Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23173A057 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted |
ML23173A038 | 10 April 2023 | 9 to Updated Final Safety Analysis Report, Appendix M Containment Report - Redacted |
ML23062A419 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria. (Redacted) |
ML23062A428 | 3 March 2023 | 8 to Updated Final Safety Analysis Report, Appendix M, Containment Report (Redacted) |
ML19114A209 | 8 April 2019 | Revision 27 to Updated Final Safety Analysis Report, Appendix M - Containment Report |
ML19114A172 | 8 April 2019 | Revision 27 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria |
ML19015A422 | 11 March 2019 | Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 |
RS-18-113, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident... | 28 September 2018 | Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident... |
ML17130A319 | 6 April 2017 | Revision 26 to Updated Final Safety Analysis Report, Appendix M, Containment Report |
ML17130A279 | 6 April 2017 | Revision 26 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria |
RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure | 26 May 2016 | Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure |
RS-15-303, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. | 15 December 2015 | Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions.. |
ML15069A112 | 17 April 2015 | G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design |
ML12215A314 | 17 April 2015 | Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
ML12215A283 | 17 April 2015 | G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs |
RS-15-032, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 27 February 2015 | Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
ML15026A469 | 12 February 2015 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to EA-13-109 (Severe Accident Capable Hardened Vents) |
RS-14-250, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident | 31 October 2014 | Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident |
RS-14-202, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) | 28 August 2014 | Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051) |
RS-14-062, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) | 30 June 2014 | Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109) |
NRC-2014-0037, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 | 4 March 2014 | FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 |
ML14051A671 | 4 March 2014 | FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014 |
RA-13-109, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns | 27 November 2013 | Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns |
ML13031A500 | 31 January 2013 | NUREG/CR-7154 Vol 1 Risk Informing Emergency Preparedness Oversight: Evaluation of Emergency Action Levels - a Pilot Study of Peach Bottom, Surry and Sequoyah (Main Report, Appendices a and B) |
ML13003A025 | 16 November 2012 | Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104 |
ML13003A033 | 16 November 2012 | Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104 |
ML12293A451 | 22 October 2012 | ACRS Assessment of the Quality of Selected NRC Research Projects- Fy 2012 |
ML12122A071 | 14 May 2012 | Enclosure 1: April 2012 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 |
ML11192A300 | 28 October 2010 | Preliminary Draft NUREG-1935, Rev. 3, State-of-the-Art Reactor Consequence Analyses (Soarca) Project. Appendix a (Draft), Peach Bottom Integrated Analysis. Part 1 of 3 |
ML12124A076 | 17 December 2009 | Draft NUREG State-Of-The-Art Reactor Consequence Analyses (Soarca) Project Appendix a Peach Bottom Integrated Analysis, W/Handwritten Notes |
ML080670041 | 28 February 2008 | Response to Request for Additional Information Concerning License Amendment - Application of Alternative Source Team |
ML033560302 | 9 December 2003 | Exelon/Amergen 180-Day Response to NRC Generic Letter 2003-01, Control Room Habitability. |
ML022590498 | 30 September 2002 | SER Chapter 2, 2 Structures |
ML20129A403 | 3 September 1996 | Submits Repair Package for Core Spray Piping to Expedite Review Schedule of Repair Package If It Becomes Necessary to Install Repair |
ML20117E635 | 31 May 1996 | Seismic Evaluation Rept for Pbaps |
ML20149L244 | 29 January 1996 | Safety Evaluation Accepting Insp & Evaluation Methodology for Operation of Unit 3 Core Shroud for Duration of Current Operating Cycle,Performed in Response to GL 94-03 |
ML20096D689 | 10 January 1996 | Submits Info Re Alternative Repair Plan in Accordance W/ 10CFR50.55a(a)(3) |
ML20092K987 | 13 June 1995 | Rev 3 to Shroud Stabilizer Hardware |
ML20073J717 | 24 September 1994 | Rev 1 to Design Spec 25A5579, Shroud Stabilizer Hardware |
ML20073J741 | 24 September 1994 | Rev 0 to Stress Rept 25A5607, Shroud Stabilizers |
ML20073F544 | 12 September 1994 | Shroud Stabilizer Hardware Legend or Description of Groups |
ML20073F554 | 12 September 1994 | Shroud Stabilizers Legend or Description of Groups |
ML19325C406 | 6 October 1989 | LER 89-003-00:on 890808,subsequent Sys Walkdown & Analysis Revealed That as-found Configuration Would Result in Piping Stresses Adjacent to Valves Exceeding Code Limits.Caused by Design & Installation error.W/891006 Ltr |
ML20247D346 | 31 December 1988 | 1988 Annual 10CFR50.59 Rept |
ML20196K031 | 31 December 1987 | 1987 Annual Plant Mod Rept,Per 10CFR50.59 |
ML20091J905 | 31 March 1984 | Safety Review of Peach Bottom Unit 3 at Core Flow Conditions Above Rated Flow Throughout Cycle 6 |
ML20010A185 | 3 August 1981 | Application for Amend of Licenses DPR-44 & DPR-56 to Revise Tech Specs Re Method of Verifying drywell-suppression Chamber Vacuum Breaker Closure,Operability of Radiation Monitors & Listing of safety-related Shock Suppressors |
ML20003H291 | 24 April 1981 | Forwards LER 81-025/01T-0.Detailed Event Analysis Submitted |
ML20003H295 | 24 April 1981 | LER 81-025/01T-0:on 810413,seismic Analysis of Torus to Reactor Bldg Vacuum Breaker Valves Revealed That Valve Operator Mounting Brackets Did Not Meet Seismic Requirement. Valve AO-2502B Upgraded by Addition of Snubber |
ML20003F423 | 15 April 1981 | Application to Amend License DPR-44.Amend Requests short- Term Relief from Operability Requirements of Tech Spec 3.7.A.3.b Re Two Valves,Pending Completion of Mods to Valves |