Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000327/201800431 January 2019NRC Integrated Inspection Report 05000327/2018004 and 05000328/2018004Boric Acid
High Radiation Area
Non-Destructive Examination
Past operability
Enforcement Discretion
Temporary Modification
Functionality Assessment
Locked High Radiation Area
Aging Management
Missed surveillance
Surveillance Frequency Control Program
Operability Determination
License Renewal
Liquid penetrant
Fire Protection Program
Siren
CNL-19-012, American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection Program, Request for Alternative, 18-ISI-130 January 2019American Society of Mechanical Engineers Boiler and Pressure Vessel Code Section XI, Inservice Inspection Program, Request for Alternative, 18-ISI-1Dissimilar Metal Weld
CNL-19-016, Response to Request for Additional Information on License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report30 January 2019Response to Request for Additional Information on License Amendment Request to Modify Essential Raw Cooling Water Motor Control Center Breakers and to Revise the Updated Final Safety Analysis Report
CNL-19-023, Plants - Supplement to Application to Modify the Technical Specifications for the Browns Ferry Nuclear Plant (TS-512), Sequoyah Nuclear Plant (TS-17-03)and Watts Bar Nuclear Plant (TS-17-20) to ...25 January 2019Plants - Supplement to Application to Modify the Technical Specifications for the Browns Ferry Nuclear Plant (TS-512), Sequoyah Nuclear Plant (TS-17-03)and Watts Bar Nuclear Plant (TS-17-20) to ...
CNL-18-137, American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternatives RP 09 (Sqn)And IST-RR-6 (WBN)18 January 2019American Society of Mechanical Engineers Operation and Maintenance Code, Request for Alternatives RP 09 (Sqn)And IST-RR-6 (WBN)
ML19018A08817 January 2019Annual Letter - Generic Fundamentals Examination (GFE) Section of the Written Operator Licensing Examination for 2019Generic Fundamentals Examination
ML19015A41915 January 2019NRR E-mail Capture - RAI - Sequoyah Nuclear Plant, Units 1 and 2, LAR to Adopt 10 CFR50.69 Risk-informed SSCSafe Shutdown
High winds
Internal Flooding
Probabilistic Risk Assessment
Multiple Spurious Operation
FLEX
CNL-19-001, Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Organization Topical Report, TVA-NPOD89-A15 January 2019Sequoyah Nuclear Plant and Watts Bar Nuclear Plant - Organization Topical Report, TVA-NPOD89-AFire Protection Program
ML18344A56715 January 2019November 14, 2018, Summary of Public Meeting with Tennessee Valley Authority Regarding Presubmittal Licensing Actions - Sequoyah Nuclear Plant, Units 1 and 2
CNL-19-013, Comments on the Draft Safety Evaluation for Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation.11 January 2019Comments on the Draft Safety Evaluation for Topical Report TVA Overall Basin Probable Maximum Precipitation and Local Intense Precipitation Analysis Calculation.
IR 05000327/201841211 January 2019NRC Inspection Report 05000327/2018412 and 05000328/2018412; and Investigation Report No. 2-2018-012Fatigue Rule
ML19014A1399 January 2019Discharge Monitoring Report for December 2018
IR 05000327/20180139 January 2019Re-Issued- Sequoyah Nuclear Plant - Nuclear Regulatory Commission Integrated Inspection Report 05000327/2018013 and 05000328/2018013