Semantic search

Jump to navigation Jump to search
 Issue dateTitle
ML23240A3695 October 2023Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary)
ML23062A63129 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 4, Reactor
ML23062A64229 December 2022Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML23067A18029 December 2022Rev. 18 to Technical Specification Bases, Chapter 3.1, Reactivity Control Systems
ML23067A18529 December 2022Rev. 18 to Technical Specification, Bases Change, Chapter B 3.9, Refueling Operations
ML23067A18629 December 2022Rev. 18 to Technical Specification, Bases Change, Chapter 3.2, Power Distribution Limits
ML22285A11712 October 2022Enclosure 1: Description and Assessment of the Proposed Change
ML22153A1762 June 2022Enclosure 1 - Description and Assessment of the Proposed Change
ML22153A1792 June 2022Attachment 3 - Marked-Up Technical Specifications Bases
ML21335A4571 December 2021Enclosure 5: Proposed Technical Specification Bases Changes (Mark-up - for Info Only)
ML21272A17328 September 2021Enclosure 5 - Proposed TS Bases Changes (for Information Only)
ML21193A18822 June 2021Revision OL-25 to Final Safety Analysis Report, Chapter 4 - Reactor
ML21193A19722 June 2021Revision OL-25 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML21194A26622 June 2021Technical Specification Bases, Chapter B 3.1, Reactivity Control Systems
ML21194A27122 June 2021Technical Specification Bases, Chapter B 3.9, Refueling Operations
ML21194A27222 June 2021Technical Specification Bases, Chapter B 3.2, Power Distribution Limits
ML20209A01513 November 2019Rev. OL-24 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems
ML20209A02013 November 2019Rev. OL-24 to Final Safety Analysis Report, Chapter 4, Reactor
ML20209A10913 November 2019Technical Specifications Bases, Chapter B 3.9, Refueling Operations
ML20209A12013 November 2019Technical Specifications Base, Chapter B 3.1, Reactivity Controls Systems
ML20209A13813 November 2019Technical Specification Bases, Chapter B 3.2, Power Distribution Limits
ML17061A2045 April 2017Final Safety Analysis Report, Revision OL-22, Chapter 9
ML17072A01513 March 2017Final Safety Analysis Report Text, Revision OL-22, Chapter 4, Reactor
ULNRC-06328, Revision of TS 5.6.5, Core Operating Limits Report (Colr), to Allow the Use of the Paragon and Nexus Core Design Methods (LDCN 16-0011)11 October 2016Revision of TS 5.6.5, Core Operating Limits Report (Colr), to Allow the Use of the Paragon and Nexus Core Design Methods (LDCN 16-0011)
ML16158A4571 June 20162016-06 Draft Written Examination
ML12065A1721 March 2012B 3.1 Reactivity Control Systems, B 3.1.6 Control Bank Insertion Limits, Bases, Background
ML12065A1711 March 2012B 3.1 Reactivity Control Systems, B 3.1.5 Shutdown Bank Insertion Limits, Bases, Background
ML12065A1701 March 2012B 3.1 Reactivity Control Systems, B 3.1.1 Shutdown Margin (SDM)
ULNRC-05725, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (LDCN 10-0020)5 August 2010Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (LDCN 10-0020)
ULNRC-05633, Revision of Technical Specification 3.3.91 June 2009Revision of Technical Specification 3.3.9
ML0704001688 March 2007Issuance of License Amendment No. 181 Regarding Unborated Water Source Isolation Valves
ULNRC-05297, Proposed Revision to Technical Specifications for Use of Beacon Power Distribution Monitoring System25 May 2006Proposed Revision to Technical Specifications for Use of Beacon Power Distribution Monitoring System
ULNRC-05269, Proposed Revision to Technical Specification 3.9.2 Unborated Water Source Isolation Valves and Associated Revisions to Technical Specification 3.3.9 Boron Dilution Mitigation System (Bdms) (License Amendment Request OL 1238)28 March 2006Proposed Revision to Technical Specification 3.9.2 Unborated Water Source Isolation Valves and Associated Revisions to Technical Specification 3.3.9 Boron Dilution Mitigation System (Bdms) (License Amendment Request OL 1238)
ULNRC-05101, Union Electric Co. Technical Specification Bases Revision 510 December 2004Union Electric Co. Technical Specification Bases Revision 5
ULNRC-04883, Proposed Revision to Technical Specification (TS) 3.9.2, Unborated Water Source Isolation Valves, to Revise & Rename Specification 3.9.2, Dilution Source Isolation Valves & Associated Revision to TS 3.3.9, Boron Dilution...15 December 2003Proposed Revision to Technical Specification (TS) 3.9.2, Unborated Water Source Isolation Valves, to Revise & Rename Specification 3.9.2, Dilution Source Isolation Valves & Associated Revision to TS 3.3.9, Boron Dilution...
ML03323022512 November 2003Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application.
ULNRC-04721, Technical Specification Bases Revision 330 August 2002Technical Specification Bases Revision 3
ML20195C51928 May 1999Proposed Tech Specs Sections 3.9.1,revised to Maintain CTS Requirements on Refueling Pool Boron Concentration Limits & 5.6.5,revised to Delete Item 5.6.5.a
ML20207F48027 May 1999Proposed Improved TSs & ITS Bases
ML20236Y1724 August 1998Proposed Tech Specs Re Conversion to Improved STS Sections 3.1,3.2,3.5,3.9 & 4.0