Semantic search
Jump to navigation
Jump to search
Entered date | Event description | |
---|---|---|
ENS 51967 | 31 May 2016 18:12:00 | On 05/31/2016 at 1626 (EDT), a Reactor Trip occurred on Loss of Load RPS (Reactor Protection System) actuation. The Turbine Trip was apparently caused by a failed ESFAS (Engineered Safety Feature Actuation System) logic module. The failed NSR (Non Safety Related) logic module was associated with 11 Steam Generator High Level Turbine Trip. All systems responded as designed. Normal decay heat removal is to the condenser. All offsite power sources remained in service. The NRC Resident Inspector was notified. |
ENS 49463 | 22 October 2013 16:59:00 | A non-licensed contract employee supervisor had a confirmed positive for alcohol during a random fitness for duty test. The contractor's access to the plant has been terminated. The licensee notified the NRC Resident Inspector. |