Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20106E9182 April 20201 to Updated Final Safety Analysis Report, Chapter 7, Appendix 7B, Figures
ML20106E9272 April 20201 to Updated Final Safety Analysis Report, Chapter 10, Figures
ML20106E9372 April 20201 to Updated Final Safety Analysis Report, Chapter 13, Figures
ML20106E9402 April 20201 to Updated Final Safety Analysis Report, Chapter 14, Figures
ML15125A13730 April 2015EAL-1 Modes 1, 2, 3 & 4
CNS-15-030, EAL-2 Modes 5, 6 & Defueled30 April 2015EAL-2 Modes 5, 6 & Defueled
CNS-15-028, Drawing CN-1593-01.07, Flow Diagram of Main Steam Supply (SM)19 September 2011Drawing CN-1593-01.07, Flow Diagram of Main Steam Supply (SM)
ML09089078725 September 2008Drawing CN-1574-1.1, Rev 49, Flow Diagram of Nuclear Service Water System (Rn).
ML09089078811 September 2008Drawing CN-1574-1.2, Rev 49, Flow Diagram of Nuclear Service Water System Rn).
ML09089078611 September 2008Drawing CN-1574-1.0, Rev 52, Flow Diagram of Nuclear Service Water System (Rn).
ML06312022210 November 2005Drawing No. CN-2493-RN.00-040, Rev. 7A, Diesel Generator Building Nuclear Service Water System (Rn).
ML06312023218 October 2005Drawing No. CN-1232-1, Rev. 44A, Auxiliary Building Diesel Generator Area Unit 2 Floor Plan EL.556+0 Concrete.
ML05257006321 September 2005Attachment 4, Meeting Summary, Ventilation Systems Amendment
ML05257005221 September 2005Attachment 1, Meeting Summary, Ventilation Systems AmendmentHigh Radiation Area
ML05257005921 September 2005Attachment 2, Meeting Summary, Ventilation Systems Amendment
ML05257006121 September 2005Attachment 3, Meeting Summary, Ventilation Systems Amendment
ML05257006421 September 2005Attachment 5, Meeting Summary, Ventilation Systems Amendment
ML05257006521 September 2005Attachment 6, Meeting Summary, Ventilation Systems Amendment
ML05257006821 September 2005Attachment 8, Meeting Summary, Ventilation Systems Amendment
ML05257006921 September 2005Attachment 9, Meeting Summary, Ventilation Systems Amendment
ML05257007021 September 2005Attachment 10, Meeting Summary, Ventilation Systems Amendment
ML05257007121 September 2005Attachment 11, Meeting Summary, Ventilation Systems Amendment
ML05257007621 September 2005Attachment 12, Meeting Summary, Ventilation Systems Amendment
ML05257006721 September 2005Attachment 7, Meeting Summary, Ventilation Systems Amendment
ML05257007821 September 2005Attachment 13, Meeting Summary, Ventilation Systems Amendment
ML06312022129 June 2005Drawing No. CN-2493-RN.00-039, Rev. 9A, Diesel Generator Building Nuclear Service Water System Rn 2A.
ML0631202263 March 2005Drawing No. CN-1231-1, Rev. 41A, Auxiliary Building Diesel Generator Area Unit 1 Floor Plan El. 556+0 Concrete.
ML05061001917 February 2005Request for Relief Number 05-CN-001 Limited Weld Examinations During End-of-Cycle 14 Refueling OutageStress corrosion cracking
Through Wall Leak
Unidentified leakage
Thermal fatigue
ML0426004218 September 2004Request for Relief Number 03-001, Reply to Request for Additional InformationSafe Shutdown Earthquake
Stress corrosion cracking
Flow Induced Vibration
Unidentified leakage
Operational leakage
ML04149012713 December 2003Drawing CN-1562-1.1, Rev 21, Flow Diagram of Safety Injection System (Ni).
ML0414901233 December 2003Drawing CN-1561-1.1, Rev 19, Flow Diagram of Residual Heat Removal System (Nd).
ML0414901203 December 2003Drawing CN-1561-1.0, Rev 25, Flow Diagram of Residual Heat Removal System (Nd).
ML0414901323 December 2003Drawing CN-1562-1.2, Rev 23, Flow Diagram of Safety Injection System (Ni).
ML0414901403 December 2003Drawing CN-1562-1.3, Rev 13, Flow Diagram of Safety Injection System (Ni).
ML0414901193 June 2002Drawing CN-1554-1.0, Rev 22, Flow Diagram of Chemical and Volume Control System (Nv).
ML0414901428 February 2002Drawing CN-1553-1.0, Rev 27, Flow Diagram of Injection Coolant System (Nc).