Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML21246A26418 May 2021Triga Pipe Filled Cyl Surface External Dose Case Summary of Case 1
ML21246A2655 May 2021Triga Sr-90/Cs-137 Ratio Tables
ML21246A2584 May 2021Resrad Triga Buried Pipe Surface Soil - Scenario 2 New Sr-90 Ratio
ML21246A26825 February 2021Attachment L Page 1 Su 1 and Su 12 Volumetric Sample Results
ML21246A2563 February 2021GA-12-CONC-33-2 - General Atomics Spectrum Analysis Report
ML21246A26623 September 2020Triga Buried Pipe Surface Soil - Scenario 2 Final 9-23-20
ML21246A26323 September 2020Triga Final Buried Pipe Scenario 1
ML21246A25923 September 2020Case Summary of Scenario 3 Worker External Exposure
ML20161A1898 June 2020General Atomics 050-00163, Soil Sample Results 2020
ML20049A0395 February 2020Submittal of General Atomics Triga Reactor Facility Final Status Survey Plan (Fssp), Revision 2, Dated February 5, 2020
ML21246A26012 December 2019Ta 11 Client Soil Sample Results
ML21246A26726 November 20195339-SR-01-0 Independent Confirmatory Survey Summary and Results for the General Atomics Triga Reactor Facility Building G21 and Associated Land Area, San Diego, California
ML19337D38226 November 2019General Atomics Confirmatory Survey Report from Orau
ML21246A2614 November 2019Ta Client Pipe Scale Results
ML21246A27225 October 2019Ga Gamma Spectrum Analysis Outside Pipe Scale Report
ML19266A50917 September 2019General Atomics Triga Reactor Facility Final Status Survey Plan, Revision 1
ML21246A25319 August 2019Ga Gamma Spectrum Analysis Pipe Inner Scale Report
ML19247C5492 August 2019Orise Confirmatory Survey Plan - General Atomics Triga Reactor Facility
ML15317A34015 October 2015Oak Ridge Associated Universities (Orau), Letter Report for Analytical Results for Six (Four Concrete, One Metal, and One Soil) Samples Associated with General Atomics in San Diego, CA