Semantic search
Entered date | Event description | |
---|---|---|
ENS 47736 | 13 March 2012 08:10:00 | At approximately 0800 EDT on March 13, 2012, preplanned maintenance will be performed on the Emergency Operations Facility (EOF) ventilation system. This maintenance will be performed for charcoal sampling and filter testing. This maintenance is planned to be performed and completed within 10 hours. If an emergency condition should occur that would require activation of the EOF, the Harris Nuclear Plant (HNP) emergency plan has procedural guidance for use of an alternate location. This event is reportable per 10 CFR 50.72(b)(3)(xiii) as described in NUREG-1022, Rev. 2 since this work activity affects an emergency response facility for the duration of the maintenance. The licensee notified the NRC Resident Inspector.
Maintenance was completed and the system tested operable at 1645 EDT. The licensee notified the NRC Resident Inspector. Notified the R2DO (Guthrie). |