Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20134D51511 October 1996Technical Evaluation Report of IPE Submittal & RAI Responses for PlantBoric Acid
High Radiation Area
Ultimate heat sink
Mission time
Internal Flooding
Hydrostatic
Squib
Severe Accident Management Guideline
ML20059L22430 June 1993Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Big Rock Point, Technical Evaluation Rept
ML20059M28127 September 1990Notification of Contract Execution: NDE Support at Big Rock Nuclear Power Plant, Awarded to Tet,Inc
ML20154B61630 April 1988Technical Evaluation Rept for Evaluation of Updated Offsite Dose Calculation Manual (Updated Through 870827), Big Rock PlantGrab sample
Offsite Dose Calculation Manual
ML20235M57430 June 1987Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Big Rock Point, Informal Rept
ML20202J5647 April 1986In-Progress Audit of Dcrdr for Big Rock Point Nuclear Power Plant
ML20136G65618 November 1985Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Big Rock Point Nuclear Plant, Technical Evaluation Rept
ML20138M27731 October 1985Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Big Rock Point Plant
ML20215M56831 October 1985Rev 1 to Ser,Pump & Valve Inservice Testing Program,Big Rock Point Plant, Informal ReptHigh Radiation Area
Power-Operated Valves
ML20132C97723 April 1985Radiological Effluent Tech Spec Implementation (A-2) Big Rock Point Plant, Technical Evaluation ReptOffsite Dose Calculation Manual
Annual Radiological Environmental Operating Report
Process Control Program
ML20151K3957 August 1984Technical Evaluation Rept,2nd Interval Inservice Insp Program,Big Rock Point Nuclear Power PlantSafe Shutdown
High Radiation Area
Hydrostatic
Nondestructive Examination
Dissimilar Metal Weld
Scaffolding
ML20197H76421 June 1984Review of Wind & Tornado Loading Responses,Tornado Wind Load Analysis of Concrete Chimney,Turbine Bldg Passageway, Control Room/Svc Bldg Complex & Turbine Bldg,Big Rock Point Plant, Technical Evaluation Rept
ML20126E9947 December 1982Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982
ML20062K07331 July 1982Sep,Topic V-II.A,Electrical,Instrumentation & Control Features for Isolation of High & Low Pressure Sys,Big Rock Point Nuclear Station
ML20054M71430 June 1982Adequacy of Station Electric Distribution Sys Voltages Big Rock Point Plant, Informal Rept
ML20054M24230 June 1982Adequacy of Station Electric Distribution Sys Voltages,Big Rock Point Plant, Informal Rept
ML20054M0703 June 1982Control of Heavy Loads (C-10) Cpc,Big Rock Point Nuclear Plant, Draft Technical Evaluation ReptControl of Heavy Loads
ML20058A73031 May 1982SEP Topic VIII-2,Diesel Generator,Big Rock Point, Interim Rept for May 1982
ML20054K04731 May 1982SEP Topic VIII-2,Diesel Generator,Big Rock Point, Informal Rept