Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20235Z2628 July 1987Requests Addl Info from Util Re Bldg 10 Seismic Design, Including Descriptive Matl for PILAY2 Computer Code & Sketches or Drawings Showing Caisson/Slab/Wall Configurations
ML20237E00516 October 1986Forwards Final Version of Facility Limiting Condition for Operation 4.1.9 Technical Evaluation Rept for Review & Approval.Related Info Encl
ML20197A7702 May 1986Forwards Technical Assistance to Region IV (Fort St Vrain), Monthly Progress Repts for Feb & Mar 1986
ML20098H17221 August 1984Provides Replies & Comments to Util Re Tech Spec Limiting Condition for Operation 4.1.9 in Advance of 840823 Meeting W/Util in Arlington,Tx
ML20138A62419 June 1984Submits Description of Method Used to Estimate Release of Respirable Radioactive Matl & Brief Comparison of Release from LWR Fuel to That Expected from HTGR Fuel
ML20039F6715 January 1982Forwards Review of PSC of Co Proposed Inservice Insp Program. Milestones on Inservice Insp Have Been Met
ML20004F90216 June 1981Summarizes Implementation & Progress of Review of Fort St Vrain Items & Applicability to Htgrs.
ML20004F61012 May 1981Submits Monthly Repts for Tasks Initiated on 810417 Re NUREG-0737, Applicability of TMI Action Plan Requirements to Fort St Vrain & Htgrs, for Period Ending 810515
ML19257C74324 April 1979Forwards Rept to NRC on Effect of Installing Core Region Constraint Devices on Seismic Response of Plant Core.
ML19260E18924 April 1979Forwards Final, Rept to NRC on Effect of Installing Core Region Constraint Devices on Seismic Response of Facility Core. Unchanged from Draft Version.Submits Response to Structural Engineering Branch Comments
ML19289C37621 December 1978Responds to NRC 781121 Request for Aid W/Licensing Review Re Postulated Dbda & Loss of Forced Circulation Accidents. Concludes Each of the New Postulated Cases Results in Max Temp No Greater than FSAR-assumed Worst Case
ML20062G22819 December 1978Summary of 781215 Meeting of Tech Review Comm for Review of Temp Fluctuations in Subj Facil.Topics Discussed Incl Comparison of Displacement Probe & Nuc Detector Signals & Info on Core Status
ML19289C37413 December 1978Forwards Rept to NRC on the PSC Document Entitled Core Fluctuation Investigation Status & Safety Evaluation Rept. Concludes It Is Unlikely That Fluctuation Problem Is Causing Serious Structural Damage as Result of Core Motion