Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
AECM-83-0146, Forwards Response to Five of Six Items Contained in Re Util Work Addressing Containment Issues.Evaluation of Condensation Oscillation Loads Produced by Discharges from RHR HX Relief Valve Will Be Completed by Late Apr | 23 March 1983 | Dale L MISSISSIPPI POWER & LIGHT CO. | Forwards Response to Five of Six Items Contained in Re Util Work Addressing Containment Issues.Evaluation of Condensation Oscillation Loads Produced by Discharges from RHR HX Relief Valve Will Be Completed by Late Apr | Other |
ML20137Q230 | 31 July 1983 | GENERAL ELECTRIC CO. Srivastava H Hwang H Atwell J | Containment Issue Isolation Transient | Other |
ML20097F052 | 31 March 1984 | BECHTEL GROUP INC. Ashley G Leong T | Approach to Chugging,Assessment of RHR Steam Discharge Condensation Oscillation in Mark III Containments | Other |
AECM-84-0443, Forwards Approach to Chugging,Assessment of RHR Steam Discharge Condensation Oscillation in Mark III Containments, Per 830323 Commitment.Ae Evaluation Will Be Completed by mid-Dec 1984 | 7 September 1984 | Dale L MISSISSIPPI POWER & LIGHT CO. | Forwards Approach to Chugging,Assessment of RHR Steam Discharge Condensation Oscillation in Mark III Containments, Per 830323 Commitment.Ae Evaluation Will Be Completed by mid-Dec 1984 | Other |
AECM-85-0018, Forwards Evaluation of RHR Relief Valve Condensation Oscillation Loads on Structures & Piping.Info Demonstrates That All Loads Which Could Be Produced by Actuation of RHR HX Relief Valves Acceptable | 24 January 1985 | Dale L MISSISSIPPI POWER & LIGHT CO. | Forwards Evaluation of RHR Relief Valve Condensation Oscillation Loads on Structures & Piping.Info Demonstrates That All Loads Which Could Be Produced by Actuation of RHR HX Relief Valves Acceptable | Other |
AECM-85-0046, Provides Basis That Weir Wall Overflow Following Postulated Inadvertent Upper Containment Pool Dump Does Not Involve Significant Safety Problem.Evaluation Plans & Justification Provided | 25 February 1985 | Dale L MISSISSIPPI POWER & LIGHT CO. | Provides Basis That Weir Wall Overflow Following Postulated Inadvertent Upper Containment Pool Dump Does Not Involve Significant Safety Problem.Evaluation Plans & Justification Provided | Other |
ML20126J267 | 11 June 1985 | Adensam E Office of Nuclear Reactor Regulation | Forwards Request for Addl Info Re Steam Condensing Mode of RHR Sys.Info Requested by 850715 | RAI |
AECM-85-0287, Responds to NRC 850611 Request for Addl Info Re Steam Condensing Mode.Listed Methods for Predicting Chugging Will Be Evaluated.Evaluation Scheduled for Completion by 851220 | 13 September 1985 | Dale L MISSISSIPPI POWER & LIGHT CO. | Responds to NRC 850611 Request for Addl Info Re Steam Condensing Mode.Listed Methods for Predicting Chugging Will Be Evaluated.Evaluation Scheduled for Completion by 851220 | Request |
AECM-85-0233, Forwards Weir Wall Overflow Probability Analysis. Because of Very Low Probability of Occurrence & Leak of Safety Significance for Worst Case Postulated Overflow (Ref AECM-85/0046),corrective Actions Not Warranted | 4 October 1985 | Dale L MISSISSIPPI POWER & LIGHT CO. | Forwards Weir Wall Overflow Probability Analysis. Because of Very Low Probability of Occurrence & Leak of Safety Significance for Worst Case Postulated Overflow (Ref AECM-85/0046),corrective Actions Not Warranted | Other |
AECM-85-0376, Submits Info Re Wier Wall Overflow,Per 851021 Request.Topics Addressed Include Overflow Effect Upon Uninsulated Drywell Piping & Evaluation of Recirculation Piping Relative to Predicted Water Level.Ge Rept Re Containment Issue Encl | 27 November 1985 | Dale L MISSISSIPPI POWER & LIGHT CO. | Submits Info Re Wier Wall Overflow,Per 851021 Request.Topics Addressed Include Overflow Effect Upon Uninsulated Drywell Piping & Evaluation of Recirculation Piping Relative to Predicted Water Level.Ge Rept Re Containment Issue Encl | Other |
AECM-86-0012, Discusses Status of Util Activities in Response to NRC 850611 Request for Addl Info Re Review of Possible Condensation Oscillation Loads from Chugging. Dedicated Lines from RHR HX Noncondensible Vents Preferred Resolution | 28 January 1986 | Dale L MISSISSIPPI POWER & LIGHT CO. | Discusses Status of Util Activities in Response to NRC 850611 Request for Addl Info Re Review of Possible Condensation Oscillation Loads from Chugging. Dedicated Lines from RHR HX Noncondensible Vents Preferred Resolution | Request |
AECM-86-0143, Clarifies Planned Resolution of Possible Loads from Chugging Caused by Steam & Gas Venting Into Suppression Pool Through RHR Relief Valve Discharge Line.Rhr HX Vent Line Header Will Have Dedicated Discharge Line to Pool | 16 May 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Clarifies Planned Resolution of Possible Loads from Chugging Caused by Steam & Gas Venting Into Suppression Pool Through RHR Relief Valve Discharge Line.Rhr HX Vent Line Header Will Have Dedicated Discharge Line to Pool | Other |
AECM-86-0175, Corrected Response to 860326 Request for Addl Info Re Listed Humphrey Concerns,Including Addl Submerged Structure Loads & Containment Open Area,Correcting Omission of Page 2 from Attachment 3 | 14 August 1986 | Kingsley O MISSISSIPPI POWER & LIGHT CO. | Corrected Response to 860326 Request for Addl Info Re Listed Humphrey Concerns,Including Addl Submerged Structure Loads & Containment Open Area,Correcting Omission of Page 2 from Attachment 3 | Request |
ML20204J145 | 23 March 1987 | Office of Nuclear Reactor Regulation | SER Supporting Licensee Responses to Humphrey Concerns on Safety of Mark III Containment Design | Other |
ML20204J116 | 23 March 1987 | Office of Nuclear Reactor Regulation Kintner L | Forwards SER Re Licensee Responses to Humphrey Concerns on Mark III Containment Design.Humphrey Concerns Satisfactorily Resolved.Licensee Will Continue to Prohibit Use of RHR Steam Condensing Mode Until Design Mods Implemented | Approval |