Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23173A05710 April 20239 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria - Redacted
ML23173A03810 April 20239 to Updated Final Safety Analysis Report, Appendix M Containment Report - Redacted
ML23062A4193 March 20238 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria. (Redacted)
ML23062A4283 March 20238 to Updated Final Safety Analysis Report, Appendix M, Containment Report (Redacted)
ML19114A2098 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix M - Containment Report
ML19114A1728 April 2019Revision 27 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria
ML19015A42211 March 2019Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109
RS-18-113, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident...28 September 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident...
ML17130A3196 April 2017Revision 26 to Updated Final Safety Analysis Report, Appendix M, Containment Report
ML17130A2796 April 2017Revision 26 to Updated Final Safety Analysis Report, Appendix C, Structural Design Criteria
RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure26 May 2016Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure
RS-15-303, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..15 December 2015Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions..
ML15069A11217 April 2015G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design
ML12215A31417 April 2015Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML12215A28317 April 2015G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
RS-15-032, Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)27 February 2015Fourth Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
ML15026A46912 February 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to EA-13-109 (Severe Accident Capable Hardened Vents)
RS-14-250, Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident31 October 2014Supplemental Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding the Seismic Aspects of Recommendation 2.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident
RS-14-202, Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)28 August 2014Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Reliable Spent Fuel Pool Instrumentation (Order Number EA-12-051)
RS-14-062, Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)30 June 2014Phase 1 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions (Order Number EA-13-109)
NRC-2014-0037, FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 20144 March 2014FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014
ML14051A6714 March 2014FRN: Applications and Amendments to Facility Operating Licenses and Combined Licenses Involving No Significant Hazards Considerations: Publication Date: March 4, 2014
RA-13-109, Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns27 November 2013Response to Request for Additional Information Associated with Near-Term Task Force Recommendation 2.3, Seismic Walkdowns
ML13031A50031 January 2013NUREG/CR-7154 Vol 1 Risk Informing Emergency Preparedness Oversight: Evaluation of Emergency Action Levels - a Pilot Study of Peach Bottom, Surry and Sequoyah (Main Report, Appendices a and B)
ML13003A02516 November 2012Report No. MPR-3815, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104
ML13003A03316 November 2012Report No. MPR-3812, Rev. 3, Seismic Walkdown Report in Response to the 50.54(f) Information Request Regarding Fukushima Near-Term Task Force Recommendation 2.3: Seismic, Cover Through Page B-104
ML12293A45122 October 2012ACRS Assessment of the Quality of Selected NRC Research Projects- Fy 2012
ML12122A07114 May 2012Enclosure 1: April 2012 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206
ML11192A30028 October 2010Preliminary Draft NUREG-1935, Rev. 3, State-of-the-Art Reactor Consequence Analyses (Soarca) Project. Appendix a (Draft), Peach Bottom Integrated Analysis. Part 1 of 3
ML12124A07617 December 2009Draft NUREG State-Of-The-Art Reactor Consequence Analyses (Soarca) Project Appendix a Peach Bottom Integrated Analysis, W/Handwritten Notes
ML08067004128 February 2008Response to Request for Additional Information Concerning License Amendment - Application of Alternative Source Team
ML0335603029 December 2003Exelon/Amergen 180-Day Response to NRC Generic Letter 2003-01, Control Room Habitability.
ML02259049830 September 2002SER Chapter 2, 2 Structures
ML20129A4033 September 1996Submits Repair Package for Core Spray Piping to Expedite Review Schedule of Repair Package If It Becomes Necessary to Install Repair
ML20117E63531 May 1996Seismic Evaluation Rept for Pbaps
ML20149L24429 January 1996Safety Evaluation Accepting Insp & Evaluation Methodology for Operation of Unit 3 Core Shroud for Duration of Current Operating Cycle,Performed in Response to GL 94-03
ML20096D68910 January 1996Submits Info Re Alternative Repair Plan in Accordance W/ 10CFR50.55a(a)(3)
ML20092K98713 June 1995Rev 3 to Shroud Stabilizer Hardware
ML20073J71724 September 1994Rev 1 to Design Spec 25A5579, Shroud Stabilizer Hardware
ML20073J74124 September 1994Rev 0 to Stress Rept 25A5607, Shroud Stabilizers
ML20073F54412 September 1994Shroud Stabilizer Hardware Legend or Description of Groups
ML20073F55412 September 1994Shroud Stabilizers Legend or Description of Groups
ML19325C4066 October 1989LER 89-003-00:on 890808,subsequent Sys Walkdown & Analysis Revealed That as-found Configuration Would Result in Piping Stresses Adjacent to Valves Exceeding Code Limits.Caused by Design & Installation error.W/891006 Ltr
ML20247D34631 December 19881988 Annual 10CFR50.59 Rept
ML20196K03131 December 19871987 Annual Plant Mod Rept,Per 10CFR50.59
ML20091J90531 March 1984Safety Review of Peach Bottom Unit 3 at Core Flow Conditions Above Rated Flow Throughout Cycle 6
ML20010A1853 August 1981Application for Amend of Licenses DPR-44 & DPR-56 to Revise Tech Specs Re Method of Verifying drywell-suppression Chamber Vacuum Breaker Closure,Operability of Radiation Monitors & Listing of safety-related Shock Suppressors
ML20003H29124 April 1981Forwards LER 81-025/01T-0.Detailed Event Analysis Submitted
ML20003H29524 April 1981LER 81-025/01T-0:on 810413,seismic Analysis of Torus to Reactor Bldg Vacuum Breaker Valves Revealed That Valve Operator Mounting Brackets Did Not Meet Seismic Requirement. Valve AO-2502B Upgraded by Addition of Snubber
ML20003F42315 April 1981Application to Amend License DPR-44.Amend Requests short- Term Relief from Operability Requirements of Tech Spec 3.7.A.3.b Re Two Valves,Pending Completion of Mods to Valves