Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20266A788 | 13 January 1987 | Radioactive Waste Management Program TMI-2 Groundwater Monitoring,Groundwater Tritium Concentrations at Site Liquid Monitoring Stations. Sheet 1 of 2 | |
ML20266A794 | 13 January 1987 | Radioactive Waste Management Program TMI-2 Groundwater Monitoring,Groundwater Tritium Concentrations at Site Liquid Monitoring Stations. Sheet 2 of 2 | |
ML20024B510 | 6 July 1983 | Figure 6, Makeup Tank Flow Regimes. | |
ML20024B502 | 6 July 1983 | Figure 3, Lumped Flow Resistance Model. | |
ML20024B505 | 6 July 1983 | Figure 5-1, Flow Regime 1. | |
ML20024B509 | 6 July 1983 | Figure 5-3, Flow Regime 3. | |
ML20024B513 | 6 July 1983 | Figure 8, Calculated Makeup Tank Level. | |
ML20024B514 | 6 July 1983 | Figure 9, Makeup Tank Level. | |
ML20024B519 | 6 July 1983 | Figure 12, Calculated Makeup Tank Level,780423. | |
ML20024B521 | 6 July 1983 | Figure 13, Makeup Tank Level. | |
ML20024B507 | 6 July 1983 | Figure 5-2, Flow Regime 2. | |
ML20024B515 | 6 July 1983 | Figure 10, Calculated Makeup Tank Level. | |
ML20024B517 | 6 July 1983 | Figure 11, Makeup Tank Level,780423. | |
ML20259C385 | 3 June 1983 | OTSG Tube Repair,Rcs Cleanup;Otsg Test Program. Sheet 65 of 68 | |
ML20259C390 | 3 June 1983 | Hot Functional Test Logic. Sheet 66 of 68 | |
ML20259C394 | 3 June 1983 | Zero and Low Power Test Logic. Sheet 67 of 68 | |
ML20259C400 | 3 June 1983 | Power Escalation Test Logic. Sheet 68 of 68 | |
ML20085A521 | 13 April 1982 | Sketch of Piping & Valves | |
ML20085A438 | 30 September 1981 | Sketching of Hot Leg | |
ML20259C594 | 29 December 1978 | Ventilation & Purge:Reactor Bldg, (Plan at Elevation 305 Ft) | |
ML20259C526 | 29 December 1978 | Heating & Ventilation:Emergency Diesel Generator Bldg | |
ML20259C582 | 29 December 1978 | Heating,Ventilation & Air Conditioning:Control Bldg, (Mechanical Room) | |
ML20259C507 | 29 December 1978 | Heating & Ventilation:Auxiliary Bldg,(Sections & Part Plans Elevation 258 Ft,6 Inches & 354 Ft) | |
ML20259C504 | 31 October 1978 | Heating & Ventilation:Auxiliary Bldg,(Sections A-A,B-B, & C-C) | |
ML20259C559 | 30 October 1978 | Heating & Ventilation:Coagulator Bldg, (Plan & Sections) | |
ML20259C592 | 10 October 1978 | Ventilation & Purge:Reactor Bldg, (Plan at Elevation 282 Ft 6 Inches & 347 Ft,6 Inches) | |
ML20259C599 | 29 January 1978 | Ventilation & Purge:Reactor Bldg, (Sections) | |
ML20259C533 | 17 January 1978 | Heating,Ventilation & Air Conditioning:Svc Bldg, (Plan Elevation 305 Ft & Sections).19 | |
ML20259C499 | 28 October 1977 | Heating & Ventilation:Auxiliary Bldg,(Sections D-D,E-E,F-F & G-G,Elevation 328 Ft) | |
ML20024B528 | 24 September 1977 | Graph of Davis Besse Reactor Trip from 9% Full Power.Drawing of PWR & Toledo Edison Organization Chart Encl | |
ML20024B497 | 24 September 1977 | Graph Representing Temp & Pressure Levels Vs Time at Davis-Besse on 770924 | |
ML20259C511 | 12 September 1977 | Heating & Ventilation:Fuel Handling Bldg, (Plan & Sections, Elevation 347 Ft,6 Inches) | |
ML20259C488 | 12 September 1977 | Heating & Ventilation:Control Bldg Area & Svc Bldg, (Plan Elevation 280 Ft,6 Inches | |
ML20259C537 | 12 September 1977 | Heating,Ventilation & Air Conditioning:Svc Bldg, (Plan Elevation 322 Ft & 331 Ft,6 Inches & Sections) | |
ML20259C547 | 19 August 1977 | Heating,Ventilation & Air Conditioning:Control Bldg-Control Room | |
ML20259C551 | 19 August 1977 | Heating,Ventilation & Air Conditioning:Control Bldg-Control Room, (Sections) | |
ML20259C578 | 7 June 1977 | Ventilation & Purge:Reactor Bldg, (Enlarged Plan-Elevation 282 Ft,6 Inches) | |
ML20259C612 | 6 June 1977 | Floor & Equipment Drains:Turbine Bldg-East Side, (Plan Elevation 305 Ft) | |
ML20259C530 | 19 January 1977 | Heating & Ventilation:Emergency Diesel Generator Bldg | |
ML20259C608 | 15 June 1976 | Floor & Equipment Drains:Reactor Bldg & Control Bldg, (Area Elevation 282 Ft,6 Inches) | |
ML20259C555 | 8 June 1976 | Heating & Ventilation:Circulation Water Chlorinator House, (Plans & Sections) | |
ML20259C564 | 15 April 1976 | Heating & Ventilation:Turbine Bldg-North Side, (Elevation 331 Ft,6 Inches Plan & Sections) | |
ML20259C573 | 1 April 1976 | Heating & Ventilation:Turbine Bldg-South Side, (Elevation 305 Ft Plan & Sections) | |
ML20259C544 | 4 December 1975 | Heating & Ventilation:Turbine Bldg-South Side, (Elevation 281 Ft,6 Inches,Plan & Sections) | |
ML20259C586 | 4 December 1975 | Heating,Ventilation & Air Conditioning:Control Bldg, (Cable Room) | |
ML20259C497 | 15 October 1975 | Heating & Ventilation:River Water Pump House | |
ML20259C571 | 18 April 1975 | Heating & Ventilation:Turbine Bldg-North Side, (Elevation 305 Ft Plan & Sections) | |
ML20259C540 | 18 April 1975 | Heating & Ventilation:Turbine Bldg-North Side, (Elevation 281 Ft,6 Inches,Plan & Sections) | |
ML20259C618 | 5 November 1974 | Floor & Equipment Drains:Auxiliary & Fuel Handling Bldg (Plan Elevation 258 Ft,6 Inches & 280 Ft,6 Inches) | |
ML20259C614 | 2 August 1974 | Floor & Equipment Drains:Reactor Bldg, (Plan Elevation 305 Ft) |