Semantic search

Jump to navigation Jump to search
 Entered dateEvent description
ENS 541995 August 2019 01:28:00On August 4, 2019 at 1745 (EDT), Reactor Recirculation Pump (RRP) 11 tripped. The cause for the trip is under investigation. Following the RRP trip, the Average Power Range Monitors (APRMs) flow bias trips are inoperable due to reverse flow through RRP 11. The APRMs were restored to operable on August 4, 2019 at 1807, when the RRP 11 Discharge Blocking Valve was closed. This 8-hour non-emergency report is being made based upon requirements of 10CFR50.72(b)(3)(v)(A) which states: 'Licensee shall notify the NRC of any event or condition that at the time of discovery could have prevented the fulfillment of the safety function of structures or systems that are needed to: (A) Shut down the reactor and maintain it in a safe shutdown condition.' The licensee has notified the NRC Resident Inspector.