrated Inspection Report |
ML112710033 | 28 September 2011 | ROP Tabletop Examples and Results |
ML102380477 | 15 February 2011 | Issuance of Amendment No. 192 Technical Specification Change for the Relocation of Specific Surveillance Frequency Requirements on TSTF-425 |
RS-10-093, Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B | 21 May 2010 | Response to Request for Additional Information Regarding License Amendment Request to Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control - RITSTF Initiative 5B |
RS-09-079, Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature | 15 June 2009 | Request for Amendment to Technical Specifications Section 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation, to Eliminate Requirements for Main Steam Line Isolation on High Turbine Building Temperature |
IR 05000461/2008002 | 13 May 2008 | IR 05000461-08-002; on 01/01/2008 - 03/31/08; Amergen Energy Co., LLC; Clinton Power Station; Fire Protection, Post Maintenance Testing, Refueling Outage, Access to Radiological Areas, and Identification and Resolution of Problems |
RS-07-014, Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance Requirements | 26 January 2007 | Request for Amendment to Technical Specification 3.3.1.1, Reactor Protection System (RPS) Instrumentation Scram Discharge Volume Level Instrumentation Surveillance Requirements |
U-603798, Attachment 3, U-603798, SA-1578, Revision 3, Significance Determination Process (SDP) Evaluation for CPS HPCS RCIC Storage Tank Suction Vortexing | 21 December 2006 | Attachment 3, U-603798, SA-1578, Revision 3, Significance Determination Process (SDP) Evaluation for CPS HPCS RCIC Storage Tank Suction Vortexing |
U-603796, Submittal of Supporting Documentation for December 19, 2006 Regulatory Conference | 12 December 2006 | Submittal of Supporting Documentation for December 19, 2006 Regulatory Conference |
ML041210916 | 22 April 2004 | Technical Evaluation of Extending Division 1 and 2 Inverter Completion Time (CT) |
ML032380047 | 25 August 2003 | Results of the Clinton Power Station Unit 1 SDP Phase 2 Notebook Benchmarking Visit |
U-603132, Provides Responses to Fire Questions Three,Four & Five Re Ipeee.Listed Commitment Contained in Ltr | 28 December 1998 | Provides Responses to Fire Questions Three,Four & Five Re Ipeee.Listed Commitment Contained in Ltr |
U-603077, Forwards Response to 980225 RAI Re CPS IPEEE Submittal in Seismic & Fire Areas.Util Had Committed to Respond to RAI by End of Third Quarter | 29 September 1998 | Forwards Response to 980225 RAI Re CPS IPEEE Submittal in Seismic & Fire Areas.Util Had Committed to Respond to RAI by End of Third Quarter |
ML20203H141 | 25 February 1998 | Forwards Request for Addl Info Re IPEEE Submittal |
U-602605, Provides Addl Info Re 960222 Proposed Amend LS-94-004 to License NPF-62,revising TS 3.3.4.1, EOC Recirculation Pump Trip Instrumentation, in Response to NRC 960424 RAI | 4 July 1996 | Provides Addl Info Re 960222 Proposed Amend LS-94-004 to License NPF-62,revising TS 3.3.4.1, EOC Recirculation Pump Trip Instrumentation, in Response to NRC 960424 RAI |
ML20140B658 | 30 May 1996 | TER on IPE Back End Analysis |
ML20140B642 | 3 May 1996 | TER on IPE Front End Analysis |
U-602519, Forwards Response to NRC 950721 RAI Re IPE Submittal for Facility, | 22 November 1995 | Forwards Response to NRC 950721 RAI Re IPE Submittal for Facility, |