Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20212D292 | 28 February 1999 | Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at Callaway Plant | Hot Short Safe Shutdown High winds Ultimate heat sink Fire Barrier Safe Shutdown Earthquake Probabilistic Risk Assessment Operating Basis Earthquake Seismically rugged Severe Accident Management Guideline Earthquake |
ML20117J300 | 15 January 1996 | Technical Evaluation Rept on IPE Submittal Human Reliability Analysis, Final Rept | Internal Flooding |
ML20117J296 | 31 December 1995 | Technical Evaluation Rept on IPE Back End Analysis | Ultimate heat sink Mission time Internal Flooding Probabilistic Risk Assessment Finite Element Analysis Weak link |
ML20117J291 | 21 December 1995 | Technical Evaluation Rept on IPE Front End Analysis | Ultimate heat sink Mission time Internal Flooding Probabilistic Risk Assessment |
ML20069M285 | 28 February 1994 | Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Callaway | |
ML20082M616 | 31 August 1991 | Auxiliary Feedwater System RISK-BASED Inspection Guide for the Callaway Nuclear Power Plant | Probabilistic Risk Assessment |
ML20094D101 | 30 August 1991 | Final Technical Evaluation Rept for Callaway Plant Station Blackout Evaluation | Safe Shutdown Battery sizing |
ML20070Q772 | 31 December 1988 | Nuclear Power Plant Sys Sourcebook,Callaway | Safe Shutdown Boric Acid Ultimate heat sink Tornado Missile Emergency Lighting Power-Operated Valves |
ML20214R283 | 31 March 1987 | Conformance to Generic Ltr 83-28,Item 2.2.1, 'Vendor Interface Programs (All Other Safety-Related Components),' Callaway Plant,Unit 1, Informal Rept | |
ML20214R125 | 28 February 1987 | Conformace to Generic Ltr 83-28,Item 2.2.2,Vendor Interface Programs (All Other Safety-Related Components),Callaway Plant, Informal Rept | |
ML20204J664 | 28 February 1987 | Conformance to Generic Ltr 83-28,Item 2.2.1, `Equipment Classification (All Other Safety-Related Components),' Callaway Plant Unit 1, Technical Evaluation Rept | |
ML20206B020 | 28 February 1987 | Conformance to Generic Ltr 83-28,Item 2.2.2,Vendor Interface Programs (All Other Safety-Related Components), Callaway Plant, Technical Evaluation Rept | |
ML17334B033 | 30 November 1986 | Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28. | |
ML20211E964 | 31 October 1986 | Rev 3 to Conformance to Generic Ltr 83-28,Item 3.1.3 & 3.2.3,Braidwood Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Indian Point Unit 3,Trojan Nuclear Plant & Wolf Creek Generating Station | |
ML20138K984 | 30 September 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Byron Station Unit 1,Callaway Plant Unit 1,Indian Point Unit 3,Trojan Nuclear Plant & Wolf Creek Generating Station | |
ML20115A467 | 31 January 1985 | Conformance to Reg Guide 1.97,Callaway Plant,Unit 1 | Safe Shutdown |
ML20091Q480 | 31 May 1984 | Conformance to Reg Guide 1.97,Callaway Plant,Unit 1 | |
ML20112J489 | 31 July 1983 | Audit of Environ Qualification of Safety-Related Electrical Equipment for Snupps | Anchor Darling |
ML20054F284 | 30 April 1982 | Control of Heavy Loads at Nuclear Power Plants, Draft Technical Evaluation Rept | Safe Shutdown Boric Acid Control of Heavy Loads |
ML20041C277 | 31 January 1982 | Snupps Auxiliary Feedwater System Reliability Study Evaluation |