Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20212D29228 February 1999Technical Evaluation Rept on 'Submittal-Only' Review of IPEEE at Callaway PlantHot Short
Safe Shutdown
High winds
Ultimate heat sink
Fire Barrier
Safe Shutdown Earthquake
Probabilistic Risk Assessment
Operating Basis Earthquake
Seismically rugged
Severe Accident Management Guideline
Earthquake
ML20117J30015 January 1996Technical Evaluation Rept on IPE Submittal Human Reliability Analysis, Final ReptInternal Flooding
ML20117J29631 December 1995Technical Evaluation Rept on IPE Back End AnalysisUltimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
Finite Element Analysis
Weak link
ML20117J29121 December 1995Technical Evaluation Rept on IPE Front End AnalysisUltimate heat sink
Mission time
Internal Flooding
Probabilistic Risk Assessment
ML20069M28528 February 1994Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Callaway
ML20082M61631 August 1991Auxiliary Feedwater System RISK-BASED Inspection Guide for the Callaway Nuclear Power PlantProbabilistic Risk Assessment
ML20094D10130 August 1991Final Technical Evaluation Rept for Callaway Plant Station Blackout EvaluationSafe Shutdown
Battery sizing
ML20070Q77231 December 1988Nuclear Power Plant Sys Sourcebook,CallawaySafe Shutdown
Boric Acid
Ultimate heat sink
Tornado Missile
Emergency Lighting
Power-Operated Valves
ML20214R28331 March 1987Conformance to Generic Ltr 83-28,Item 2.2.1, 'Vendor Interface Programs (All Other Safety-Related Components),' Callaway Plant,Unit 1, Informal Rept
ML20214R12528 February 1987Conformace to Generic Ltr 83-28,Item 2.2.2,Vendor Interface Programs (All Other Safety-Related Components),Callaway Plant, Informal Rept
ML20204J66428 February 1987Conformance to Generic Ltr 83-28,Item 2.2.1, `Equipment Classification (All Other Safety-Related Components),' Callaway Plant Unit 1, Technical Evaluation Rept
ML20206B02028 February 1987Conformance to Generic Ltr 83-28,Item 2.2.2,Vendor Interface Programs (All Other Safety-Related Components), Callaway Plant, Technical Evaluation Rept
ML17334B03330 November 1986Input for Ser,Beaver Valley Power Station Units 1 & 2, Braidwood Station Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Catawba Nuclear Station Units 1..., Reactor Trip Sys Reliability Item 4.5.2 Generic Ltr 83-28.
ML20211E96431 October 1986Rev 3 to Conformance to Generic Ltr 83-28,Item 3.1.3 & 3.2.3,Braidwood Units 1 & 2,Byron Station Units 1 & 2, Callaway Plant Unit 1,Indian Point Unit 3,Trojan Nuclear Plant & Wolf Creek Generating Station
ML20138K98430 September 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3, Byron Station Unit 1,Callaway Plant Unit 1,Indian Point Unit 3,Trojan Nuclear Plant & Wolf Creek Generating Station
ML20115A46731 January 1985Conformance to Reg Guide 1.97,Callaway Plant,Unit 1Safe Shutdown
ML20091Q48031 May 1984Conformance to Reg Guide 1.97,Callaway Plant,Unit 1
ML20112J48931 July 1983Audit of Environ Qualification of Safety-Related Electrical Equipment for SnuppsAnchor Darling
ML20054F28430 April 1982Control of Heavy Loads at Nuclear Power Plants, Draft Technical Evaluation ReptSafe Shutdown
Boric Acid
Control of Heavy Loads
ML20041C27731 January 1982Snupps Auxiliary Feedwater System Reliability Study Evaluation