Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
ML20069H913 | 17 September 1982 | FirstEnergy | Proposed Change to Tech Spec Table 4.3-11,extending Steam Line Pressure - Low Switch Surveillance Period by 96-h,until Midnight 820916 | Request |
ML20069H910 | 17 September 1982 | FirstEnergy Peters R | Application for Emergency Change to Tech Spec Table 4.3-11, Extending Steam Line Pressure - Low Switch Surveillance Period by 96-h,until Midnight 820916.Safety Evaluation Encl | Request |
05000346/LER-1982-044, Forwards LER 82-044/03L-0 | 30 September 1982 | FirstEnergy Murray T | Forwards LER 82-044/03L-0 | Other |
ML20063N676 | 30 September 1982 | FirstEnergy | Proposed Revision to Tech Spec Table 4.3-11 Re Steam & Feedwater Rupture Control Sys Instrumentation Surveillance Requirements.Safety Evaluation Encl | Other |
ML20063N673 | 30 September 1982 | FirstEnergy Crouse R | Application to Amend License NPF-3,revising Tech Spec Table 4.3-11 Re Steam & Feedwater Rupture Control Sys Instrumentation Surveillance Requirements | Request |
ML20063N671 | 30 September 1982 | FirstEnergy Crouse R | Forwards Application to Amend License NPF-3,revising Tech Spec Table 4.3-11 Re Steam & Feedwater Rupture Control Sys Instrumentation Surveillance Requirements | Request |