Semantic search
Jump to navigation
Jump to search
Issue date | Title | |
---|---|---|
ML23240A369 | 5 October 2023 | Issuance of Amendment No. 235 to Revise Technical Specifications to Use of Framatome Gaia Fuel (EPID L-2022-LLA-0150) (Non-Proprietary) |
ML23062A631 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 4, Reactor |
ML23062A642 | 29 December 2022 | Revision OL-26 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML23067A180 | 29 December 2022 | Rev. 18 to Technical Specification Bases, Chapter 3.1, Reactivity Control Systems |
ML23067A185 | 29 December 2022 | Rev. 18 to Technical Specification, Bases Change, Chapter B 3.9, Refueling Operations |
ML23067A186 | 29 December 2022 | Rev. 18 to Technical Specification, Bases Change, Chapter 3.2, Power Distribution Limits |
ML22285A117 | 12 October 2022 | Enclosure 1: Description and Assessment of the Proposed Change |
ML22153A176 | 2 June 2022 | Enclosure 1 - Description and Assessment of the Proposed Change |
ML22153A179 | 2 June 2022 | Attachment 3 - Marked-Up Technical Specifications Bases |
ML21335A457 | 1 December 2021 | Enclosure 5: Proposed Technical Specification Bases Changes (Mark-up - for Info Only) |
ML21272A173 | 28 September 2021 | Enclosure 5 - Proposed TS Bases Changes (for Information Only) |
ML21193A188 | 22 June 2021 | Revision OL-25 to Final Safety Analysis Report, Chapter 4 - Reactor |
ML21193A197 | 22 June 2021 | Revision OL-25 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML21194A266 | 22 June 2021 | Technical Specification Bases, Chapter B 3.1, Reactivity Control Systems |
ML21194A271 | 22 June 2021 | Technical Specification Bases, Chapter B 3.9, Refueling Operations |
ML21194A272 | 22 June 2021 | Technical Specification Bases, Chapter B 3.2, Power Distribution Limits |
ML20209A015 | 13 November 2019 | Rev. OL-24 to Final Safety Analysis Report, Chapter 9, Auxiliary Systems |
ML20209A020 | 13 November 2019 | Rev. OL-24 to Final Safety Analysis Report, Chapter 4, Reactor |
ML20209A109 | 13 November 2019 | Technical Specifications Bases, Chapter B 3.9, Refueling Operations |
ML20209A120 | 13 November 2019 | Technical Specifications Base, Chapter B 3.1, Reactivity Controls Systems |
ML20209A138 | 13 November 2019 | Technical Specification Bases, Chapter B 3.2, Power Distribution Limits |
ML17061A204 | 5 April 2017 | Final Safety Analysis Report, Revision OL-22, Chapter 9 |
ML17072A015 | 13 March 2017 | Final Safety Analysis Report Text, Revision OL-22, Chapter 4, Reactor |
ULNRC-06328, Revision of TS 5.6.5, Core Operating Limits Report (Colr), to Allow the Use of the Paragon and Nexus Core Design Methods (LDCN 16-0011) | 11 October 2016 | Revision of TS 5.6.5, Core Operating Limits Report (Colr), to Allow the Use of the Paragon and Nexus Core Design Methods (LDCN 16-0011) |
ML16158A457 | 1 June 2016 | 2016-06 Draft Written Examination |
ML12065A172 | 1 March 2012 | B 3.1 Reactivity Control Systems, B 3.1.6 Control Bank Insertion Limits, Bases, Background |
ML12065A171 | 1 March 2012 | B 3.1 Reactivity Control Systems, B 3.1.5 Shutdown Bank Insertion Limits, Bases, Background |
ML12065A170 | 1 March 2012 | B 3.1 Reactivity Control Systems, B 3.1.1 Shutdown Margin (SDM) |
ULNRC-05725, Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (LDCN 10-0020) | 5 August 2010 | Application for Technical Specification Change Regarding Risk-Informed Justification for the Relocation of Specific Surveillance Frequency Requirements to a Licensee Controlled Program (LDCN 10-0020) |
ULNRC-05633, Revision of Technical Specification 3.3.9 | 1 June 2009 | Revision of Technical Specification 3.3.9 |
ML070400168 | 8 March 2007 | Issuance of License Amendment No. 181 Regarding Unborated Water Source Isolation Valves |
ULNRC-05297, Proposed Revision to Technical Specifications for Use of Beacon Power Distribution Monitoring System | 25 May 2006 | Proposed Revision to Technical Specifications for Use of Beacon Power Distribution Monitoring System |
ULNRC-05269, Proposed Revision to Technical Specification 3.9.2 Unborated Water Source Isolation Valves and Associated Revisions to Technical Specification 3.3.9 Boron Dilution Mitigation System (Bdms) (License Amendment Request OL 1238) | 28 March 2006 | Proposed Revision to Technical Specification 3.9.2 Unborated Water Source Isolation Valves and Associated Revisions to Technical Specification 3.3.9 Boron Dilution Mitigation System (Bdms) (License Amendment Request OL 1238) |
ULNRC-05101, Union Electric Co. Technical Specification Bases Revision 5 | 10 December 2004 | Union Electric Co. Technical Specification Bases Revision 5 |
ULNRC-04883, Proposed Revision to Technical Specification (TS) 3.9.2, Unborated Water Source Isolation Valves, to Revise & Rename Specification 3.9.2, Dilution Source Isolation Valves & Associated Revision to TS 3.3.9, Boron Dilution... | 15 December 2003 | Proposed Revision to Technical Specification (TS) 3.9.2, Unborated Water Source Isolation Valves, to Revise & Rename Specification 3.9.2, Dilution Source Isolation Valves & Associated Revision to TS 3.3.9, Boron Dilution... |
ML033230225 | 12 November 2003 | Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application. |
ULNRC-04721, Technical Specification Bases Revision 3 | 30 August 2002 | Technical Specification Bases Revision 3 |
ML20195C519 | 28 May 1999 | Proposed Tech Specs Sections 3.9.1,revised to Maintain CTS Requirements on Refueling Pool Boron Concentration Limits & 5.6.5,revised to Delete Item 5.6.5.a |
ML20207F480 | 27 May 1999 | Proposed Improved TSs & ITS Bases |
ML20236Y172 | 4 August 1998 | Proposed Tech Specs Re Conversion to Improved STS Sections 3.1,3.2,3.5,3.9 & 4.0 |