Semantic search

Jump to navigation Jump to search
 Start dateReporting criterionTitleEvent descriptionSystemLER
ENS 410818 September 2004 18:45:0010 CFR 50.73(a)(1), Submit an LERInvalid Emergency Feedwater ActuationThe following information was provided by the licensee via facsimile: At 1445 (hrs. EDT) on September 8, 2004 Crystal River Unit 3 experienced an invalid actuation of the B-Train of the Emergency Feedwater System. This occurrence is being reported in accordance with 10CFR50.73(a)(2)(iv)(A) and 50.73(a)(2)(iv)(B)(6) using the optional process described in 50.73(a)(1). A complete actuation of the B-Train of Emergency Feedwater occurred and the train started and functioned successfully. The A-Train of Emergency Feedwater was operating at the time, and it continued to operate successfully during and after the B-Train actuation. The licensee has notified the NRC resident inspector. See retraction of Event #41027 for related information.Feedwater
Emergency Feedwater System