Issue date | Title | Topic | |
---|---|---|---|
ML20134D515 | 11 October 1996 | Technical Evaluation Report of IPE Submittal & RAI Responses for Plant | Boric Acid High Radiation Area Ultimate heat sink Mission time Internal Flooding Hydrostatic Squib Severe Accident Management Guideline |
ML20059L224 | 30 June 1993 | Evaluation of Util Response to Suppl 1 to NRC Bulletin 90-01:Big Rock Point, Technical Evaluation Rept | |
ML20059M281 | 27 September 1990 | Notification of Contract Execution: NDE Support at Big Rock Nuclear Power Plant, Awarded to Tet,Inc | |
ML20154B616 | 30 April 1988 | Technical Evaluation Rept for Evaluation of Updated Offsite Dose Calculation Manual (Updated Through 870827), Big Rock Plant | Grab sample Offsite Dose Calculation Manual |
ML20235M574 | 30 June 1987 | Final Conformance to Generic Ltr 83-28,Item 2.2.1 - Equipment Classification for All Other Safety-Related Components:Big Rock Point, Informal Rept | |
ML20202J564 | 7 April 1986 | In-Progress Audit of Dcrdr for Big Rock Point Nuclear Power Plant | |
ML20136G656 | 18 November 1985 | Draft Review of Licensee & Applicant Responses to Generic Ltr 83-28,Item 1.2, 'Post-Trip Review:Data & Info Capabilities,' for Big Rock Point Nuclear Plant, Technical Evaluation Rept | |
ML20138M277 | 31 October 1985 | Conformance to Generic Ltr 83-28,Items 3.1.3 & 3.2.3,Big Rock Point Plant | |
ML20215M568 | 31 October 1985 | Rev 1 to Ser,Pump & Valve Inservice Testing Program,Big Rock Point Plant, Informal Rept | High Radiation Area Power-Operated Valves |
ML20132C977 | 23 April 1985 | Radiological Effluent Tech Spec Implementation (A-2) Big Rock Point Plant, Technical Evaluation Rept | Offsite Dose Calculation Manual Annual Radiological Environmental Operating Report Process Control Program |
ML20151K395 | 7 August 1984 | Technical Evaluation Rept,2nd Interval Inservice Insp Program,Big Rock Point Nuclear Power Plant | Safe Shutdown High Radiation Area Hydrostatic Nondestructive Examination Dissimilar Metal Weld Scaffolding |
ML20197H764 | 21 June 1984 | Review of Wind & Tornado Loading Responses,Tornado Wind Load Analysis of Concrete Chimney,Turbine Bldg Passageway, Control Room/Svc Bldg Complex & Turbine Bldg,Big Rock Point Plant, Technical Evaluation Rept | |
ML20126E994 | 7 December 1982 | Containment Leak Rate Testing Investigations, Monthly Progress Rept for Nov 1982 | |
ML20062K073 | 31 July 1982 | Sep,Topic V-II.A,Electrical,Instrumentation & Control Features for Isolation of High & Low Pressure Sys,Big Rock Point Nuclear Station | |
ML20054M714 | 30 June 1982 | Adequacy of Station Electric Distribution Sys Voltages Big Rock Point Plant, Informal Rept | |
ML20054M242 | 30 June 1982 | Adequacy of Station Electric Distribution Sys Voltages,Big Rock Point Plant, Informal Rept | |
ML20054M070 | 3 June 1982 | Control of Heavy Loads (C-10) Cpc,Big Rock Point Nuclear Plant, Draft Technical Evaluation Rept | Control of Heavy Loads |
ML20058A730 | 31 May 1982 | SEP Topic VIII-2,Diesel Generator,Big Rock Point, Interim Rept for May 1982 | |
ML20054K047 | 31 May 1982 | SEP Topic VIII-2,Diesel Generator,Big Rock Point, Informal Rept |