Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
RC-96-0229, Startup Report for VC Summer Nuclear Station Power Uprate | 23 September 1996 | Startup Report for VC Summer Nuclear Station Power Uprate | Feedwater Heater Power Uprate |
ML20046A220 | 31 March 1993 | VC Summer Nuclear Generating Station Unit 1 Third Periodic Reactor Containment Bldg Integrated Leakage Rate Test. W/930722 Ltr | |
ML20247F777 | 30 September 1988 | VC Summer Nuclear Station Unit 1 Second Periodic Reactor Containment Bldg Integrated Leakage Rate Test, Final Rept | Integrated leak rate test |
ML20101U376 | 31 October 1984 | Primary Reactor Containment Integrated Leakage Rate Test, Final Rept | Integrated leak rate test |
ML20090G696 | 16 July 1984 | Natural Circulation Demonstration Comparison Between VC Summer Station & South Carolina Electric & Gas Training Simulator | |
ML20054F362 | 11 June 1982 | Integrated Leak Rate Test Summary Technical Rept | Integrated leak rate test |
ML20054L317 | 21 May 1982 | First Tendon Surveillance, Preliminary Rept | |
ML20050C376 | 25 March 1982 | Sneak Circuit Analysis of ESF Loading Sequence Control Panel,June-Nov 1981. | |
ML20049H768 | 23 February 1982 | Integrated Leak Rate Test Data Sheets for Penetrations 107, Tube Blank flange,327 Reactor Bldg Spray Pump a Recirculation Sump suction,201,211,212 & 216 Leak Rate Pressurization sys,324 & 417D | Integrated leak rate test |
ML20003D502 | 18 March 1981 | Reactor Containment Bldg Structural Acceptance Test. | |
ML20126J809 | 24 October 1980 | of DG-A Crankcase Vacuum Leak Test | |
ML20126J813 | 4 October 1980 | Final Hydro Rept, Hydrostatic & Pneumatic Test. Related Info Encl | Stroke time Hydrostatic |
ML20039F796 | 8 May 1980 | Seismic Simulation Test Program on Six Model W-1251 Meters. | |
ML20136B612 | 4 September 1979 | Qualification Test Oscillographs & Starting & Load Acceptance Reliability Test Rept for Diesel Generators for 710806-10 |