ENS 46266 | 22 September 2010 10:36:00 | Technical Support Center (TSC) HVAC unit (was) taken out of service for maintenance on (the) unit. The maintenance to be performed includes replacing the evaporator coil, the fan and the expansion valve. This work will be performed with high priority around the clock until the work is completed. Equipment unavailability hours will be reported to and tracked by the TSC HVAC System Engineer. Compensatory measures for performing essential TSC functions during this maintenance period have been established. These measures include the relocation of the TSC staff in the event of a declared emergency if the Emergency Director deems the TSC uninhabitable. The maintenance period is scheduled to last 13 to 16 hours, at which point the TSC HVAC (unit) will be restored to operable status. The licensee has notified the NRC Resident Inspector. |