MONTHYEARML20236U4711998-07-20020 July 1998 Ro:On 980703,weekly Checklist Was Completed.Checklist Time Interval Exceeded Time Allowed by SOP 70.No Adverse Conditions Have Appeared as Result of Being One Day Late ML20086N1411991-12-0505 December 1991 Special Rept:On 911123,gaseous Stack Monitor Alarm Sounded & Reactor Manually Scrammed & Trace on Monitor Did Not Indicate Unusually High Radiation Readings.Radiation Levels in Reactor Bay Measured 0.4 Mr/H.Chronology Encl ML20116E8141990-10-0808 October 1990 Ro:On 901007,reactor Power Increased to 150 Kw as Part of Flux Monitoring Experiment,Resulting in Anomalous Behavior of Linear Power Channel &/Or Automatic Mode of Operation.All Reactor Operations Suspended & Ga Co Contacted ML20154H0231988-03-23023 March 1988 Ro:On 880309,discovered Possible Violation of Tech Spec Condition D.2 Re Sampling of Pool Water for Conductivity. Attempt Made to Measure Conductivity But Instrument Found to Be Nonfunctional.Instrumentation Repaired ML20137R8001986-01-0606 January 1986 Ro:On 851219,discovered That Last Conductivity Reading of Reactor Pool Coolant & Checking of Setpoints of Continuous Air Monitor & Radiation Area Monitor on 851122.Caused by Reactor Supervisor Inattention 1998-07-20
[Table view] Category:TEXT-SAFETY REPORT
MONTHYEARML20217N8421999-08-31031 August 1999 Reed Reactor Facility Annual Rept,980901-990831. with ML20153B7781998-09-17017 September 1998 Safety Evaluation Supporting Amend 6 to License R-112 ML20153G8431998-08-31031 August 1998 Reed Reactor Facility Annual Rept,Sept 1997-Aug 1998 ML20236U4711998-07-20020 July 1998 Ro:On 980703,weekly Checklist Was Completed.Checklist Time Interval Exceeded Time Allowed by SOP 70.No Adverse Conditions Have Appeared as Result of Being One Day Late ML20211P1071997-08-31031 August 1997 Reed Reactor Facility Annual Rept from Sept 1996-Aug 1997 ML20135A0181996-08-31031 August 1996 Reed Reactor Facility Annual Rept 950901-960831 ML20079B3521994-08-30030 August 1994 Reed Reactor Facility - Annual Repts for 910901-940830. W/ ML20086N1411991-12-0505 December 1991 Special Rept:On 911123,gaseous Stack Monitor Alarm Sounded & Reactor Manually Scrammed & Trace on Monitor Did Not Indicate Unusually High Radiation Readings.Radiation Levels in Reactor Bay Measured 0.4 Mr/H.Chronology Encl ML20116E8141990-10-0808 October 1990 Ro:On 901007,reactor Power Increased to 150 Kw as Part of Flux Monitoring Experiment,Resulting in Anomalous Behavior of Linear Power Channel &/Or Automatic Mode of Operation.All Reactor Operations Suspended & Ga Co Contacted ML20106E3791990-08-31031 August 1990 Reed Reactor Facility - Annual Rept for 890901 - 900831 ML20247A5711989-07-0505 July 1989 Reed Reactor Facility Requalification Plan ML20154H0231988-03-23023 March 1988 Ro:On 880309,discovered Possible Violation of Tech Spec Condition D.2 Re Sampling of Pool Water for Conductivity. Attempt Made to Measure Conductivity But Instrument Found to Be Nonfunctional.Instrumentation Repaired ML20137R8001986-01-0606 January 1986 Ro:On 851219,discovered That Last Conductivity Reading of Reactor Pool Coolant & Checking of Setpoints of Continuous Air Monitor & Radiation Area Monitor on 851122.Caused by Reactor Supervisor Inattention 1999-08-31
[Table view] |
Text
.
REED COLLEGE q\\\ffy Ponland, Oregon 97202 4
' REACrOR FACRJrY July 20,1998 Marvin M. Mendonca -
Project Manager U.S. Nuclear Regulatory Commission Washington, D.C. 20555 L
Mr. Mendonca:
This letter is a self-report of a Technical Specification violation. ,
A weekly checklist is required by SOP 70 at Reed College's TRIGA Mark I nuclear research reactor, Docket No. 50-288. A maximum time interval of nine days is allowed between this 1 checklist. A checklist was performed on June 23,1998, and the following checklist was completed on July 3,' 1998 - a time interval of ten days. His exceeds the time allowed by SOP 70. j Subsequent weekly checklists were performed on July 8 and July 15 within the time allowed.
There are two Technical Specification requirements on the checklist that are relevant to this time interval. The primary water must be sampled weekly for conductivity, and the failsafe and alarm setpoints of the Radiation Area Monitor and the Continuous Air Monitor must be checked weekly.
Both the setpoints and conductivity were within normal limits when checked on July 3.
i He reactor was shut down during this period of time. No' adverse conditions have appeared as a result of being one day late with this checklist. Please contact me if you have any questions.
Sincerely, I
O Ste en G. Frantz {
cc: Craig Bassett l Dan Gerrity Curt Kecdy 22 i
l'
?!!b .l9 9007300183 990720 PDR ADOCK 05000298 S PM ;
i
- l. 3203 SE Woodstock Blvd., Portland, OR 972024199 Tel:(503)777-7222 Fax:(503)777-7274 reactor @ reed.edu