Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML21027A228 | 27 January 2021 | License Amendment Request for One-time Deferral of Steam Generator Inspections | Non-Destructive Examination Nondestructive Examination Pandemic Coronavirus COVID-19 Downpower |
ML20302A377 | 28 October 2020 | WCAP-18558-NP, Analysis of Capsule Y from the Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. Part 1 of 4 | |
ML20302A380 | 28 October 2020 | WCAP-18558-NP, Analysis of Capsule Y from the Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. Part 2 of 4 | |
ML20302A381 | 28 October 2020 | WCAP-18558-NP, Analysis of Capsule Y from the Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. Part 3 of 4 | |
L-20-208, WCAP-18558-NP, Analysis of Capsule Y from the Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. Part 4 of 4 | 28 October 2020 | WCAP-18558-NP, Analysis of Capsule Y from the Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. Part 4 of 4 | |
L-18-030, WCAP-18102-NP, Rev 1, Beaver Valley Unit 1 Heatup and Cooldown Limit Curves for Normal Operation. | 28 February 2018 | WCAP-18102-NP, Rev 1, Beaver Valley Unit 1 Heatup and Cooldown Limit Curves for Normal Operation. | Hydrostatic Pressure and Temperature Limits Report |
L-17-292, Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule | 6 October 2017 | Modified Rt PTS Values and Reactor Vessel Surveillance Capsule Withdrawal Schedule | Hydrostatic Pressure and Temperature Limits Report |
ML082900209 | 31 August 2008 | WCAP-16158-NP, Revision 0, Technical Basis for Repair Options for Reactor Vessel Head Penetration Nozzles and Attachment Welds: Beaver Valley Unit 2 | Hydrostatic Operating Basis Earthquake Finite Element Analysis Design basis earthquake |
ML072110319 | 31 July 2007 | WCAP-16518-NP, Rev. 2, Beaver Valley, Unit 2, Spent Fuel Pool Criticality Analysis | |
ML061700107 | 31 May 2006 | Rev. 1 to WCAP-16518-NP, Beaver Valley Unit 2 Spent Fuel Pool Criticality Analysis. | |
ML061020406 | 31 March 2006 | WCAP-16527-NP, Rev. 0, Analysis of Capsule X from Firstenergy Nuclear Operating Company Beaver Valley Unit 2 Reactor Vessel Radiation Surveillance Program. | |
ML051040084 | 31 March 2005 | WCAP-16385-NP, Rev 1, F* Tube Plugging Criterion for Tubes with Degradation in the Tubesheet Roll Expansion Region of the Beaver Valley Unit 2 Steam Generators. | Time of Discovery Non-Destructive Examination Finite Element Analysis |
L-04-125, Extended Power Uprate Licensing Report, Supplemental Information | 30 September 2004 | Extended Power Uprate Licensing Report, Supplemental Information | Safe Shutdown Boric Acid Hydrostatic Earthquake Fuel cladding Flow Induced Vibration |
ML042390214 | 20 August 2004 | Westinghouse Owners Group Request to Withdraw WCAP-16168-NP, Risk-Informed Extension of Reactor Vessel In-Service Inspection Interval, (PA-MSC-0120) | |
ML033650400 | 31 December 2003 | to WCAP-16144-NP, Structural Integrity Evaluation of Reactor Vessel Upper Head Penetrations to Support Continued Operation: Beaver Valley, Unit 2. | Non-Destructive Examination Nondestructive Examination |
ML033230225 | 12 November 2003 | Submittal of WCAP-16084-NP, Development of Risk-Informed Safety Analysis Approach and Pilot Application. | Anticipated operational occurrence Probabilistic Risk Assessment Fuel cladding Coast down |
ML040300702 | 31 August 2003 | to WCAP-15919-NP, Steam Generator Tube Repair for Westinghouse Designed Plants with 7/8 Inconel 600 Tubes Using Leak Limiting Alloy 800 Sleeves. | Safe Shutdown Earthquake Hydrostatic Nondestructive Examination Earthquake Power change |
L-03-064, Supplemental Information Supporting Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations | 4 April 2003 | Supplemental Information Supporting Proposed Alternative Repair Methods for Reactor Vessel Head Penetrations | Boric Acid Weld Overlay Aging Management Liquid penetrant |
L-04-089, Generic W* Tube Plugging Criteria for 51 Series Steam Generator Tubesheet Region Wextex Expansions. | 31 March 2003 | Generic W* Tube Plugging Criteria for 51 Series Steam Generator Tubesheet Region Wextex Expansions. | |
ML18312A151 | 30 November 1996 | WCAP-14535A, Topical Report on Reactor Coolant Pump Flywheel Inspection Elimination. | Safe Shutdown Non-Destructive Examination Safe Shutdown Earthquake Nondestructive Examination Finite Element Analysis Liquid penetrant Scaffolding |