Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
IR 05000277/201640425 August 2016Security Inspection Report 05000277/2016404 and 05000278/2016404 (Cover Letter Only)Affidavit
IR 05000277/200840328 April 2008IR 05000277-08-403, & IR 05000278-08-403, on 03/24/2008 - 03/28/2008, Peach Bottom Atomic Power Station, Units 2 & 3, Physical Protection. (Letter Only W/O OUO-SRI)Affidavit
IR 05000277/200840418 April 2008IR 05000277-08-404, IR 05000278-08-404, - Cover Letter for Peach Bottom Station - NRC Deviation Memorandum Inspection - Inattentive Security Officer Root Cause Corrective Action Evaluation - (Letter Only - Public) 04/18/2008Inattentive
Affidavit
IR 05000277/200740624 January 2008IR 05000277-07-406, and IR 05000278-07-406, on 12/05/2007 - 1/10/2008, for Peach Bottom, Units 2 and 3, Event FollowupSignificance Determination Process
Affidavit
ML0522104191 June 2005PI&R Inspection Requests for IR 05000277-05-006, 05000278-05-006, on 06/01 - 07/28/2005Temporary Modification
IR 05000277/200200313 June 2002IR 05000277-02-03, IR 05000278-02-03, on 03/31-05/18/2002; Exelon Generation Company, Peach Bottom Atomic Power Station; Units 2 and 3. Operability Evaluations. Non-cited Violation IdentifiedFitness for Duty
High Radiation Area
Fire Barrier
Contraband
Temporary Modification
Locked High Radiation Area
Significance Determination Process
Annual Radioactive Effluent Release Report
Process Control Program
Operability Determination
Power change
IR 05000277/200200229 April 2002IR 05000277/2002-002, IR 05000278/2002-002, on 02/17-03/30/2002; Exelon Generation Company, Peach Bottom Atomic Power Station; Units 2 and 3. Heat Sink Performance, Licensed Operator Requalification ProgramFire Barrier
Significance Determination Process
Scram Discharge Volume
Operability Determination
Power change
IR 05000277/20010151 March 2002IR 05000277/2001-015, IR 05000278/2001-015, on 12/30-02/16/2002; Exelon Generation Company, Peach Bottom Atomic Power Station; Units 2 and 3. Integrated ReportFire Barrier
Significance Determination Process
Operability Determination
Power change
IR 05000277/200101017 January 2002IR 05000277/2001-010, IR 05000278/2001-010, Peach Bottom Atomic Power Station Units 2 & 3, Inspection on 11/18/2001 - 12/29/2001related to Operability Evaluations. One Noncited Violation NotedFire Barrier
Internal Flooding
Temporary Modification
Significance Determination Process
Operability Determination
Power change