Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML18220A7778 August 2018Summary from Staff'S Examination of Geologic Features at Tva'S Clinch River Nuclear Site During a 30-31 January 2018 NRC Management Site Visit
CNL-18-059, Submittal of Revised Site Safety Analysis Report Subsection 2.4.2.2, Flood Design Considerations, and Subsection 2.4.3.5, Probable Maximum Flood Flow, and Figure 2.4.3-3 in Support of Early Site Permit Application for Clinch River Nuclear27 April 2018Submittal of Revised Site Safety Analysis Report Subsection 2.4.2.2, Flood Design Considerations, and Subsection 2.4.3.5, Probable Maximum Flood Flow, and Figure 2.4.3-3 in Support of Early Site Permit Application for Clinch River Nuclear S
ML19037A27030 September 2016State of Tenn General NPDES Permit for Discharges of Stormwater Associated with Construction Activities (Permit No. TNR100000)
ML18064A89418 September 2013DOE Oak Ridge Groundwater Strategy 2013
ML18318A09931 August 2003Conservation Assessment for Appalachian Bugbane
ML18054A44131 May 1995K-25 Site, Oak Ridge Reservation, Oak Ridge, Tennessee, K-25 Cultural Resources Survey; May 1995 (Redacted)Coatings
ML18064A89331 January 1985the Clinch River Breeder Reactor Plant Project Final Report Breeder Reactor Corporation
ML18054A47531 October 1974Archaeological Survey with Emphasis on Prehistoric Sites of the Oak Ridge Reservation, Oak Ridge, Tennessee; October 1974 (Redacted)