Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
IR 05000139/1998201 | 11 June 1998 | Insp Rept 50-139/98-201 on 980514.No Violations Noted.Major Areas Inspected:Changes,Organization & Staffing,Review & Audit Functions,Radiation Protection Program & Reporting Requirements | |
IR 05000139/1990002 | 8 February 1990 | Insp Rept 50-139/90-02 on 900111.No Violations Noted.Major Areas Inspected:Safe Operation of Facility in long-term Shutdown,Licensee Preparations for Loading & Shipment of Spent Fuel & to Review Corrective Actions | |
IR 05000139/1988001 | 10 March 1988 | Insp Rept 50-139/88-01 on 8880111 & 0216.No Violations & Deviations Noted.Major Areas Inspected:Review of Events Reported by Licensee Involving Excessive Insertion Time of Shim Rod 3 & Gradual Loss of Excess Reactivity of Reactor | |
IR 05000139/1987001 | 25 August 1987 | Insp Rept 50-139/87-01 on 870727-28.Violations Noted. Major Areas Inspected:Reactor Operations Program,Including Organization,Audits & Reviews,Experiments,Health Physics Program,Environ Monitoring & Emergency Preparedness Program | Shutdown Margin |
IR 05000139/1986001 | 26 June 1986 | Partially Withheld Safeguards Insp Repts 50-139/86-01 & 50-139/86-02 on 860602-03 (Ref 10CFR2.790).No Violation or Deviation Noted.Major Areas Inspected:Plans,Procedures & Reviews & Fixed Site Physical Protection of SNM | |
IR 05000139/1985001 | 29 August 1985 | Insp Rept 50-139/85-01 on 850717-19.Violation Noted: Failure to Conduct 1984 Evacuation Drill & to Implement Licensed Operators Requalification Program | |
IR 05000139/1984001 | 4 June 1984 | IE Safeguards Insp Rept 50-139/84-01 on 840424.Violation Noted:Installation of Simple Magnetic Switch in Controlled Access Area Instead of Required Balanced Magnetic Switch. Details Withheld (Ref 10CFR2.790) | |
ML20058H190 | 29 July 1982 | IE Safeguards Insp Rept 50-139/82-02 on 820722.No Noncompliance Noted.Major Areas Inspected:Security Plan & Procedures,Protection of Snm,Access Control Alarm Sys Communications & Security Organization.Details Withheld | |
IR 05000139/1982001 | 22 June 1982 | IE Insp Rept 50-139/82-01 on 820608-11.No Noncompliance Noted.Major Areas Inspected:Organization,Logs,Records,Review & Audit,Requalification Training,Procedures,Surveillance, Experiments & Independent Insp & Reactor Operation |