Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20199B073 | 31 May 1986 | Safety Evaluation Report Related to the Design Approval of the Gessar II BWR/6 Nuclear Island Design.Docket No. 50-447. (General Electric Company) | Internal Flooding Probabilistic Risk Assessment Earthquake Backfit |
ML20132F713 | 31 July 1985 | Safety Evaluation Report Related to Final Design Approval of the Gessar II BWR/6 Nuclear Island Design.Docket No. 50-447.(General Electric Company) | Safe Shutdown Reactor Vessel Water Level High Radiation Area Ultimate heat sink Anticipated operational occurrence Safe Shutdown Earthquake Internal Flooding Probabilistic Risk Assessment Coatings Incorporated by reference Scram Discharge Volume Earthquake Fuel cladding Fatality |
ML20210J600 | 30 June 1977 | Safety Evaluation Report Related to the Preliminary Design of the GESSAR-238 Nuclear Island Standard Design.Docket No. 50-447.(General Electric Company) | |
ML20210J605 | 30 September 1976 | Safety Evaluation Report Related to the Preliminary Design of the GESSAR-238 Nuclear Island Standard Design.Docket No. 50-447.(General Electric Company) | Safe Shutdown Loop seal Tornado Missile Safe Shutdown Earthquake Operating Basis Earthquake Abnormal operational transient Minimum Critical Power Ratio Scram Discharge Volume Earthquake Fuel cladding |