Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
LIC-22-0002, Independent Spent Fuel Storage Installation, DSAR Figures Section-12 - Part 4 of 410 March 2022Independent Spent Fuel Storage Installation, DSAR Figures Section-12 - Part 4 of 4
ML22081A04310 March 2022Independent Spent Fuel Storage Installation, DSAR Figures Section-02 - Part 3 of 4
ML22081A04210 March 2022Independent Spent Fuel Storage Installation, DSAR Figures Section-01 - Part 2 of 4
ML22081A04110 March 2022Independent Spent Fuel Storage Installation, DSAR, Part 1 of 4Offsite Dose Calculation Manual
Tornado Missile
Operating Basis Earthquake
Tornado Generated Missile
Design basis earthquake
Process Control Program
Exemption Request
Earthquake
Accidental discharge
Fire Protection Program
ML22081A04010 March 2022Independent Spent Fuel Storage Installation, 10 CFR 50.59 Report, Quality Assurance Program Changes, Technical Specification Basis Changes, 10 CFR 71.106 Quality Assurance Program Approval, Aging Management ReviewOffsite Dose Calculation Manual
Aging Management
Design basis earthquake
Process Control Program
License Renewal
Fire Protection Program
LIC-14-0077, CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (Usar)Revision17 June 2014CFR 50.59 Report, Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (Usar)RevisionSafe Shutdown
Boric Acid
Time of Discovery
Shutdown Margin
Anticipated operational occurrence
Tornado Missile
Hydrostatic
Temporary Modification
Tornado-Generated Missile
Aging Management
Tornado Missile Protection
Operability Determination
Earthquake
Fuel cladding
GOTHIC
Overspeed trip
LIC-14-0043, Enclosure, Attachment 1 to LIC-14-0043 - Updated Safety Analysis Report (USAR) Page Markups16 May 2014Enclosure, Attachment 1 to LIC-14-0043 - Updated Safety Analysis Report (USAR) Page MarkupsEarthquake
ML14143A37216 May 2014Enclosure, Attachment 2 to LIC-14-0043 - Updated Safety Analysis Report (USAR) Clean Pages
ML12226A17118 June 2012Quality Assurance (QA) Program Changes, Technical Specification Basis Changes, and Updated Safety Analysis Report (USAR) RevisionSafe Shutdown
Boric Acid
Shutdown Margin
Loop seal
Temporary Modification
B.5.b
Aging Management
License Renewal
Fuel cladding
Offsite Circuit
Fire Protection Program
LIC-12-0076, Updated Safety Analysis Report (USAR) Revision for Fort Calhoun Station, Unit 1 - USAR-9.6, Auxiliary Systems - Spent Fuel Pool Cooling System23 February 2012Updated Safety Analysis Report (USAR) Revision for Fort Calhoun Station, Unit 1 - USAR-9.6, Auxiliary Systems - Spent Fuel Pool Cooling System
LIC-05-0001, License Amendment Request, Updated Safety Analysis Report Clarification of Operator Action During Loss of Main Feedwater Event.1 July 2005License Amendment Request, Updated Safety Analysis Report Clarification of Operator Action During Loss of Main Feedwater Event.Fuel cladding