ENS 5631114 January 2023 14:05:00The following information was provided by the licensee via email: At 0721 EST on 01/14/2023, with Unit 3 in Mode 3 at 0 percent power and reactor trip breakers open, a manual actuation of the RPS occurred while conducting pre-criticality testing. The RPS manual actuation was procedurally driven in response to low gland steam pressure, resulting in the necessity to break condenser vacuum following a trip of the auxiliary boiler. The reactor trip breakers were in an open state at the time of the event. This event is being reported in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the RPS. There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.
ENS 5617523 October 2022 11:14:00The following information was provided by the licensee via email: At 0405 EDT on 10/23/2022, with (Vogtle) Unit 3 in Mode 6 and the reactor subcritical for greater than 28 hours, it was discovered that all three required flow paths for the stage four ADS were simultaneously inoperable; therefore, this condition is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(v). The diverse actuation system was operable for manual stage four ADS during this time period. At 0432 EDT on 10/23/2022, two of the three required flow paths were restored to operable status, which exited the reportable condition. All required flow paths were operable at 0447 EDT. There was no impact on the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.