 Entered dateEvent description
ENS 5628624 December 2022 05:08:00The following information was provided by the licensee via email: At 0222 (EST) on 12/24/22, with Unit 2 at 100 percent power during steady state operation, the reactor automatically tripped and a safety injection actuated due to steam generator differential pressure. The trip and safety injection were not complex, with all systems responding normally post-trip. An actuation of the auxiliary feedwater system occurred following the reactor trip as expected due to low level in the steam generators. The unit is stable in Mode 3. The turbine bypass steam dumps and auxiliary feedwater system are removing decay heat. Salem Unit 1 was not affected. Due to the actuation of the reactor protection system while critical, this event is being reported as a four hour, non-emergency notification per 10 CFR 50.72(b)(2)(iv)(B). This event is also being reported as an eight hour non-emergency notification in accordance with 10 CFR 50.72(b)(3)(iv)(A) as an event that results in a valid actuation of the auxiliary feedwater system. There was no impact to the health and safety of the public or plant personnel. The NRC Resident Inspector has been notified.