Semantic search
Jump to navigation
Jump to search
Issue date | Site | Title | |
---|---|---|---|
ML23303A221 | 31 October 2023 | NUREG/BR-0096, Revision. 2, Instructions and Guidance for Completing Physical Inventory Summary Reports - NRC Form 327 Final Report | |
ML23068A156 | 24 January 2023 | Enclosure - Framatome Questions - 1-2023 | |
ML23068A155 | 24 January 2023 | E-Mail - Framatome Possession Limit Question | |
NUREG-2159, Revision 1, Final, Acceptable Standard Format and Content for the Fundamental Nuclear Material Control Plan Required for Special Nuclear Material of Moderate Strategic Significance | 29 July 2022 | NUREG-2159, Revision 1, Final, Acceptable Standard Format and Content for the Fundamental Nuclear Material Control Plan Required for Special Nuclear Material of Moderate Strategic Significance | |
ML14181B213 | 30 September 2016 | Draft Regulatory Guide DG-5051, Shipping, Receiving, and Internal Transfer of Special Nuclear Material at Fuel Cycle Facilities | |
ML14310A339 | 3 September 2015 | Draft Regulatory Guide DG-5049, Independent Assessment of Nuclear Material Control and Accounting Systems | |
ML14310A338 | 3 September 2015 | Regulatory Analysis for DG-5049 | |
ML15056A518 | 25 February 2015 | Material Control and Accounting Regulatory Guides |