Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20211G68130 June 1999Pulstar Reactor Annual Rept to Us NRC for Jul 1998 - June 1999. with
ML20238E87330 June 1998Pulstar Reactor Annual Rept for Period Jul 1997 - June 1998Shutdown Margin
ML20198R93230 October 1997Safety Evaluation Supporting Amend 12 to License R-120
ML20210Q79430 June 1997Pulstar Reactor Annual Rept for Jul 1996 - June 1997
ML20141J93930 April 1997Safety Evaluation Report Related to the Renewal of the Operating License for the Research Reactor at North Carolina State UniversitySafe Shutdown
High winds
Shutdown Margin
Emergency Lighting
Earthquake
Fuel cladding
ML20133F85011 December 1996Ro:On 961206,PULSTAR Surveillance Program Was Deficient in prestart-up Check Since It Did Not Verify Full Operation of Scram Logic Unit as Described in Ufsar.Caused by Deficient Surveillance procedures.Re-soldered Connection
ML20148G28130 June 1996Corrections to Pulstar Facility Annual Rept Section 6.7.5.f.1 for Periods 950701-960630,940701-950630 & 930701- 940630
ML20117E88830 June 1996Pulstar Reactor Annual Report to NRC for Jul 1995 - June 1996
ML20091P47330 June 1995Pulstar Reactor Annual Rept for Period Jul 1994 - June 1995Hydrostatic
ML20072P24030 June 1994Pulstar Reactor Annual Rept for Period Jul 1993 - June 1994
ML20056G08430 June 1993Pulstar Reactor Annual Rept for Period Jul 1992 - June 1993
ML20127P82627 November 1992Offsite Dose Calculation for Noble Gases
ML20099K26930 June 1992Pulstar Annual Rept to NRC for Jul 1991-June 1992 North Carolina State Univ Nuclear Reactor Program
ML20082H81730 June 1991Pulstar Annual Rept to NRC for Jul 1990 to June 1991Power change
ML20082A39127 June 1991Ro:On 910625,reactor Operator Logged That Reactor Key Turned Off & Removed from Reactor Control Console While Key Still Turned On.Operator Suspended for 24 H & Operating Procedures Will Be Changed Re Custody of Reactor Key
ML20059D14530 June 1990Pulstar Annual Rept to NRC for Jul 1989 - June 1990
ML20246N67830 June 1989Pulstar Annual Rept to NRC for Jul 1988 - June 1989
ML20245B44530 June 1988Financial Rept for Yr Ending 880630
ML20153E16930 June 1988Pulstar Annual Rept to NRC for Jul 1987 - June 1988
ML20196G8883 March 1988Headquarters Daily Rept for 880303Half scram
Systematic Assessment of Licensee Performance
Liquid penetrant
ML20237H38530 June 1987Annual Rept for Jul 1986 - June 1987
ML20215K35220 August 1986Ro:On 860813,console Key Left in Keyswitch & in on Position.Caused by Personnel Error.Reactor Operator & Duty Senior Operator Suspended from Licensed Duties for 1 Wk
ML20214L48930 June 1986Pulstar Annual Rept to NRC for Jul 1985 - June 1986
ML20134L74630 June 1985Pulstar Annual Rept to NRC for Period Jul 1984 - June 1985
ML20096C83130 June 1984Pulstar Annual Rept to NRC for Jul 1983 - June 1984
ML20063J46127 August 1982Pulstar Annual Rept to Nrc,Jul 1981-June 1982
ML20069D76620 August 1982Errata to Pulstar Annual Rept to Usnrc,Jul 1981-June 1982, Environ Radiation Surveillance Rept for 811005-820820
ML20042C04122 March 1982Ro:On 820312,during Reactor Startup,Keyswitch Discovered in on Position.Caused by Failure of Reactor Operator to Follow Established Shutdown Procedure.Operator Interviewed & Guidance Issued for Performing Reactor Checklists
ML20041E18430 September 1981to QA Program for Shipping Radioactive Matl
ML20004D8801 June 1981Ro:On 810527,during Preoperational Checkout,Polarizing High Voltage Was Removed from Safety Channel Compensated Ion Chamber Neutron Detector.Caused by Operator Inadvertently Reducing High Voltage Power Supply Output to Zero
ML19344E60727 August 1980Annual Rept,Jul 1979 to Jul 1980.
ML19310A40415 March 1980Dismantling Plan for Facility
ML19275A56111 September 1979QA Plan for Shipment of R-3 Fuel.
ML19254A78530 June 1979Pulstar Annual Rept, 780701-790630Shutdown Margin