Semantic search

Jump to navigation Jump to search
 Entered dateEvent description
ENS 4773613 March 2012 08:10:00

At approximately 0800 EDT on March 13, 2012, preplanned maintenance will be performed on the Emergency Operations Facility (EOF) ventilation system. This maintenance will be performed for charcoal sampling and filter testing. This maintenance is planned to be performed and completed within 10 hours. If an emergency condition should occur that would require activation of the EOF, the Harris Nuclear Plant (HNP) emergency plan has procedural guidance for use of an alternate location. This event is reportable per 10 CFR 50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity affects an emergency response facility for the duration of the maintenance. The licensee notified the NRC Resident Inspector.

  • * * UPDATE AT 1707 EDT ON 3/13/2012 FROM RICHARD VANDENBERG TO MARK ABRAMOVITZ * * *

Maintenance was completed and the system tested operable at 1645 EDT. The licensee notified the NRC Resident Inspector. Notified the R2DO (Guthrie).