 Entered dateEvent description
ENS 5611217 September 2022 13:06:00The following information was provided by the Southern Nuclear Company via email: At 2257 EDT on 09/16/2022, it was determined that there was a programmatic vulnerability of the Fleet FFD program. Specifically, it was determined that some individuals were not placed into the follow-up pool for additional screening when required by the program. All identified personnel were in the random FFD pool, and were subject to the behavioral observation program. This is reportable in accordance with 10CFR26.719(b)(4) for all Units and 10CFR26.417(b)(1) for Vogtle Units 3&4. The NRC Resident Inspectors have been notified. See EN#s 56113, 56114, and 56115.
ENS 5611317 September 2022 13:06:00The following information was provided by the Southern Nuclear Company via email: At 2257 EDT on 09/16/2022, it was determined that there was a programmatic vulnerability of the Fleet FFD program. Specifically, it was determined that some individuals were not placed into the follow-up pool for additional screening when required by the program. All identified personnel were in the random FFD pool, and were subject to the behavioral observation program. This is reportable in accordance with 10CFR26.719(b)(4) for all Units and 10CFR26.417(b)(1) for Vogtle Units 3 and 4. The NRC Resident Inspectors have been notified. See EN#s 56112, 56114, and 56115.
ENS 5611417 September 2022 13:06:00The following information was provided by Southern Nuclear Company via email: At 2257 EDT on 09/16/2022, it was determined that there was a programmatic vulnerability of the Fleet FFD program. Specifically, it was determined that some individuals were not placed into the follow-up pool for additional screening when required by the program. All identified personnel were in the random FFD pool, and were subject to the behavioral observation program. This is reportable in accordance with 10CFR26.719(b)(4) for all Units and 10CFR26.417(b)(1) for Vogtle Units 3 and 4. The NRC Resident Inspectors have been notified. See EN#s 56112, 56113, and 56115.
ENS 5611517 September 2022 13:06:00The following information was provided by the Southern Nuclear Company via email: At 2257 EDT on 09/16/2022, it was determined that there was a programmatic vulnerability of the Fleet FFD program. Specifically, it was determined that some individuals were not placed into the follow-up pool for additional screening when required by the program. All identified personnel were in the random FFD pool, and were subject to the behavioral observation program. This is reportable in accordance with 10CFR26.719(b)(4) for all Units and 10CFR26.417(b)(1) for Vogtle Units 3 and 4. The NRC Resident Inspectors have been notified. See EN#s 56112, 56113, and 56114.
ENS 557357 February 2022 15:49:00The following information was provided by the licensee via telefone: A non-licensed contractor superintendent had a confirmed positive for alcohol during a for-cause fitness for duty test. The employee's access to the plant has been terminated. The NRC Resident Inspector has been notified.
ENS 5555229 October 2021 14:25:00At 1010 EDT on October 29, 2021, Southern Nuclear Operating Company (SNC) determined a contractor supervisor attempted to subvert a random Fitness-for-Duty (FFD) test. The employee's badge has been confiscated. The NRC Resident Inspector has been notified.
ENS 551859 April 2021 16:08:00A contract employee supervisor had a confirmed positive for illegal drugs during a random fitness-for-duty test. The employee's access to the plant had been terminated.
ENS 5496321 October 2020 14:10:00In accordance with 10 CFR 52.99(c)(2) as described in NEI 08-01, Industry Guideline for the ITAAC Closure Process Under 10 CFR Part 52, Vogtle Units 3 and 4 Construction is making this notification to the NRC for determining that Inspections, Tests, Analyses and Acceptance Criteria (ITAAC) 2.3.05.13a.ii (Index No. 344) for Unit 4 requires additional actions to restore the completed status. The ITAAC Closure Notifications for Unit 4 ITAAC 344 was submitted on July 22, 2020 (ML20204B029). On October 19, 2020, it was determined that maintenance activities for the Unit 4 Polar Crane auxiliary hoist holding brake used a different approach for Post Work Verification (PWV) than the original test described in the ICN (ITAAC Closure Notification) for ITAAC 344. The alternate PWV used a test method that is standard industry practice and in accordance with ASME B30.2 to demonstrate that the Acceptance Criteria was met. An ITAAC Post Closure Notification will be submitted in accordance with 10 CFR 52.99(c)(2) and NEI 08-01. The 10 CFR 52.99(c)(4) All lTAAC Complete Notification has not been submitted for VEGP (Vogtle Electric Generating Plant) 4. The NRC Resident Inspector has been notified.