Semantic search

Jump to navigation Jump to search
 Issue dateTitleTopic
ML20266A78813 January 1987Radioactive Waste Management Program TMI-2 Groundwater Monitoring,Groundwater Tritium Concentrations at Site Liquid Monitoring Stations. Sheet 1 of 2
ML20266A79413 January 1987Radioactive Waste Management Program TMI-2 Groundwater Monitoring,Groundwater Tritium Concentrations at Site Liquid Monitoring Stations. Sheet 2 of 2
ML20024B5106 July 1983Figure 6, Makeup Tank Flow Regimes.
ML20024B5026 July 1983Figure 3, Lumped Flow Resistance Model.
ML20024B5056 July 1983Figure 5-1, Flow Regime 1.
ML20024B5096 July 1983Figure 5-3, Flow Regime 3.
ML20024B5136 July 1983Figure 8, Calculated Makeup Tank Level.
ML20024B5146 July 1983Figure 9, Makeup Tank Level.
ML20024B5196 July 1983Figure 12, Calculated Makeup Tank Level,780423.
ML20024B5216 July 1983Figure 13, Makeup Tank Level.
ML20024B5076 July 1983Figure 5-2, Flow Regime 2.
ML20024B5156 July 1983Figure 10, Calculated Makeup Tank Level.
ML20024B5176 July 1983Figure 11, Makeup Tank Level,780423.
ML20259C3853 June 1983OTSG Tube Repair,Rcs Cleanup;Otsg Test Program. Sheet 65 of 68
ML20259C3903 June 1983Hot Functional Test Logic. Sheet 66 of 68
ML20259C3943 June 1983Zero and Low Power Test Logic. Sheet 67 of 68
ML20259C4003 June 1983Power Escalation Test Logic. Sheet 68 of 68
ML20085A52113 April 1982Sketch of Piping & Valves
ML20085A43830 September 1981Sketching of Hot Leg
ML20259C59429 December 1978Ventilation & Purge:Reactor Bldg, (Plan at Elevation 305 Ft)
ML20259C52629 December 1978Heating & Ventilation:Emergency Diesel Generator Bldg
ML20259C58229 December 1978Heating,Ventilation & Air Conditioning:Control Bldg, (Mechanical Room)
ML20259C50729 December 1978Heating & Ventilation:Auxiliary Bldg,(Sections & Part Plans Elevation 258 Ft,6 Inches & 354 Ft)
ML20259C50431 October 1978Heating & Ventilation:Auxiliary Bldg,(Sections A-A,B-B, & C-C)
ML20259C55930 October 1978Heating & Ventilation:Coagulator Bldg, (Plan & Sections)
ML20259C59210 October 1978Ventilation & Purge:Reactor Bldg, (Plan at Elevation 282 Ft 6 Inches & 347 Ft,6 Inches)
ML20259C59929 January 1978Ventilation & Purge:Reactor Bldg, (Sections)
ML20259C53317 January 1978Heating,Ventilation & Air Conditioning:Svc Bldg, (Plan Elevation 305 Ft & Sections).19
ML20259C49928 October 1977Heating & Ventilation:Auxiliary Bldg,(Sections D-D,E-E,F-F & G-G,Elevation 328 Ft)
ML20024B52824 September 1977Graph of Davis Besse Reactor Trip from 9% Full Power.Drawing of PWR & Toledo Edison Organization Chart Encl
ML20024B49724 September 1977Graph Representing Temp & Pressure Levels Vs Time at Davis-Besse on 770924
ML20259C51112 September 1977Heating & Ventilation:Fuel Handling Bldg, (Plan & Sections, Elevation 347 Ft,6 Inches)
ML20259C48812 September 1977Heating & Ventilation:Control Bldg Area & Svc Bldg, (Plan Elevation 280 Ft,6 Inches
ML20259C53712 September 1977Heating,Ventilation & Air Conditioning:Svc Bldg, (Plan Elevation 322 Ft & 331 Ft,6 Inches & Sections)
ML20259C54719 August 1977Heating,Ventilation & Air Conditioning:Control Bldg-Control Room
ML20259C55119 August 1977Heating,Ventilation & Air Conditioning:Control Bldg-Control Room, (Sections)
ML20259C5787 June 1977Ventilation & Purge:Reactor Bldg, (Enlarged Plan-Elevation 282 Ft,6 Inches)
ML20259C6126 June 1977Floor & Equipment Drains:Turbine Bldg-East Side, (Plan Elevation 305 Ft)
ML20259C53019 January 1977Heating & Ventilation:Emergency Diesel Generator Bldg
ML20259C60815 June 1976Floor & Equipment Drains:Reactor Bldg & Control Bldg, (Area Elevation 282 Ft,6 Inches)
ML20259C5558 June 1976Heating & Ventilation:Circulation Water Chlorinator House, (Plans & Sections)
ML20259C56415 April 1976Heating & Ventilation:Turbine Bldg-North Side, (Elevation 331 Ft,6 Inches Plan & Sections)
ML20259C5731 April 1976Heating & Ventilation:Turbine Bldg-South Side, (Elevation 305 Ft Plan & Sections)
ML20259C5444 December 1975Heating & Ventilation:Turbine Bldg-South Side, (Elevation 281 Ft,6 Inches,Plan & Sections)
ML20259C5864 December 1975Heating,Ventilation & Air Conditioning:Control Bldg, (Cable Room)
ML20259C49715 October 1975Heating & Ventilation:River Water Pump House
ML20259C57118 April 1975Heating & Ventilation:Turbine Bldg-North Side, (Elevation 305 Ft Plan & Sections)
ML20259C54018 April 1975Heating & Ventilation:Turbine Bldg-North Side, (Elevation 281 Ft,6 Inches,Plan & Sections)
ML20259C6185 November 1974Floor & Equipment Drains:Auxiliary & Fuel Handling Bldg (Plan Elevation 258 Ft,6 Inches & 280 Ft,6 Inches)
ML20259C6142 August 1974Floor & Equipment Drains:Reactor Bldg, (Plan Elevation 305 Ft)