Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20236U47120 July 1998Ro:On 980703,weekly Checklist Was Completed.Checklist Time Interval Exceeded Time Allowed by SOP 70.No Adverse Conditions Have Appeared as Result of Being One Day Late
ML20086N1415 December 1991Special Rept:On 911123,gaseous Stack Monitor Alarm Sounded & Reactor Manually Scrammed & Trace on Monitor Did Not Indicate Unusually High Radiation Readings.Radiation Levels in Reactor Bay Measured 0.4 Mr/H.Chronology Encl
ML20116E8148 October 1990Ro:On 901007,reactor Power Increased to 150 Kw as Part of Flux Monitoring Experiment,Resulting in Anomalous Behavior of Linear Power Channel &/Or Automatic Mode of Operation.All Reactor Operations Suspended & Ga Co ContactedShutdown Margin
ML20154H02323 March 1988Ro:On 880309,discovered Possible Violation of Tech Spec Condition D.2 Re Sampling of Pool Water for Conductivity. Attempt Made to Measure Conductivity But Instrument Found to Be Nonfunctional.Instrumentation Repaired
ML20137R8006 January 1986Ro:On 851219,discovered That Last Conductivity Reading of Reactor Pool Coolant & Checking of Setpoints of Continuous Air Monitor & Radiation Area Monitor on 851122.Caused by Reactor Supervisor Inattention