Semantic search
Jump to navigation
Jump to search
Issue date | From | Title | Project stage | |
---|---|---|---|---|
RA-21-0056, Refueling Outage 32 Steam Generator Tube Inspection Report | 26 May 2021 | Duke Energy Kapopoulos E | Refueling Outage 32 Steam Generator Tube Inspection Report | Request |
RA-21-0254, Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/ Temperature Limit Cooldown Curves | 9 December 2021 | Duke Energy Kapopoulos E | Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/ Temperature Limit Cooldown Curves | Request |
RA-21-0076, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | 9 December 2021 | Duke Energy Kapopoulos E | Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections | Request |
ML22005A087 | 5 January 2022 | Tanya Hood Plant Licensing Branch II | Acceptance of Requested Licensing Action Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves | Acceptance Review |
ML22159A295 | 3 August 2022 | Luke Haeg Plant Licensing Branch II | Issuance of Amendment No. 271 Regarding Correction to Non-Conservative Technical Specifications Figure 3.4.3-2, Pressure/Temperature Limit Cooldown Curves | Approval |