Semantic search
Jump to navigation
Jump to search
Start date | Status | Title | Request type | Estimated NRC review hours | Topic | |
---|---|---|---|---|---|---|
EPID:L-2023-LRM-0111 | 30 January 2024 | Open | ASME Code Case N-932 | LRM | ||
EPID:L-2023-LLA-0121 | 22 September 2023 | Open | TSTF 264 | License Amendment | ||
EPID:L-2023-LRM-0064 | 19 September 2023 | Open | LRM | |||
EPID:L-2023-LLA-0109 | 3 August 2023 | Open | License Amendment Request to Update the Technical Specification Bases to Change the Fuel Handling Accident Analysis | License Amendment | ||
EPID:L-2023-LLA-0103 | 28 July 2023 | Approved Closed | License Amendment Request to Modify Technical Specification Surveillance Requirement (SR) 3.4.3.1 Safety Relief Valves (S/Rvs) Setpoint Lower Tolerance | License Amendment | ||
EPID:L-2023-LRM-0009 | 21 February 2023 | Open | LRM | |||
EPID:L-2023-LLL-0004 | 18 January 2023 | Approved Closed | Quality Assurance Program Manual Reduction in Commitment | LLL | ||
EPID:L-2022-LLR-0083 | 30 November 2022 | Open | Constellation Energy Generation, LLC - Request to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | Relief Request | ||
EPID:L-2021-OLL-0000 | 9 September 2022 | Open | OLL | |||
EPID:L-2021-LLA-0192 | 18 October 2021 | Approved Closed | Propose Change to Eliminate Selected Response Time Testing for Reactor Protection System and Primary Containment Isolation Instrumentation | License Amendment | ||
EPID:L-2021-LRM-0103 | 5 October 2021 | Open | LRM | |||
EPID:L-2021-LLR-0057 | 12 August 2021 | Open | Proposed Relief Request Associated with Reactor Pressure Vessel Water Level Instrumentation Partial Penetration Nozzle Repairs | Relief Request | ||
EPID:L-2021-LLA-0121 | 3 August 2021 | Approved Closed | TSTF-554 | License Amendment | ||
EPID:L-2021-LRM-0069 | 13 July 2021 | Open | LRM | |||
EPID:L-2021-LLA-0169 | 30 June 2021 | Approved Closed | TSTF-541 | License Amendment | ||
EPID:L-2021-LLA-0110 | 12 June 2021 | Approved Closed | Emergency License Amendment Request, One Time Extension of Condition a to TS 3.5.1, TS 3.6.1.9, and TS 3.6.4.1 Completion Time to Support Residual Heat Removal (RHR) Pump Motor Replacement | License Amendment | ||
EPID:L-2021-LRM-0056 | 4 June 2021 | Open | LRM | |||
EPID:L-2021-LLA-0088 | 14 May 2021 | Approved Closed | TSTF-264 | License Amendment | ||
EPID:L-2021-LLA-0076 | 16 April 2021 | Approved Closed | TSTF-582 | License Amendment | ||
EPID:L-2021-LLR-0056 | 3 March 2021 | Open | ASME Code Case OMN-28 | Relief Request | ||
EPID:L-2021-LLE-0014 | 3 March 2021 | Withdrawn Closed | Exemption Request | |||
EPID:L-2020-LRM-0113 | 21 January 2021 | Open | LRM | |||
EPID:L-2021-LLR-0000 | 4 January 2021 | Open | Revised Proposed Alternative to Utilize Code Cases N-878 and N-880 for Carbon Steel Piping | Relief Request | ||
EPID:L-2020-LLR-0160 | 30 December 2020 | Open | Arkansas, Units 1 and 2; Grand Gulf, Unit 1; River Bend, Unit 1; and Waterford, Unit 3, Relief Request Number EN-20-RR-003, Proposed Alternative to Use American Society of Mechanical Engineers Code Case N-711-2, Alternative Examination Cove | Relief Request | ||
EPID:L-2020-LLR-0153 | 14 December 2020 | Open | Relief Request | |||
EPID:L-2020-LLA-0268 | 11 December 2020 | Approved Closed | TSTF-545 | License Amendment | ||
EPID:L-2020-LLA-0269 | 11 December 2020 | Approved Closed | TSTF-457 | License Amendment | ||
EPID:L-2020-LLE-0197 | 8 December 2020 | Approved Closed | Exemption Request | |||
EPID:L-2021-LLR-0153 | 1 December 2020 | Open | Proposed Alternative Concerning ASME Section XI Repair/Replacement Documentation for Replacement of Pressure Retaining Bolting | Relief Request | ||
EPID:L-2021-LLA-0142 | 24 November 2020 | Approved Closed | TSTF-505 | License Amendment | ||
EPID:L-2020-LRM-0102 | 23 October 2020 | Open | Proposed Relief Request from Section XI Repair/Replacement Documentation for Bolting Replacement of Pressure Retaining Bolting | LRM | ||
EPID:L-2020-LLR-0118 | 22 September 2020 | Open | Relief Request | |||
EPID:L-2020-LRM-0089 | 16 September 2020 | Open | Pre-Submittal Slides Extend 120-month Isi/Ist Interval Under 50.55a | LRM | ||
EPID:L-2020-LLA-0143 | 30 June 2020 | Approved Closed | TSTF-478 | License Amendment | ||
EPID:L-2020-LLA-0145 | 30 June 2020 | Approved Closed | License Amendment Request: Application to Modify Technical Specifications 3.6.1.3, Primary Containment Isolation Valves | License Amendment | ||
EPID:L-2021-LLM-0000 | 22 June 2020 | Approved Closed | Order Extending the Effectiveness of the Approval of the Transfer of the License for the Zion Nuclear Power Station from Zionsolutions, LLC to Exelon Generation Company, LLC | License Transfer | ||
EPID:L-2020-LRM-0044 | 9 June 2020 | Open | LRM | |||
EPID:L-2020-LLA-0077 | 13 April 2020 | Approved Closed | TSTF-566 | License Amendment | ||
EPID:L-2019-LRO-0049 | 11 February 2020 | Approved Closed | LRO | |||
EPID:L-2020-LLR-0011 | 24 January 2020 | Approved Closed | Letters to Use Provisions of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | Relief Request | 80 hours3.333 days <br />0.476 weeks <br />0.11 months <br /> | |
EPID:L-2020-LLA-0008 | 23 January 2020 | Approved Closed | TSTF-568 | License Amendment | ||
EPID:L-2019-LLQ-0003 | 5 December 2019 | Approved Closed | Request for Approval of Change to Quality Assurance Topical Report | LLQ | ||
EPID:L-2019-LRM-0086 | 20 November 2019 | Open | Presentation Slides for November 20, 2019, Pre-Application Meeting - Request for Revision to Quality Assurance Program Internal Audit Frequency | LRM | ||
EPID:L-2019-LRM-0075 | 4 November 2019 | Open | Pre-Application Meeting with Exelon Generation Company, LLC | LRM | ||
EPID:L-2019-LLA-0214 | 2 October 2019 | Withdrawn Closed | Emergency License Amendment Request: One Time Extension to the TS 3.8.1 Action A.3 Completion Time for an Inoperable Offsite Source | License Amendment | ||
EPID:L-2019-LLA-0205 | 26 September 2019 | Approved Closed | TSTF-372 | License Amendment | 175 hours7.292 days <br />1.042 weeks <br />0.24 months <br /> | |
EPID:L-2019-LLE-0020 | 10 September 2019 | Approved Closed | Exemption Request | 300 hours12.5 days <br />1.786 weeks <br />0.411 months <br /> | ||
EPID:L-2019-LLA-0197 | 5 September 2019 | Approved Closed | License Amendment Request - Proposed Change to the Technical Specifications to Revise the Allowable Value for Reactor Water Cleanup (RWCU) System Primary Containment Isolation | License Amendment | 750 hours31.25 days <br />4.464 weeks <br />1.027 months <br /> | |
EPID:L-2019-LLA-0185 | 28 August 2019 | Approved Closed | License Amendment Request - Deletion of Facility Operating License Conditions Related to Decommissioning Trust Provisions | License Amendment | 175 hours7.292 days <br />1.042 weeks <br />0.24 months <br /> | |
EPID:L-2019-LLR-0080 | 27 August 2019 | Open | Request to Use a Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI | Relief Request | 150 hours6.25 days <br />0.893 weeks <br />0.205 months <br /> |