Semantic search

Jump to navigation Jump to search
 Issue dateTitleFromTo
NRC Generic Letter 1988-0517 March 1988NRC Generic Letter 1988-005: Boric Acid Corrosion of Carbon Steel Reactor Pressure Boundary Components in PWR PlantsMiraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1988-077 April 1988NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants.Miraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1988-12, Removal of Fire Protection Requirements from Technical Specification2 August 1988NRC Generic Letter 1988-012: Removal of Fire Protection Requirements from Technical SpecificationsMiraglia F
Office of Nuclear Reactor Regulation
NRC Generic Letter 1991-1717 October 1991NRC Generic Letter 1991-017: Generic Safety Issue 29, Bolting Degradation or Failure in Nuclear Power Plants.Partlow J
Office of Nuclear Reactor Regulation
Information Notice 1986-10, Degradation of Reactor Coolant System Pressure Boundary Resulting from Boric Acid Corrosion.5 January 1995Degradation of Reactor Coolant System Pressure Boundary Resulting from Boric Acid Corrosion.Grimes B
Office of Nuclear Reactor Regulation
Information Notice 1986-10, Degradation of Reactor Coolant System Pressure Boundary Resulting From Boric Acid Corrosion.5 January 1995Degradation of Reactor Coolant System Pressure Boundary Resulting From Boric Acid Corrosion.Grimes B K
Office of Nuclear Reactor Regulation
ML20203D2149 December 1997Discusses Predecisional EC Conducted in Region IV Ofc on 970930 Re Scope of Licensee Corrective Actions in Response to Identified Primary Water Stress Corrosion Cracking in Reactor Coolant Sys Inconel 600 Nozzle PenetrationsHowell A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
SOUTHERN CALIFORNIA EDISON CO.
Ray H
ML20217P91730 April 1998Provides Addl Info to Support long-term Use of Mechanical Nozzle Seal Assemblies at San Onofre Nuclear Generating Station,As Requested by NRC inSOUTHERN CALIFORNIA EDISON CO.
Rainsberry J
Office of Information Resources Management
ML0209401972 April 2002Southern California Edison'S 15-day Response to NRC Bulletin 2002-01 Re Reactor Pressure Vessel Head Degradation and Reactor Coolant Pressure Boundary IntegritySouthern California Edison
Nunn D
Office of Nuclear Reactor Regulation
Document Control Desk
ML02318064914 November 2002RAI, Bulletin 2002-01, Reactor Pressure Vessel Head Degradation & Reactor Coolant Pressure Boundary Integrity 60 Day Response Tacs. MB4575 & MB4576Bo Pham
NRC/NRR/DLPM/LPD4
Southern California Edison
Ray H
ML03028016924 January 2003Mechanical Nozzle Seal Assembly Type 2 Code Replacement Request for Relief from 10 CFR 50.55aSouthern California Edison
Scherer A
Office of Nuclear Reactor Regulation
Document Control Desk
ML0318909262 July 2003Notification of Updating Inservice Inspection Program & Submittal of Relief Requests for Third 10-Year Inspection Interval San Onofre Nuclear Generating Station Units 2 & 3Southern California Edison
Scherer A
Office of Nuclear Reactor Regulation
Document Control Desk
ML0505600359 March 2005Evaluation of Relief for Use of Mechanical Nozzle Assemblies as an Alternate to the American Society of Mechanical Engineers Code RepairsNRC/NRR/DLPM/LPD4
Gramm R
Southern California Edison
Ray H
ML14108A45817 April 2014San Onofre Nuclear Generating Station (Songs), Units 1, 2 and 3, and the Independent Spent Fuel Storage Installation - Summary Report of Commitment Changes Implemented During the Period from March 2, 2013, Through March 1, 2014Southern California Edison
Brabec R C
NRC/FSME
Office of Nuclear Material Safety and Safeguards
Document Control Desk
NEI 99-04, San Onofre Nuclear Generating Station (Songs), Units 1, 2 and 3, and the Independent Spent Fuel Storage Installation - Summary Report of Commitment Changes Implemented During the Period from March 2, 2013, Through March 1, 201417 April 2014San Onofre Nuclear Generating Station (Songs), Units 1, 2 and 3, and the Independent Spent Fuel Storage Installation - Summary Report of Commitment Changes Implemented During the Period from March 2, 2013, Through March 1, 2014Southern California Edison
Brabec R C
NRC/FSME
Office of Nuclear Material Safety and Safeguards
Document Control Desk