Issue date | Title | From | To | |
---|---|---|---|---|
NRC Generic Letter 1988-07 | 7 April 1988 | NRC Generic Letter 1988-007: Modified Enforcement Policy Relating to 10 CFR 50.49 Environmental Qualification of Electrical Equipment Important to Safety for Nuclear Power Plants. | Miraglia F Office of Nuclear Reactor Regulation | |
A07029, Responds to Generic Ltr 88-01, IGSCC in Austenitic Stainless Steel Piping. Util Developed Encl Updated IGSCC Program for Facility Which Follows Guidelines of NUREG-0313, Rev 2 | 27 July 1988 | Responds to Generic Ltr 88-01, IGSCC in Austenitic Stainless Steel Piping. Util Developed Encl Updated IGSCC Program for Facility Which Follows Guidelines of NUREG-0313, Rev 2 | NORTHEAST UTILITIES Mroczka E Northeast Nuclear Energy | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
ML20247B782 | 22 March 1989 | Requests That Addl Info Re IGSCC & Generic Ltr 88-01 Be Submitted within 60 Days of Receipt of Ltr,For Completion of Review | Office of Nuclear Reactor Regulation Boyle M | Mroczka E Northeast Nuclear Energy |
B13239, Forwards Results of Weld Exams from IGSCC Piping Insps During 1989 Refueling Outage.Installation of Acoustic Local Leak Detection Sys on X-168 Core Spray Piping Penetration Completed Prior to Start of Outage | 4 May 1989 | Forwards Results of Weld Exams from IGSCC Piping Insps During 1989 Refueling Outage.Installation of Acoustic Local Leak Detection Sys on X-168 Core Spray Piping Penetration Completed Prior to Start of Outage | NORTHEAST UTILITIES Mroczka E Sears C Northeast Nuclear Energy | Office of Information Resources Management |
B13249, Forwards Addl Info on 1989 Refueling Outage IGSCC Piping Insps & Mods,Per Generic Ltr 88-01.Calculation Re Weld Overlay Design for RWCU Weld CUAJ-5 Encl | 17 May 1989 | Forwards Addl Info on 1989 Refueling Outage IGSCC Piping Insps & Mods,Per Generic Ltr 88-01.Calculation Re Weld Overlay Design for RWCU Weld CUAJ-5 Encl | NORTHEAST UTILITIES Mroczka E Northeast Nuclear Energy | Office of Information Resources Management |
B13229, Forwards Addl Info Re Generic Ltr 88-01 in Response to 890422 Request.Submittals Constitute Complete IGSCC Program, W/Responses to NRC Positions & No Other Interpretation of Program Should Be Construed by Omission of Any Info | 19 May 1989 | Forwards Addl Info Re Generic Ltr 88-01 in Response to 890422 Request.Submittals Constitute Complete IGSCC Program, W/Responses to NRC Positions & No Other Interpretation of Program Should Be Construed by Omission of Any Info | NORTHEAST UTILITIES Mroczka E Northeast Nuclear Energy | Office of Information Resources Management |
ML20247G542 | 22 May 1989 | Submits Results of 1989 Refueling Outage IGSCC Results.Igscc Insp,Overlay Repair & Expanded Category D Insp Sample Satisfactory | Office of Nuclear Reactor Regulation Boyle M | Mroczka E Northeast Nuclear Energy |
ML20245A678 | 7 June 1989 | Insp Rept 50-245/89-11 on 890501-05.No Violations Noted. Major Areas Inspected:Observations,Review of Data,Licensee Response to Generic Ltr 88-01,NDE Procedures,Engineering Support & QA Involvement | Chaudhary S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) Mcbrearty R | |
A07937, Submits Responses to AEOD Survey on NRC Backfitting Process. Table Listing Costs of Imposed Backfits in 1988 Encl | 8 June 1989 | Submits Responses to AEOD Survey on NRC Backfitting Process. Table Listing Costs of Imposed Backfits in 1988 Encl | NORTHEAST UTILITIES Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. Northeast Nuclear Energy | Jordan E NRC OFFICE FOR ANALYSIS & EVALUATION OF OPERATIONAL DATA (AEOD) |
B13281, Forwards Revised Page 3 to Attachment 1 to 890519 Response to Request for Addl Info Re Response to Generic Ltr 88-01. Typos & Omissions Corrected | 20 June 1989 | Forwards Revised Page 3 to Attachment 1 to 890519 Response to Request for Addl Info Re Response to Generic Ltr 88-01. Typos & Omissions Corrected | NORTHEAST UTILITIES Mroczka E Northeast Nuclear Energy | Office of Information Resources Management |
ML20248D570 | 22 September 1989 | Inservice Insp Summary Rept for Northeast Utils Millstone Nuclear Power Station Unit 1 1989 Refueling Outage | NORTHEAST UTILITIES | |
IR 05000245/1988099 | 2 October 1989 | SALP Repts 50-245/88-99 & 50-336/88-99 for 880101-890615 | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |
NRC Generic Letter 1989-21 | 19 October 1989 | NRC Generic Letter 1989-021: Request for Information Concerning Status of Implementation of Unresolved Safety Issue (USI) Requirements | Partlow J Office of Nuclear Reactor Regulation | |
NRC Generic Letter 1990-04 | 25 April 1990 | NRC Generic Letter 1990-004: Request for Information on Status of Licensee Implementation of Generic Safety Issues Resolved with Imposition of Requirements or Corrective Actions | Partlow J Office of Nuclear Reactor Regulation | |
NRC Generic Letter 1990-05 | 15 June 1990 | NRC Generic Letter 1990-005: Guidance for Performing Temporary Non-Code Repair of ASME Code Class 1, 2, and 3 Piping | Partlow J Office of Nuclear Reactor Regulation | |
ML20126M423 | 31 July 1992 | TER on Third 10-Yr Interval ISI Program Plan:Northeast Utils,Millstone Nuclear Power Station,Unit 1 | INC. EG&G IDAHO IDAHO NATIONAL ENGINEERING & ENVIRONMENTAL LABORATORY Galbraith S Beth Brown | NRC |
IR 05000245/1993002 | 5 February 1993 | Insp Repts 50-245/93-02 & 50-423/93-02 on 930111-15.No Violations Noted.Major Areas Inspected:Isi Acitivities to Ascertain Those Activities Conducted in Accordance W/ Applicable ASME Code & Regulatory Requirements | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) Gray E Mcbrearty R | |
ML20128M201 | 9 October 1996 | Insp Repts 50-245/96-06,50-336/96-06 & 50-423/96-06 on 960627-0826.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |
ML20135D007 | 3 December 1996 | Insp Repts 50-245/96-08,50-336/96-08 & 50-423/96-08 on 960827-1025.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |
ML20135E616 | 24 February 1997 | Insp Repts 50-245/96-09,50-336/96-09 & 50-423/96-09 on 961026-1231.Violations Noted.Major Areas Inspected: Operations,Maint,Engineering & Plant Support | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) | |
ML053260012 | 20 January 2006 | Relief, Relief Request IR-2-39 Pertaining to the Repair and Inspection of Nozzle to Safe End Weld No. 03-X-5641-E-T at Millstone Power Station, Unit No. 3 (MPS3) | Darrell Roberts Plant Licensing Branch III-2 | Dominion Nuclear Connecticut Christian D |
ML14112A071 | 11 April 2014 | Alternative Request RR-04-20, Use of Weld Overlays as an Alternative Repair and Mitigation Technique | Dominion Nuclear Connecticut Mark D. Sartain | Office of Nuclear Reactor Regulation Document Control Desk |