Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21027A22827 January 2021License Amendment Request for One-time Deferral of Steam Generator InspectionsNon-Destructive Examination
Nondestructive Examination
Pandemic
Coronavirus
COVID-19
Downpower
ML20302A37728 October 2020WCAP-18558-NP, Analysis of Capsule Y from the Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. Part 1 of 4
ML20302A38028 October 2020WCAP-18558-NP, Analysis of Capsule Y from the Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. Part 2 of 4
ML20302A38128 October 2020WCAP-18558-NP, Analysis of Capsule Y from the Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. Part 3 of 4
L-20-208, WCAP-18558-NP, Analysis of Capsule Y from the Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. Part 4 of 428 October 2020WCAP-18558-NP, Analysis of Capsule Y from the Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. Part 4 of 4
L-18-030, WCAP-18102-NP, Rev 1, Beaver Valley Unit 1 Heatup and Cooldown Limit Curves for Normal Operation.28 February 2018WCAP-18102-NP, Rev 1, Beaver Valley Unit 1 Heatup and Cooldown Limit Curves for Normal Operation.Hydrostatic
Pressure and Temperature Limits Report
L-17-292, Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule6 October 2017Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal ScheduleHydrostatic
Pressure and Temperature Limits Report
ML08290020931 August 2008WCAP-16158-NP, Revision 0, Technical Basis for Repair Options for Reactor Vessel Head Penetration Nozzles and Attachment Welds: Beaver Valley Unit 2Hydrostatic
Operating Basis Earthquake
Finite Element Analysis
Design basis earthquake
ML07211031931 July 2007WCAP-16518-NP, Rev. 2, Beaver Valley, Unit 2, Spent Fuel Pool Criticality Analysis
ML06170010731 May 2006Rev. 1 to WCAP-16518-NP, Beaver Valley Unit 2 Spent Fuel Pool Criticality Analysis.
ML06102040631 March 2006WCAP-16527-NP, Rev. 0, Analysis of Capsule X from Firstenergy Nuclear Operating Company Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program.
ML05104008431 March 2005WCAP-16385-NP, Rev 1, F* Tube Plugging Criterion for Tubes with Degradation in the Tubesheet Roll Expansion Region of the Beaver Valley Unit 2 Steam Generators.Time of Discovery
Non-Destructive Examination
Finite Element Analysis
L-04-125, Extended Power Uprate Licensing Report, Supplemental Information30 September 2004Extended Power Uprate Licensing Report, Supplemental InformationSafe Shutdown
Boric Acid
Hydrostatic
Earthquake
Fuel cladding
Flow Induced Vibration
ML04239021420 August 2004Westinghouse Owners Group Request to Withdraw WCAP-16168-NP, Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval, (PA-MSC-0120)
ML03365040031 December 2003to WCAP-16144-NP, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: Beaver Valley, Unit 2.Non-Destructive Examination
Nondestructive Examination
ML03323022512 November 2003Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application.Anticipated operational occurrence
Probabilistic Risk Assessment
Fuel cladding
Coast down
ML04030070231 August 2003to WCAP-15919-NP, Steam Generator Tube Repair for Westinghouse Designed Plants with 7/8 Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves.Safe Shutdown Earthquake
Hydrostatic
Nondestructive Examination
Earthquake
Power change
L-03-064, Supplemental Information Supporting Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations4 April 2003Supplemental Information Supporting Proposed Alternative Repair Methods for Reactor Vessel Head PenetrationsBoric Acid
Weld Overlay
Aging Management
Liquid penetrant
L-04-089, Generic W* Tube Plugging Criteria for 51 Series Steam Generator Tubesheet Region Wextex Expansions.31 March 2003Generic W* Tube Plugging Criteria for 51 Series Steam Generator Tubesheet Region Wextex Expansions.
ML18312A15130 November 1996WCAP-14535A, Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination.Safe Shutdown
Non-Destructive Examination
Safe Shutdown Earthquake
Nondestructive Examination
Finite Element Analysis
Liquid penetrant
Scaffolding