Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20175A800 | 29 June 2020 | Rev 2 Public Meeting on 29 June - Final | |
ML20175A799 | 23 June 2020 | Rev 2 (Draft Watermark for 6-29 Public Meeting) | Incorporated by reference |
ML16354B421 | 12 December 2016 | NEI 12-06, Rev 4, Diverse and Flexible Coping Strategies (Flex) Implementation Guide. | Safe Shutdown Boric Acid High winds Ultimate heat sink Tornado Missile Safe Shutdown Earthquake Internal Flooding Hydrostatic Probabilistic Risk Assessment Operator Manual Action Emergency Lighting Incorporated by reference FLEX B.5.b Fukushima Dai-Ichi Job Performance Measure Tornado Missile Protection Design basis earthquake Large early release frequency Spent Fuel Pool Instrumentation Severe Accident Management Guideline Frazil ice Earthquake Power Operated Valves GOTHIC |
ML16061A171 | 22 February 2016 | 02-22-16 - NRC - Industry Comments on DG-1324 (Docket Id NRC-2015-0278) - Attachment | |
ML15217A492 | 27 July 2015 | NEI Regulatory Evaluation Summary: Reporting of Unplanned Contamination Events | |
ML15217A490 | 27 July 2015 | NEI Regulatory Evaluation Summary: Reporting of Medical Treatment of Contaminated Individual | |
ML14226A837 | 20 June 2014 | Industry'S Draft Propostal to Revise Regulatory Guide 8.38 - Attachment | High Radiation Area Locked High Radiation Area Deep Dose Equivalent |
ML13354B997 | 19 December 2013 | G20130895/LTR-13-0958 - Anthony Pietrangelo, Nuclear Energy Institute Ltr Industry Support and Use of Probabilistic Risk Assessments and Risk-Informed Regulation | Hot Short High winds Internal Flooding Probabilistic Risk Assessment Fukushima Dai-Ichi Significance Determination Process Large early release frequency Risk-Informed Steering Committee Backfit |
ML100130911 | 13 January 2010 | NEI Handout for Public Meeting with NEI on NEI Technical Report NEI 06-14 | |
ML091490692 | 12 May 2009 | Industry Comments on DG-1204, Guidance for ITAAC Closure | |
ML083110485 | 16 October 2008 | Draft Rg 1.189 Chapter 5 and Glossary | Hot Short Safe Shutdown Fire Barrier Coatings Operator Manual Action Fire Protection Program |
ML082490449 | 31 July 2008 | NEI 08-05, Rev. 0, Industry Initiative on Control of Heavy Loads. | Safe Shutdown Safe Shutdown Earthquake Enforcement Discretion Finite Element Analysis Overtravel Earthquake Control of Heavy Loads |
ML081130270 | 15 April 2008 | 4/15/2008 Letter from J Riley: Rg 1.205, NEI Version, Changes Tracked | Safe Shutdown Enforcement Discretion Probabilistic Risk Assessment Operator Manual Action Large early release frequency Exemption Request Fire Protection Program Backfit |
ML080910363 | 28 March 2008 | Draft Industry Guideline for Reactor Vessel Head Lift Single Failure Proof Crane Equivalence | Safe Shutdown Earthquake Overtravel Earthquake Control of Heavy Loads |
ML072630671 | 20 September 2007 | 9/24/2007 Public Meeting Handout: Draft Interim Staff Guidance for Digital I&C Licensing Process Task Working Group | Commercial Grade Dedication Cyber Security |
ML071720249 | 21 June 2007 | 6/22/2007 Diversity and Defense-in-Depth Twg Public Meeting Handout: Draft Interim Guidance for Evaluation of Diversity and Defense-in-Depth in Digital Computer-Based Instrumentation and Control Systems | Anticipated operational occurrence |
ML011780532 | 28 November 1995 | NEI 10 CFR 50.54(a) Petition for Rulemaking - Response to NRC Request for Additional Information and Comment (60 Fed. Reg. 47716 - September 14, 1995) |