Semantic search
Jump to navigation
Jump to search
Issue date | Title | From | To | |
---|---|---|---|---|
NRC Generic Letter 1988-05 | 17 March 1988 | NRC Generic Letter 1988-005: Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR Plants | Miraglia F Office of Nuclear Reactor Regulation | |
NRC Generic Letter 1988-07 | 7 April 1988 | NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants. | Miraglia F Office of Nuclear Reactor Regulation | |
NRC Generic Letter 1988-12, Removal of Fire Protection Requirements from Technical Specification | 2 August 1988 | NRC Generic Letter 1988-012: Removal of Fire Protection Requirements from Technical Specifications | Miraglia F Office of Nuclear Reactor Regulation | |
NRC Generic Letter 1991-17 | 17 October 1991 | NRC Generic Letter 1991-017: Generic Safety Issue 29, Bolting Degradation or Failure in Nuclear Power Plants. | Partlow J Office of Nuclear Reactor Regulation | |
Information Notice 1986-10, Degradation of Reactor Coolant System Pressure Boundary Resulting from Boric Acid Corrosion. | 5 January 1995 | Degradation of Reactor Coolant System Pressure Boundary Resulting from Boric Acid Corrosion. | Grimes B Office of Nuclear Reactor Regulation | |
Information Notice 1986-10, Degradation of Reactor Coolant System Pressure Boundary Resulting From Boric Acid Corrosion. | 5 January 1995 | Degradation of Reactor Coolant System Pressure Boundary Resulting From Boric Acid Corrosion. | Grimes B K Office of Nuclear Reactor Regulation | |
ML20203D214 | 9 December 1997 | Discusses Predecisional EC Conducted in Region IV Ofc on 970930 Re Scope of Licensee Corrective Actions in Response to Identified Primary Water Stress Corrosion Cracking in Reactor Coolant Sys Inconel 600 Nozzle Penetrations | Howell A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) | SOUTHERN CALIFORNIA EDISON CO. Ray H |
ML20217P917 | 30 April 1998 | Provides Addl Info to Support long-term Use of Mechanical Nozzle Seal Assemblies at San Onofre Nuclear Generating Station,As Requested by NRC in | SOUTHERN CALIFORNIA EDISON CO. Rainsberry J | Office of Information Resources Management |
ML020940197 | 2 April 2002 | Southern California Edison'S 15-day Response to NRC Bulletin 2002-01 Re Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary Integrity | Southern California Edison Nunn D | Office of Nuclear Reactor Regulation Document Control Desk |
ML023180649 | 14 November 2002 | RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity 60 Day Response Tacs. MB4575 & MB4576 | Bo Pham NRC/NRR/DLPM/LPD4 | Southern California Edison Ray H |
ML030280169 | 24 January 2003 | Mechanical Nozzle Seal Assembly Type 2 Code Replacement Request for Relief from 10 CFR 50.55a | Southern California Edison Scherer A | Office of Nuclear Reactor Regulation Document Control Desk |
ML031890926 | 2 July 2003 | Notification of Updating Inservice Inspection Program & Submittal of Relief Requests for Third 10-Year Inspection Interval San Onofre Nuclear Generating Station Units 2 & 3 | Southern California Edison Scherer A | Office of Nuclear Reactor Regulation Document Control Desk |
ML050560035 | 9 March 2005 | Evaluation of Relief for Use of Mechanical Nozzle Assemblies as an Alternate to the American Society of Mechanical Engineers Code Repairs | NRC/NRR/DLPM/LPD4 Gramm R | Southern California Edison Ray H |
ML14108A458 | 17 April 2014 | San Onofre Nuclear Generating Station (Songs), Units 1, 2 and 3, and the Independent Spent Fuel Storage Installation - Summary Report of Commitment Changes Implemented During the Period from March 2, 2013, Through March 1, 2014 | Southern California Edison Brabec R C | NRC/FSME Office of Nuclear Material Safety and Safeguards Document Control Desk |
NEI 99-04, San Onofre Nuclear Generating Station (Songs), Units 1, 2 and 3, and the Independent Spent Fuel Storage Installation - Summary Report of Commitment Changes Implemented During the Period from March 2, 2013, Through March 1, 2014 | 17 April 2014 | San Onofre Nuclear Generating Station (Songs), Units 1, 2 and 3, and the Independent Spent Fuel Storage Installation - Summary Report of Commitment Changes Implemented During the Period from March 2, 2013, Through March 1, 2014 | Southern California Edison Brabec R C | NRC/FSME Office of Nuclear Material Safety and Safeguards Document Control Desk |