Semantic search

Jump to navigation Jump to search
 Issue dateTitleFromTo
NRC Generic Letter 1988-0622 March 1988NRC Generic Letter 1988-006: Removal of Organization Charts from Technical Specification Administrative Control RequirementsMiraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1989-043 April 1989NRC Generic Letter 1989-004: Guidance on Developing Acceptable Inservice Testing ProgramsVarga S
Office of Nuclear Reactor Regulation
ML0311405497 November 1991Withdrawn NRC Generic Letter 1991-018: Information to Licensees Regarding Two NRC Inspection Manual Sections on Resolution of Degraded and Nonconforming Conditions and on OperabilityPartlow J
Office of Nuclear Reactor Regulation
ML20127M72419 January 1993SE Concluding That Relief Requests Submitted on 920507 Are Covered by Rulemaking on 920908,which Was Incorporated Into 10CFR50.55a(b)Office of Nuclear Reactor Regulation
Information Notice 1993-13, Undetected Modification of Flow Characteristics in High Pressure Safety Injection System16 February 1993Undetected Modification of Flow Characteristics in High Pressure Safety Injection SystemGrimes B
Office of Nuclear Reactor Regulation
ML20057C03210 September 1993Insp Repts 50-498/93-27 & 50-499/93-27 on 930823-27.No Violations Noted.Major Areas Inspected:Reliability & Operability of safety-related Check ValvesPowers D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
ST-HL-AE-4788, Forwards Request for Incorporation of OM Code Into Pump & Valve Inservice Test Plan & Supplemental Info to Rev 6 to Unit 1 & Rev 4 to Unit 2 Plan14 June 1994Forwards Request for Incorporation of OM Code Into Pump & Valve Inservice Test Plan & Supplemental Info to Rev 6 to Unit 1 & Rev 4 to Unit 2 PlanCreating Houston Lighting and Power Company
Cloninger T
Office of Information Resources Management
NRC Generic Letter 1996-0518 September 1996NRC Generic Letter 1996-005: Periodic Verification of Design-Basis Capability of Safety-Related Motor-Operated ValvesMartin T
Office of Nuclear Reactor Regulation
ST-HL-AE-0055, Submits Revs to Valve Relief Requests RR-55,RR-53 Rev 1 & RR-34 Rev 1 for Unit 1 & RR-51,RR-49 Rev 1 & RR-31 Rev 1 for Unit 2 to Use Alternate Testing Frequency in Assessing Operational Readiness.W/Three Oversize Drawings25 November 1996Submits Revs to Valve Relief Requests RR-55,RR-53 Rev 1 & RR-34 Rev 1 for Unit 1 & RR-51,RR-49 Rev 1 & RR-31 Rev 1 for Unit 2 to Use Alternate Testing Frequency in Assessing Operational Readiness.W/Three Oversize DrawingsThomas S
Creating Houston Lighting and Power Company
Office of Information Resources Management
ST-HL-AE-5561, Submits Response to NRC Ltr Dtd 961009,requesting Info Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases Info6 February 1997Submits Response to NRC Ltr Dtd 961009,requesting Info Per 10CFR50.54(f) Re Adequacy & Availability of Design Bases InfoCottle W
Creating Houston Lighting and Power Company
Office of Information Resources Management
ML20199D02517 November 1997SER Accepting Relief Requests for Inservice Testing Program for Pumps & ValvesNRC (Affiliation Not Assigned)
ML20238F49631 August 1998Discusses 980828 Request That NRC Exercise Discretion Not to Enforce Compliance W/Actions in STP TS SR 4.0.5 Re Testing Requirements for 8 Containment Isolation Cvs.Noed Warranted Because Action Involves Minimal or No Safety ImpactNRC (Affiliation Not Assigned)
Bateman W
Cottle W
Creating Houston Lighting and Power Company
ML20151U3241 September 1998Discusses 980828 Request for NRC to Exercise Discretion Not to Enforce Compliance W/Actions Required in South Texas TS SR 4.0.5 as Applies to Testing Requirements of Nine Containment Isolation Valves in Unit 1NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Merschoff E
Cottle W
Creating Houston Lighting and Power Company
IR 05000498/19980114 February 1999Insp Repts 50-498/98-11 & 50-499/98-11 on 981129-990109.No Violations Noted.Major Areas Inspected:Operations, Maintenance,Engineering & Plant SupportNRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
ML20210D91623 July 1999Safety Evaluation Accepting Inservice Testing Relief Request RR-56 Re Component Cooling Water & Safety Injection Sys Containment Isolation Check Valve Closure Test FrequencyNRC (Affiliation Not Assigned)
ML0209203599 April 2002RAI, Risk-Informed Inservice Testing (Tac Nos. MB2136 and MB2137)Thadani M
NRC/NRR/DLPM/LPD4
South Texas
Cottle W
ML02322012512 November 2002Part 1 of 2, South Texas, Revised Request to Implement a Risk-Informed Inservice Testing Program for Pumps and Valves Beginning the Second 10-Year Interval (Relief Request RR-ENG-IST-2-01), Attachments 1 - 3South Texas
Jordan T
Office of Nuclear Reactor Regulation
Document Control Desk
ML02322016012 November 2002Part 2 of 2, South Texas, Revised Request to Implement a Risk-Informed Inservice Testing Program for Pumps and Valves Beginning the Second 10-Year Interval (Relief Request RR-ENG-IST-2-01), Attachments 4 - 6South Texas
Jordan T
Office of Nuclear Reactor Regulation
Document Control Desk
ML0312207302 May 2003Relief, Second 10-Year Inservice Testing ProgramNRC/NRR/DLPM/LPD4
Gramm R
South Texas
Sheppard J