Semantic search
Jump to navigation
Jump to search
Entered date | Event description | |
---|---|---|
ENS 46667 | 11 March 2011 02:32:00 | Loss of power to radiological monitoring equipment (primary and backup). This constitutes a major loss of emergency assessment capability per Nine Mile Point procedures. The cause of the loss of monitoring equipment is a downed 13.2 kV power line. Monitoring capability was restored at 0100. The loss of power was caused by high winds, and the grid operator was able to restore power at 0100 EST. The NRC Resident Inspector has been notified. |