 Entered dateEvent description
ENS 5378913 December 2018 14:37:00At 1700 EST on December 12, 2018, a contractor supervisor violated the licensee's Fitness-for-Duty (FFD) program by subverting a follow-up Fitness for Duty Test. The contractor's site access has been terminated. The NRC Resident Inspector was notified. No work was performed on safety related equipment. The licensee has made a PADs entry.
ENS 5359511 September 2018 17:53:00At 1430 EDT on September 11, 2018, Southern Nuclear Operating Company (SNC) determined a contractor supervisor confirmed positive for drugs during a Fitness-for-Duty (FFD) test. The employee's unescorted access to the plant has been suspended. The NRC Resident Inspector has been notified.
ENS 5356324 August 2018 15:14:00At 1034 (EDT) on August 24, 2018, a contractor supervisor violated the licensee's Fitness-for-Duty (FFD) program by subverting a follow-up Fitness for Duty Test. The contractor's site access has been terminated. The NRC Resident Inspector was notified.
ENS 5351518 July 2018 19:27:00A contractor supervisor tested positive for alcohol during an access upgrade fitness-for-duty test. The employee's access to the facility has been suspended. The licensee has notified the NRC Resident Inspector.
ENS 5351117 July 2018 17:01:00At 1338 (EDT) on July 17, 2018, Southern Nuclear Operating Company (SNC) determined a contractor supervisor confirmed positive for a controlled substance during a random Fitness-for-Duty (FFD) test. The employee's unescorted access to the plant has been suspended. The Resident Inspector has been notified.
ENS 524127 December 2016 13:12:00In accordance with 10 CFR 52.99(c)(2), Vogtle Units 3 and 4 Construction is making this notification to NRC for determining that Inspection, Test, Analysis, and Acceptance Criteria (ITAAC) 2.6.01.02.ii (ECS System Seismic Category I Equipment Design Basis Loads) for both units requires additional actions to restore its completed status. The Closure Notification for this ITAAC (NRC Index No. 580) was originally submitted on May 17, 2016 (reference ML 16138A080 and ML 16166A030). On November 1, 2016, it was determined by the Vogtle 3&4 Contractor that modifications to the Reactor Coolant Pump (RCP) breaker (i.e., switchgear) cabinet design were required to ensure compliance with the applicable portions of IEEE 384, 'Standard Criteria for Independence of Class 1E Equipment and Circuits.' The modification involves an engineering change which adds different equipment to the RCP Breaker cabinet that function to trip the RCP. The new components were not previously qualified for use in the RCP breaker cabinet assembly. Additional seismic qualification type testing and analysis of components are being performed for the added components in the RCP breaker. Update of the Equipment Qualification Data Package and Equipment Qualification Summary Report for the RCP breaker to confirm the breaker withstands seismic design basis loads and Licensee's acceptance is in progress. The revised ITAAC Completion Notice will be submitted to the NRC once all related ITAAC activities have been completed. The licensee has notified the NRC Resident Inspector.