Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23353A15731 October 2023UFSAR Revision 28 (Redacted Version)
ML22292A0845 October 20225 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System
ML22292A1135 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML22292A0835 October 20225 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.1 Through 3.5
ML22292A0785 October 20225 to Updated Final Safety Analysis Report, Chapter 6, Appendices 6A Through 6C
ML22292A0755 October 20225 to Updated Final Safety Analysis Report, Chapter 9, Sections 9.4 Thru 9.5
ML22292A0725 October 20225 to Updated Final Safety Analysis Report, Chapter 3, Sections 3.9A Thru 3.11
ML22292A0705 October 20225 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of the Plant
ML18255A12111 October 2018Safety Evaluation Regarding Implementation of Hardened Containment Vents Capable of Operation Under Severe Accident Conditions Related to Order EA-13-109 (CAC No. MF4482; EPID L-2014-JLD-0043)
NMP1L3229, Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ...20 August 2018Report of Full Compliance with Phase 1 and Phase 2 of June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe ...
ML16188A2711 July 2016Final Integrated Plan Document- Mitigating Strategies NRC Order EA-12-049
RA-16-049, Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure26 May 2016Response to Request for Additional Information Regarding Requests to Withhold Emergency Preparedness Documents from Public Disclosure
RS-15-302, Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..15 December 2015Phase 1 (Updated) and Phase 2 Overall Integrated Plan in Response to June 6, 2013 Commission Order Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident..
RS-15-117, Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)8 June 2015Report of Full Compliance with March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049)
ML12215A31417 April 2015Proposed Director'S Decision - 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML12215A28317 April 2015G20110563 - LTR to Lochbaum -- Draft Director'S Decision Re 2.206 Petition Re Boiling Water Reactors with Mark I and Mark II Containment Designs
ML15069A11217 April 2015G20110563 - Licensee Letter Regarding Draft Director'S Decision to Licensee'S with Mark I and II Containment Design
ML15069A67126 March 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Phase 1 of Order EA-13-109 (Severe Accident Capable Hardened Vents)
ML15028A14911 February 2015Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-13-109, Severe Accident Capable Hardened Vents
ML14184B34027 June 2014Overall Integrated Plan Per Order EA-13-109 Modifying Licenses with Regard to Reliable Hardened Containment Vents Capable of Operation Under Severe Accident Conditions
ML14099A19631 March 2014Constellation Energy Nuclear Group, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response to NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task.
ML14071A58412 March 2014EA-13-109 NMP2 Integrated Plan Rev. D3
ML13225A58419 December 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)
ML13338A66311 December 2013Mega-Tech Services, LLC, Technical Evaluation Report Regarding the Overall Integrated Plan for Nine Mile Point, Unit 1, TAC No.: MF1129
ML13154A3995 June 2013Request for Additional Information - Nine Mile Point Nuclear Station Units 1 and 2 Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation (Order EA-12-051)
ML13073A1558 March 2013Supplement to Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation
ML13074A0568 March 2013Supplement to Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events
ML13066A16928 February 2013Units I and 2, Overall Integrated Plan for Reliable Hardened Vents
ML13066A17228 February 2013R. E. Ginna, Overall Integrated Plan for Reliable Spent Fuel Pool Instrumentation
ML13066A17128 February 2013R.E. Gina, Overall Integrated Plan for Mitigation Strategies for Beyond-Design-Basis External Events
ML11049058510 March 2011License Amendment, Issuance of Amendment Regarding Changes to Remove LCO 3/4.6.4, Snubbers, and Add LCO 3.0.8 on the Inoberability of Snubbers Using Consolidated Line Item Improvement Process
ML07158031431 May 2007License Amendment Request Pursuant to 10 CFR 50.90: Application of Alternative Source Term
ML07011023114 December 2006License Amendment, Application of Alternative Source Term
ML06285036610 October 2006Part 21 Notification - BWR Core Shroud Tie Rod Upper Support Cracking
ML06129031031 May 2006NUREG-1437, Supp 24, Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Nine Mile Point Nuclear Station, Units 1 & 2 Final Report
ML03307027223 October 200310CFR50.59 Evaluation Summary Report for 2003
ML00376265120 October 2000Volumes 26 & 27, Appendixes 6A & 9B of Nine Mile Point Unit 2 Updated Safety Analysis Report
ML20207D31428 May 1999Ack Receipt of 981203,990325 & 0415 Ltrs,Which Presented Several Concerns & Comments Re Operation of Nmp,Plant,Unit 1 During Last Operating Cycle
ML17059C55031 January 1999Rev 0 to MPR-1966(NP), NMP Unit 1 Core Shroud Vertical Weld Repair Design Rept.
ML20217B2668 September 1997Responds to Which Provided Views & Comments on Core Shroud Cracking Problem at NMP1 W/Regards to NRC GL 94-03, Intergranular Stress Corrosion Cracking of Core Shrouds in Bwrs,
ML17059B12229 April 1996Nonproprietary Core Shroud Repair 270 Degree Tie Rod Assembly Assessment.
ML18040A23723 January 1995Forwards Final Version of Proprietary GE-NE-B13-01739-04, NMP Unit 1 Shroud Repair Hardware Stress Analysis & GE-NE-B13-01739-05,rev 1, ...Safety Evaluation GE Core Shroud... in Response to GL 94-03.Repts Withheld
ML18038A4426 February 1989Special Rept:On 881227,inoperability of Seismic Monitoring Instrumentation Occurred.Instrument Struck by Personnel Installing Insulation on Pipe or Performing Sys Walkdowns. Problem Rept Written on 890112 for Indications on Plates
ML18038A09913 December 1985Sqrt Audit Rept for Nine Mile Point Nuclear Station,Unit 2.
ML18037A1107 January 1985Forwards Evaluation on Vertical Floor Flexibility,Closing Out SER Open Item 27
ML18037A38114 June 1982Forwards Response to 820422 Request for Addl Info Re Util Response to IE Bulletin 80-11, Masonry Wall Design.
ML18037A17512 June 1979Responds to IE Bulletin 79-07.Forwards Addl Info on Reanalysis of Seven safety-related Piping Sys.Teledyne Engineering Svcs Rept, Verification & Qualification of Tmrpipe Computer Program & Printouts Encl