ML23062A63529 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 15, Accident Analysis
ML23067A12129 December 2022Site Addendum, Chapter 2, Site Characteristics
ML23062A64229 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML21193A19722 June 2021Revision OL-25 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML21193A20222 June 2021Revision OL-25 to Final Safety Analysis Report, Chapter 15, Accident Analysis
ML21194A30222 June 2021Site Addendum, Chapter 2, Site Characteristics
ML20209A09113 November 2019Site Analysis, Chapter 2.0, Site Characteristics
ML20209A01713 November 2019Rev. OL-24 to Final Safety Analysis Report, Chapter 15, Accident Analysis
ML20209A01513 November 2019Rev. OL-24 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML19024A47123 January 2019Attachment 1 - NRC Audit Questions and Responses
ML17200D11322 August 2017NRC Response to Request for Extension of Seismic Probabilistic Risk Assessment Submittal
ML17061A2045 April 2017Final Safety Analysis Report, Revision OL-22, Chapter 9
ML17060A5695 April 2017Final Safety Analysis Report, Revision OL-22, Chapter 2, Site Characteristics
ML17065A0908 March 2017Final Safety Analysis Report, Revision OL-22, Chapter 15, Accident Analysis
ULNRC-06310, Final Notification of Full Compliance with March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis (Order No. EA-12-049)6 July 2016Final Notification of Full Compliance with March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis (Order No. EA-12-049)
IR 05000483/201500830 October 2015IR 05000483/2015008 and 07201045/2015001; Callaway Plant; Independent Spent Fuel Storage Installation (ISFSI)
ML14112A38019 March 2014Draft Environmental Impact Statement for Callaway Plant License Renewal Public Meeting - Afternoon Session
ML13224A19519 December 2013Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies)
ML13338A6449 December 2013Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Callaway Plant, Unit 1, (TAC No. MF00772)
ML13063A45822 February 2013Transmittal of Callaway Plant NRC FLEX Submittal for February 2013
ML12122A07114 May 2012Enclosure 1: April 2012 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206
NRC-2010-0131, Brief of Nuclear Energy Institute as Amicus Curiae in Opposition to the Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions2 May 2011Brief of Nuclear Energy Institute as Amicus Curiae in Opposition to the Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions
IR 05000483/20080085 December 2008IR 05000483-08-008; July 28 Through August 22, 2008; Callaway Plant: Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Basis Inspection
ML0821808515 August 2008IR 05000483-08-003, on 3/25 - 6/24/08, Callaway Plant, Operability Evaluations, Postmaintenance Testing, Surveillance Testing, and Identification and Resolution of Problems
ML0822601964 August 2008G20080546/LTR-08-0436/EDATS: SECY-2008-0470 - Memo. Kay Drey Questions About Radioactive Waste Generated at the Callaway
ML20006C23613 June 1989Annual Exercise,891011.
ML20151Y8144 February 1986Part 21 Rept Re Colt-Pielstick Engine Tripping Out on High Speed When Started for Test Purposes at Seabrook.Caused by Source of Air Pressure Staying On.Engines Will Be Modified to Positively Vent Air from Rack Boost Cylinder