Semantic search

Jump to navigation Jump to search
 Entered dateEvent description
ENS 4422117 May 2008 13:44:00At 0904 on 5/17/2008, ' D' and 'E' transfer busses were lost due to a failed relay on a supply breaker in the switchyard. Emergency Diesel Generators #2 and #3 auto-started to re-power the 1J and 2H Emergency Busses. Shutdown cooling on U2 was maintained during the event. U1 remained at 100% power. Offsite power was restored to the 1J and 2H Emergency busses at 1211. This 8 hour report is being made for Surry Units 1 and 2 in accordance with 10 CFR 50.72(b)(3)(iv)(A). The licensee notified the NRC Resident Inspector.