Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23062A635 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML23067A121 | 29 December 2022 | Site Addendum, Chapter 2, Site Characteristics |
ML23062A642 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML21193A197 | 22 June 2021 | Revision OL-25 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML21193A202 | 22 June 2021 | Revision OL-25 to Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML21194A302 | 22 June 2021 | Site Addendum, Chapter 2, Site Characteristics |
ML20209A091 | 13 November 2019 | Site Analysis, Chapter 2.0, Site Characteristics |
ML20209A017 | 13 November 2019 | Rev. OL-24 to Final Safety Analysis Report, Chapter 15, Accident Analysis |
ML20209A015 | 13 November 2019 | Rev. OL-24 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML19024A471 | 23 January 2019 | Attachment 1 - NRC Audit Questions and Responses |
ML17200D113 | 22 August 2017 | NRC Response to Request for Extension of Seismic Probabilistic Risk Assessment Submittal |
ML17061A204 | 5 April 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 9 |
ML17060A569 | 5 April 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 2, Site Characteristics |
ML17065A090 | 8 March 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 15, Accident Analysis |
ULNRC-06310, Final Notification of Full Compliance with March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis (Order No. EA-12-049) | 6 July 2016 | Final Notification of Full Compliance with March 12, 2012 Commission Order Modifying License with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis (Order No. EA-12-049) |
IR 05000483/2015008 | 30 October 2015 | IR 05000483/2015008 and 07201045/2015001; Callaway Plant; Independent Spent Fuel Storage Installation (ISFSI) |
ML14112A380 | 19 March 2014 | Draft Environmental Impact Statement for Callaway Plant License Renewal Public Meeting - Afternoon Session |
ML13224A195 | 19 December 2013 | Interim Staff Evaluation Relating to Overall Integrated Plan in Response to Order EA-12-049 (Mitigation Strategies) |
ML13338A644 | 9 December 2013 | Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Callaway Plant, Unit 1, (TAC No. MF00772) |
ML13063A458 | 22 February 2013 | Transmittal of Callaway Plant NRC FLEX Submittal for February 2013 |
ML12122A071 | 14 May 2012 | Enclosure 1: April 2012 Report on the Status of Public Petitions Under Title 10 of the Code of Federal Regulations, Section 2.206 |
NRC-2010-0131, Brief of Nuclear Energy Institute as Amicus Curiae in Opposition to the Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions | 2 May 2011 | Brief of Nuclear Energy Institute as Amicus Curiae in Opposition to the Emergency Petition to Suspend All Pending Reactor Licensing Decisions and Related Rulemaking Decisions |
IR 05000483/2008008 | 5 December 2008 | IR 05000483-08-008; July 28 Through August 22, 2008; Callaway Plant: Baseline Inspection, NRC Inspection Procedure 71111.21, Component Design Basis Inspection |
ML082180851 | 5 August 2008 | IR 05000483-08-003, on 3/25 - 6/24/08, Callaway Plant, Operability Evaluations, Postmaintenance Testing, Surveillance Testing, and Identification and Resolution of Problems |
ML082260196 | 4 August 2008 | G20080546/LTR-08-0436/EDATS: SECY-2008-0470 - Memo. Kay Drey Questions About Radioactive Waste Generated at the Callaway |
ML20006C236 | 13 June 1989 | Annual Exercise,891011. |
ML20151Y814 | 4 February 1986 | Part 21 Rept Re Colt-Pielstick Engine Tripping Out on High Speed When Started for Test Purposes at Seabrook.Caused by Source of Air Pressure Staying On.Engines Will Be Modified to Positively Vent Air from Rack Boost Cylinder |