Semantic search

Jump to navigation Jump to search
 Entered dateEvent description
ENS 544709 January 2020 19:25:00The Division I Control Building Chiller 'A' failed to start during post maintenance testing. By design, the Division II Control Building Chiller 'B' should have started automatically but did not. Operators then manually placed the Division I Control Building Chiller 'C' in service. This condition rendered both Divisions of the Control Building Air Conditioning System Inoperable. The applicable LCO was entered and exited 10 minutes later with all required actions and completion times met. The cause of the failure is not known at this time. The plant was at 100% power at the time of the event and is currently stable at 100% power. The NRC Resident Inspector has been notified.