IR 05000139/1984001

From kanterella
Jump to navigation Jump to search
IE Safeguards Insp Rept 50-139/84-01 on 840424.Violation Noted:Installation of Simple Magnetic Switch in Controlled Access Area Instead of Required Balanced Magnetic Switch. Details Withheld (Ref 10CFR2.790)
ML20197H197
Person / Time
Site: 05000139
Issue date: 06/04/1984
From: Norderhaug L, Schaefer D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To:
Shared Package
ML19269A252 List:
References
50-139-84-01, 50-139-84-1, NUDOCS 8406180363
Download: ML20197H197 (1)


Text

.

.

s

".

The information on this page is considered to be appropriate for public disclosure pursuant to 10 CFR 2.790 U. S. NUCLEAR REGULATORY COMMISSION

REGION V

Report No. 50-139/84-01 Docket No. 50-139 License No. R-73

Licensee: University of Washington College of Engineering, Loew Hall FH10 Seattle, Washington 98195 Facility Name: University of Washington Nuclear Reactor (UWNR)

Inspected at: Seattle, Washington Inspected Conducted: April 24, 1984 Date of Last Physical Security Inspection Visit: July 22, 1982

,

Type of Inspection: Unannounced Physical Security a

N Inspector: [p/d/[TY

" W.VScha' ef ' er, Physikrf fecurity Inspector Dite ' Signed

'

<

, Approved by: _

- m ' d t/ [ T 'f r- L. 'RI. 'ht rde r'haug , Citie f g Da te 'Si gfied -

Safeguards and Emergency W.eparedness Branch

,

,

,

, Inspection Summary 4 - Areas Inspected: Security Plan and Procedures, Protection of. Shil, Access Control, Alarm Systems, Locks and Keys; Communication, Response, Surveillance, Security Organization, Records and Reports, and Follow-Up Item D- from previous security inspection The inspection involved 7 hours8.101852e-5 days <br />0.00194 hours <br />1.157407e-5 weeks <br />2.6635e-6 months <br /> onsite by one.NRC inspecto Results: The licensee was found to be in compliance with NRC requirements within the areas inspected except for the following: Alarm Systems and Surveillanc ,

8406180363 840612 PDR ADOCK 05000 G,