Semantic search

Jump to navigation Jump to search
 Issue dateTitle
IR 05000269/202300525 August 2023Updated Inspection Plan for Oconee Nuclear Station Units 1, 2 and 3 (Report 05000269/2023005, 05000270/2023005, and 05000287/2023005)
ML23061A1773 March 2023Notification of Oconee Nuclear Station Comprehensive Engineering Team Inspection - NRC Inspection Report 05000269/2023011, 05000270/2023011 and 05000287/2023011
IR 05000269/20220061 March 2023Annual Assessment Letter for Oconee Nuclear Nuclear Station, Units 1, 2 and 3 (NRC Inspection Report 05000269/2022006, 05000270/2022006, and 05000287/2022006)
IR 05000269/202200526 August 2022Updated Inspection Plan for Oconee Nuclear Station, Units 1, 2 and 3 - NRC Inspection Report 05000269/2022005, 05000270/2022005, and 05000287/2022005
RA-19-0115, Transmittal of the Duke Energy Corporation Topic Report (Duke QAPD-001-A), Amendment 4418 February 2019Transmittal of the Duke Energy Corporation Topic Report (Duke QAPD-001-A), Amendment 44
IR 05000269/20180032 November 2018Nuclear Regulatory Commission Integrated Inspection Report 05000269/2018003, 05000270/2018003, and 05000287/2018003
RA-18-0004, Duke Energy Transmittal of Topical Report DUKE-QAPD-001-A, Amendment 4313 August 2018Duke Energy Transmittal of Topical Report DUKE-QAPD-001-A, Amendment 43
IR 05000269/201700224 July 2017NRC Integrated Inspection Report 05000269/2017002, 05000270/2017002 and 05000287/2017002, April 01, 2017 Through June 30, 2017
RA-17-0025, Transmittal of the Duke Energy Corporation Topical Report (Duke-QAPD-001-A), Amendment 4222 May 2017Transmittal of the Duke Energy Corporation Topical Report (Duke-QAPD-001-A), Amendment 42
IR 05000269/20160039 November 2016NRC Integrated Inspection Report 05000269/2016003; 05000270/2016003, 05000287/2016003
ONS-2016-017, Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2)15 February 2016Request for Alternative to Codes and Standards Requirements Pursuant to 10 CFR 50.55a(z) to Satisfy 10 CFR 50.55a(h)(2)
ML15103A2446 April 2015Part 21 Report - Deviation of Hk Circuit Breaker Close Latch Spring
IR 05000269/201400212 May 2014IR 05000269-14-002, 05000270-14-002, 05000287-14-002; 01/01/2014 03/31/2014; Oconee Nuclear Station Units 1, 2 and 3, Integrated Inspection
ML14034A18923 January 2014Part 21 - Loose Battery Vent Assemblies
ML13246A1493 September 2013Mid Cycle Assessment Letter
ML11341A08211 January 2012Correction Ltr. for Amendments No. 373, 375, and 374 Regarding Authorizing a Change to the Updated Final Safety Analysis Report (UFSAR) Allowing the Use of Fiber Reinforced Polymer on Masonry Brick Walls for the Mitigation
ML11336A3691 December 2011Notification of Potential Part 21 Interim Report on Thermostatic Valve Failure on Palo Verde EDG
ML11164A25727 June 2011License Amendments, Authorizing Change to the UFSAR Allowing Use of Fiber Reinforced Polymer on Masonry Brick Walls for the Mitigation of Differential Pressure Created by High Winds-TAC ME1710-ME171
ML10183001124 June 2010Response to Request for Additional Information on Tornado Mitigation License Amendment Request
ML10131042525 May 2010Request for Additional Information Regarding Licensee Amendment Request for Upgrading Licensing Basis for Tornado Mitigation
ML09187122329 June 2009License Amendment Request No. 2009-05, License Amendment Request to Incorporate Use of Fiber-Reinforced Polymer System to Strengthen Existing Auxiliary Building Masonry Brick Walls for Tornado Loadings
ML0915904946 May 2009Duke Energy Slides from Public Meeting with Duke Energy to Discuss a Proposed License Amendment for the Use of a Fiber-Reinforced Plymer (FRP) System
ML08267106619 September 2008Notification of Potential Part 21 on Siemens Model 353 Process Controller Transformer Failure
ML08072043326 March 2008Correction Pages for Correction to Amendment Nos. 360, 362, and 361 for Oconee Nuclear Station, Units 1, 2, and 3
ML08032006521 February 2008Issuance of Amendments Regarding Use of Fiber-Reinforced Polymer (FRP)
ML08024025315 January 20081/15/08 E-mail on Digital Rps/Bsps
ML0606600109 March 2006Forthcoming Meeting with Duke Energy Corporation to Discuss Planned License Amendment Request for Use of Fiber Reinforced Polymer
ML04167047715 June 2004Notification of Oconee Nuclear Station - Safety System Design and Performance Capability Inspection - NRC Inspection Report
IR 05000269/20030032 September 2003IR 05000269-03-003, IR 05000270-03-003, & IR 05000287-03-003, on 04/06/2003 - 06/28/2003; Duke Energy Corporation; Oconee; Maintenance Effectiveness, Personnel Performance During Non-Routine Plant Evolutions and Other Activities
ML03210078028 July 2003IR 05000269-03-003, IR 05000270-03-003, IR 05000287-03-003, on 04/06 - 06/28/2003, Duke Energy Corp; Oconee Nuclear Station; Maintenance Effectiveness, Personnel Performance During Non-routine Plant Evolutions, and Other Activities
Information Notice 1989-45, Metalclad, Low-Voltage Power Circuit Breakers Refurbished with Substandard Parts8 May 1989Metalclad, Low-Voltage Power Circuit Breakers Refurbished with Substandard Parts